5 floors · 50,000 sq ft · built 1864 · class O5 · owner of record: 325 Broadway Associates
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-10-16 (Accepted). Agency page | Dec 31, 2026 in 69 days | 1 of 1 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 50,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 20, 2026 | Construction CLASS - 2 NO CERTIFICATE OF CORRECTION ON FILE PER COMMISSIONER'S REQUEST FOR CLASS 1 WORK-WITHOUT-PERMIT VIOLATION #39153847X ISSUED 7/16/2025, CITING CELLAR BUILD-OUT WITH PARTITIONS, BEDROOMS, 3-PC BATHROOM, ELECTRICA #39201205H | Oct 29, 2026 PENDING | $1,250 |
| Jul 16, 2026 | Construction CLASS - 2 NO CERTIFICATE OF CORRECTION ON FILE AS PER COMMISSIONER'S REQUEST FOR CLASS 1 WORK-WITHOUT-PERMIT VIOLATION #35673552M ISSUED 8/28/2023 FOR UNPERMITTED ELECTRICAL, PLUMBING, AND WASTE LINE WORK AT THE CELLAR M #39196419J | Nov 5, 2026 PENDING | $1,250 |
| Jun 16, 2026 | Construction CLASS - 2 FAILURE TO CONDUCT A FINAL INSPECTION FOR WORK WITH THE DEPT OF BUILDINGS AT TIME OF INSPECTION OBSERVED PERMIT#M00628687-S1-MS EXPIRES ON 1/05/2023 AND PERMIT # M00631919-I1-PL EXPIRES ON 1/03/2023 WHICH STILL #39192791H | Oct 1, 2026 DEFAULT | $1,280 |
| Jul 16, 2025 | Construction CLASS - 1 FAILURE TO COMPLY AND CERTIFY CERTIFICATE OF CORRECTION FOR VIOLATION # 35673552M, ISSUED ON 8/27/2023 FOR WORK WITHOUT PERMIT., COMPLY WITH COMMISSIONER'S ORDER #39153847X | Sep 25, 2025 IN VIOLATION | $0 |
| Aug 28, 2023 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY DEPT OF BUILDINGS RECORDS.ILLEGAL OCCUPANCY NOTED:AT CELLAR LEVEL HAS BEEN CONVERTED/OCCUPIED AS MASSAGE PALOR"SPA MIEIG"WITH 4 MASSAGE ROOMS,OILS AND TOWELS.COMPLY WITH CO #35673551K | Sep 5, 2024 IN VIOLATION | $0 |
| Aug 28, 2023 | Construction CLASS - 1 WORK W/O PERMIT.WORK NOTED:AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITION WALLS TO CREATE MASSAGE RM & BREAK RM; INSTALLED WATER & WASTE LINES FOR WASH MACHINE & HOT WATER BOILER; INSTALLED ELECTRICAL LINES FOR #35673552M | Sep 5, 2024 IN VIOLATION | $0 |
| Aug 28, 2023 | Zoning CLASS - 2 ILLEGAL USE IN A COMMERCIAL DISTRICT.UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT A PROHIBITED USE PER ZR12-10,OPERATING IN C6-4A DISTRICT ON CELLAR LEVEL. MASSAGE PARLOR W/O LICENSE"SPA MEIG",4RMS,OIL,TOWELS #35673550Z | Sep 5, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 8, 1998 | PLUMBING #STE01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 20, 2026 | ECB | Construction: NO CERTIFICATE OF CORRECTION ON FILE PER COMMISSIONER'S REQUEST FOR CLASS 1 WORK-WITHOUT-PERMIT VIOLATION #39153847X ISSUED 7/16/2025, CITING CELLAR BUILD-OUT WITH PARTITIONS, BEDROOMS, 3-PC BATHROOM, ELECTRICA | Open |
| Jul 16, 2026 | ECB | Construction: NO CERTIFICATE OF CORRECTION ON FILE AS PER COMMISSIONER'S REQUEST FOR CLASS 1 WORK-WITHOUT-PERMIT VIOLATION #35673552M ISSUED 8/28/2023 FOR UNPERMITTED ELECTRICAL, PLUMBING, AND WASTE LINE WORK AT THE CELLAR M | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 2:00 AM ET. BBL 1001520025.