4 floors · 9 apartments · 4,540 sq ft · built 1890 · class C5 · owner of record: Bsp Grace Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-04-17 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 16, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# 35249697K ISSUED ON 06/18/18 AND TO FILE A CERTIFICATE OR CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR WORK WITHOU A PERM #35390744R | Aug 1, 2019 IN VIOLATION | $2,500 |
| Nov 21, 2018 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35249697K ISSUED ON 06/18/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR WORK W/O A PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE #35392075H | Mar 7, 2019 IN VIOLATION | $1,250 |
| Sep 29, 2018 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35249697K ISSUED ON 06/18/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C #35389655R | Nov 15, 2018 IN VIOLATION | $2,500 |
| Aug 6, 2018 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35249697K ISSUED ON 06/18/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.AT 1ST AND 2ND FLOOR WOR #35386886K | Sep 20, 2018 IN VIOLATION | $2,500 |
| Aug 6, 2018 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMSSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35322616H ISSUED ON 6/23/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.UNLAWFULLY CONTINUED WORKI #35386885Z | Sep 20, 2018 IN VIOLATION | $799 |
| Jun 23, 2018 | Construction CLASS - 1 UNLAWFUL ACTS.FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER.@THE TIME OF INSP IT WAS OBSERVED THAT CONST OP.WAS ONGOING WHILE STOP WORK ORDER WAS IN PLACE VIO(#35249697K) WAS ISSUED UNDER COMPLIAINT #1480728 #35322616H | Oct 4, 2018 IN VIOLATION | $2,500 |
| Jun 18, 2018 | Construction CLASS - 1 WORK WITHOUT A PERMIT. WORK NOTED: AT TIME OF INSPECTION FULL GUT RENOVATIONS ARE BEING DONE IN APARTMENT ON THE 1ST AND 2ND FLOOR. ALL NEW PLUMBING FIXTURES BEING INSTALLED. ALSO, ELECTRICAL WORK BEING DONE. N #35249697K | Sep 27, 2018 IN VIOLATION | $1,600 |
| Dec 28, 2000 | HPD Hazardous OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPARTMENT RECORDS.CLASS "A" APT CREATED IN THE BASEMENT INCREASING THE OCCUPANCY FROM 8 TO 9. #34215163Y | May 3, 2001 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 19, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00068 | DOB VIOLATION - ACTIVE |
| Aug 14, 2018 | LANDMARK #19-0053 | DOB VIOLATION - ACTIVE |
| Jul 31, 2001 | LANDMARK #02-0083 | DOB VIOLATION - ACTIVE |
| Jul 31, 2001 | LANDMARK #02-0084 | DOB VIOLATION - ACTIVE |
| Jul 31, 2001 | LANDMARK #02-0085 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 19, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 31, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE , 1st STORY | Sep 14, 2026 |
| Aug 31, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT VESTIBULE DOOR , 1st STORY | Oct 5, 2026 |
| Jul 17, 2026 | B | Apt 1A · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF RUSTED GATE AT SECONDARY EGRESS/ FIRE ESCAPE WINDOW AT 1ST WINDOW FROM SOUTH AT WEST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 21, 2026 |
| Jul 17, 2026 | B | Apt 1A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT 1ST WINDOW FROM SOUTH AT WEST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 21, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 31, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE , 1st STORY | Open |
| Aug 31, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT VESTIBULE DOOR , 1st STORY | Open |
| Jul 17, 2026 | HPD B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF RUSTED GATE AT SECONDARY EGRESS/ FIRE ESCAPE WINDOW AT 1ST WINDOW FROM SOUTH AT WEST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 17, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT 1ST WINDOW FROM SOUTH AT WEST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 11:49 PM ET. BBL 1020590111.