1 floors · 12,000 sq ft · built 1999 · class K1 · owner of record: 3200 Tremont Associates Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 774 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 15, 2021 | Construction CLASS - 2 ENCROACHMENT INTO A PUBLIC RIGHT WAY. NOTED: 3231 EAST TREMONT AVE. SIDE OF BUILDING, METAL AND PLEXIGLASS SHEET STRUCTURE ERECTED AND ATTACHED TO BUILDING ENCROACHING ONTO A PUBLIC SIDEWALK APPROXIMATELY 35FT #39035711J | Apr 2, 2021 DEFAULT | $0 |
| Oct 26, 2016 | Zoning CLASS - 2 32-653ON AWNING SIZE OF LETTERING IS 12"MAX AND 12 SQ FT MAXIMUM TOTALWORDING.NOTED:THE LETTERING AREA ON THE AWNING IS MORE THAN 12 SQ.FT (APPROXIMATELY 24 SQUARE FT.)REMEDY: COMPLY WITH ZONING RESOLUTION #35112510Y | Dec 16, 2016 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 15, 2021 | CONSTRUCTION COMMISSIONER S ORDER FOR CORRECTIVE ACTIONS. NOTED: FOLLOWING CONDITIONS ARE TO BE RESTORED IMMEDIATELY. RESTORE PUBLIC RIGHT WAY (SIDEWALK) ALONG 3231 EAST TREMONT AVE. SIDE OF BUILDING TO PREVIOUS LEGAL CONDITION. REMOVE OBSTRUCTION. #21-00090 | DOB VIOLATION - ACTIVE |
| Jan 15, 2021 | CONSTRUCTION WORK WITHOUT A PERMIT. NOTED: METAL AND PLEXIGLASS SHEET STRUCTURE ERECTED ON 3231 EAST TREMONT AVE SIDEWALK AND ATTACHED TO BUILDING AND FULLY ENCLOSED, APPROXIMATELY 35FT IN LENGTH X 12FT IN WIDTH X 12FT IN HEIGHT TO PROVIDE ADDITIONAL SEATING TO EXISTING EATING AND DRINKING ESTABLISHMENT. 100% CO #21-00091 | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 9:55 PM ET. BBL 2053310007.