6 floors · 42 apartments · 41,000 sq ft · built 1940 · class D4 · owner of record: 3245 Perry Ave Ownrs
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 41,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-16 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 16, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 EAST-CRACKED BRICK AT SPANDRELS BY FIRE ESCAPE.-EXP #3 WEST-(1)CRACKED/SPALLING BRICK AT WINDOW SPANDRE #35718226N | Feb 4, 2027 | $5,000 |
| Issued | Violation | Status |
|---|---|---|
| Aug 5, 2025 | CONSTRUCTION VACATE ORDER DUE TO IMMEDIATELY HAZARDOUS CONDITIONS SUCH AS BULGING, CRACKED & DISPLACED MASONRY BRICKS ON THE CHIMNEY ABOVE EXPOSURE #4 NORTH COURTYARD. THESE CONDITIONS HAVE MADE THE REAR COURTYARD @ EXP 4 NORTH UNABLE TO BE OCCUPIED. REMEDY: IMMEDIATELY VACATE REAR COURTYARD AT EXP#4 NORTH #FA0701DD | DOB VIOLATION - ACTIVE |
| Jul 16, 2025 | CONSTRUCTION EMERGENCY WORK ORDER FOR DETERIORATED CHIMNEY WITH CRACKED/DISPLACED BRICKS OVERLOOKING EXP#4 NORTH COURTYARD. REMEDY: IMMEDIATELY TAKE AND PROVIDE ADEQUATE SAFETY MEASURES AT EXP#4 NORTH COURTYARD ADDITIONALLY-MAKE IMMEDIATE AND ADEQUATE REPAIRS TO DEFECTIVE CHIMNEY UNDER THE FULL SUPERVISION OF A #FA0703DD | DOB VIOLATION - ACTIVE |
| Dec 28, 2007 | ELEVATOR #9444/232585 | DOB VIOLATION - ACTIVE |
| Mar 8, 1996 | LOCAL LAW 10/81 - ELEVATOR #01884 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Mar 8, 1996 | Elevators LL1081 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 10, 2025 | C | Apt 1A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM WEST AT NORTH | Apr 24, 2025 |
| Apr 10, 2025 | C | Apt 3A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 24, 2025 |
| Apr 10, 2025 | C | Apt 4E · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 24, 2025 |
| Apr 10, 2025 | C | Apt 5F · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 24, 2025 |
| Apr 10, 2025 | A | Apt 6B · § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 14, 2025 |
| Apr 10, 2025 | A | Apt 5F · § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 14, 2025 |
| Apr 10, 2025 | A | Apt 4E · § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 14, 2025 |
| Apr 10, 2025 | B | Apt 3A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | May 15, 2025 |
| Apr 10, 2025 | B | Apt 1F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH IN THE ENTRANCE LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | May 15, 2025 |
| Apr 10, 2025 | C | Apt 6B · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 24, 2025 |
| Apr 10, 2025 | C | Apt 1F · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH IN THE ENTRANCE LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 24, 2025 |
| Apr 10, 2025 | C | Apt 4F · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 24, 2025 |
| Aug 30, 2021 | C | Apt 4G · § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 25, 2021 |
| Aug 30, 2021 | C | Apt 4G · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES .. IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 5, 2021 |
| Aug 30, 2021 | A | Apt 4G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 3, 2021 |
| Aug 20, 2021 | B | Apt 1B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WALLS AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2021 |
| Aug 20, 2021 | C | Apt 4B · § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT ENTRANCE LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 15, 2021 |
| Aug 20, 2021 | B | Apt 4B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE BATHTUB IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2021 |
| Aug 20, 2021 | B | Apt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2021 |
| Aug 20, 2021 | B | Apt 4B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2021 |
| Aug 20, 2021 | A | Apt 1B · § 27-2005 ADM CODE REFIT DOOR AT ENTRANCE LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 23, 2021 |
| Aug 20, 2021 | C | Apt 1B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 15, 2021 |
| Aug 20, 2021 | C | Apt 1B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 15, 2021 |
| Aug 20, 2021 | B | Apt 1B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE TUB IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2021 |
| Aug 20, 2021 | B | Apt 1B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2021 |
| Aug 18, 2021 | B | Apt 5F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... ALL WALLS ( 10 SQ FT ) IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 22, 2021 |
| Aug 18, 2021 | B | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 22, 2021 |
| Aug 18, 2021 | A | Apt 5F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS, WALLS, DOORS AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 21, 2021 |
| Aug 18, 2021 | B | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 22, 2021 |
| Mar 17, 2006 | C | Apt 1C · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 1C, 1st STORY, 2nd APARTM | Apr 26, 2006 |
| Mar 17, 2006 | C | Apt 4C · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 4C, 4th STORY, 2nd APARTM | Apr 26, 2006 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 8:51 PM ET. BBL 2033430076.