4 floors · 4 apartments · 4,000 sq ft · built 1910 · class C6 · owner of record: 326 East 30th Street Owners Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 44 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 8, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/COMM'S ORDER CONTAINED IN VIO#35332962H ISSUED ON 08/22/18 AND TO FILE A COFC PURSUANT TO 28-201.1 AND 1RCNY 102-01. FAILUR TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.REM:COMPLY W/COMM'S O #35515165Z | Nov 19, 2020 IN VIOLATION | $0 |
| Oct 19, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35332991H ISSUED ON 08-22-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35431140Y | Feb 6, 2020 IN VIOLATION | $0 |
| Aug 22, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3;27-345. IN THAT APT#4 ON THE 4TH FL FIRE STOPPING IS MISSING IN THE LIVING ROOM. SHEETROCK CEILING WAS REMOVED. ALSO THERE IS A #35332961H | Jan 31, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00044 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 8, 2019 | B | Apt 4 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APROX 5 SQ FT AT CLOSET CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4 UPPER LEVEL, 3rd STORY, APARTMENT AT NORTH ORIGINAL VIOLATION 13111362 ISSUED 06-JUN-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRA | Nov 12, 2019 |
| Aug 19, 2019 | B | Apt 4 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... EAST CLOSET CEILING APPROXIMATELY 15 SQ FT 2ND FLOOR DUPLEX IN THE 1st ROOM FROM NORTH LOCATED AT APT 4, 3rd STORY | Sep 23, 2019 |
| Aug 19, 2019 | A | Apt 4 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 22, 2019 |
| Aug 19, 2019 | B | Apt 4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4, 3rd STORY | Sep 23, 2019 |
| Aug 19, 2019 | B | Apt 4 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4, 3rd STORY | Sep 23, 2019 |
| Jun 10, 2019 | B | Apt 4 · § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 15, 2019 |
| Jun 10, 2019 | B | Apt 4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 14, 2019 |
| Jun 10, 2019 | B | Apt 4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CLOSET CEILING AND WALLS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4 UPPER LEVEL, 3rd STORY, APARTMENT AT NORTH | Aug 14, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 10:37 PM ET. BBL 1009350046.