3 floors · 8 apartments · 3,559 sq ft · built 1940 · class C1 · owner of record: 3217 Cruger Associates Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 51 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 67 days | Annual |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 416 days | Next cycle year 2027 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 7, 2026 | A | Apt 3C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 10, 2027 |
| Oct 7, 2026 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 11, 2026 |
| Sep 21, 2026 | C | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CONSISTING OF HOUSEHOLD AND ACCUMULATED RUBBISH YARD | Sep 27, 2026 |
| Apr 30, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 3, 2026 |
| Dec 8, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Mar 13, 2026 |
| Dec 8, 2025 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Mar 13, 2026 |
| Dec 8, 2025 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME READILY ACCESSIBLE FOR SIGNATURE, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT MISSING AT PUBLIC HALL, 1st STORY | Mar 13, 2026 |
| Dec 8, 2025 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Mar 13, 2026 |
| Dec 8, 2025 | A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX MISSING AT PUBLIC HALL, 1st STORY | Mar 13, 2026 |
| Dec 8, 2025 | A | § 27-2022 ADM CODE POST A SIGN INDICATING HOURS OF COLLECTION AND METHOD OF COLLECTION OF WASTE MATERIAL WHERE DUMBWAITER SERVICE IS NOT PROVIDED. AT PUBLIC HALL, 1st STORY | Mar 13, 2026 |
| Dec 8, 2025 | A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS MISSING | Mar 13, 2026 |
| Dec 8, 2025 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY | Dec 14, 2025 |
| Aug 7, 2025 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 11, 2025 |
| Aug 7, 2025 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 11, 2025 |
| Jun 5, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 8, 2025 |
| Oct 24, 2024 | B | Apt 3C · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MISSING MECHANICAL VENTITALION AT CEILING IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 28, 2024 |
| Oct 24, 2024 | B | Apt 3C · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF AT CEILING IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 28, 2024 |
| Oct 23, 2024 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 27, 2024 |
| Oct 23, 2024 | B | Apt 3C · § 27-2005 HMC: REFIT UPPER WINDOW SASH IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 27, 2024 |
| Oct 23, 2024 | B | Apt 3C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF VERMIN WATERBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 27, 2024 |
| Oct 23, 2024 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 27, 2024 |
| Oct 23, 2024 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERABLE MAIL BOX LOCK DESIGNATED FOR APT 3C , 1st STORY | Nov 27, 2024 |
| Aug 19, 2024 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 23, 2024 |
| Aug 19, 2024 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 23, 2024 |
| Aug 12, 2024 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Nov 15, 2024 |
| Aug 12, 2024 | C | Apt 2C · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 11, 2024 |
| Aug 12, 2024 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Nov 15, 2024 |
| Aug 12, 2024 | B | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING (PAD LOCK) AT HATCH DOOR AT SCUTTLE AT PUBLIC HALL, 3rd STORY | Sep 16, 2024 |
| Aug 12, 2024 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Nov 15, 2024 |
| Aug 12, 2024 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING SIGN AT PUBLIC HALL, 1st STORY | Nov 15, 2024 |
| Aug 12, 2024 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLE CHAINED AND PADLOCKED AT SCUTTLE LADDER AT PUBLIC HALL, 3rd STORY | Sep 16, 2024 |
| Aug 12, 2024 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME READILY ACCESSIBLE FOR SIGNATURE, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT MISSING FRAME AT PUBLIC HALL, 1st STORY | Nov 15, 2024 |
| Aug 12, 2024 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Nov 15, 2024 |
| Apr 2, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 6, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 7, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 7, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 21, 2026 | HPD C | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CONSISTING OF HOUSEHOLD AND ACCUMULATED RUBBISH YARD | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 6:08 AM ET. BBL 2045960050.