2 floors · 8 apartments · 6,648 sq ft · built 1910 · class C1 · owner of record: 3215 Clarendon Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 20, 2025 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY COFO AND/OR THE DEPARTMENT OF BUILDING RECORDS.SLUDS AND SHEETROCK USED TO INCREASE THE OCCUPANCY OF A2 STORY TO A 5 STORY CONVERTED IT FROM A PRIVATE TO A MULTIPLE DWELLIN #35485993J | Nov 5, 2025 DEFAULT | $6,250 |
| Sep 12, 2019 | Site Safety CLASS - 1 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER RULE.AT THE TIME OF INSPECTION ON ACTIVE CONSTRUCTION SIE 5 STORY BUILDING WORK IN PROGRESS WORKER INSTALLED STUCCO AT EXTERIOR STAIRS,ANOTHER INSTALLED #35449298J | Jan 28, 2021 IN VIOLATION | $5,000 |
| Aug 10, 2019 | Construction CLASS - 1 NO AFTER HOUR VARIANCE PERMIT:AT THE TIME OF MY INSPECTION OF A 5 STORY BUILDING CURRENTLY AT ROOF LEVEL W/ CONSTRUCTION OPERATIONS IN PROGRESS. I OBSERVED WORKERS PLACING TILES,CUTTING TILES AND MIXING GROUT. #35440643K | Oct 26, 2020 IN VIOLATION | $2,500 |
| Aug 10, 2019 | Construction CLASS - 1 INADEQUATE HOUSEKEEPING:AT THE TIME OF MY INSPECTION OF A 5 STORY BUILDING AT ROOF LEVEL W/ CONSTRUCTION OPERATIONS IN PROGRESS. I OBSERVED CONCRETE DEBRIS,WOOD DEBRIS,GARBAGE AND MISCELLANEOUS MATERIALS SCATTE #35440646X | Oct 26, 2020 IN VIOLATION | $2,500 |
| Jul 2, 2019 | Construction CLASS - 1 SEC. 3303.4.1 SLIPPING & TRIPPING HAZARDS. NB: AT TIME OF MY INSPECTION OF A BLDG BEING VERTICALLY ENLARGED FROM 2 TO 5 STY TOPPED OFF AT ROOF STAGE ACTIVE JOB SITE. I OBSERVED SEVERAL LOOSED FLOOR BOARDS ON #35440111J | Dec 21, 2020 IN VIOLATION | $625 |
| Jul 2, 2019 | Construction CLASS - 1 HOUSEKEEPING. NOTE: AT TIME OF MY INSPECTION OF A BLDG BEING VERTICALLY ENLARGED TO 5 STY TOPPED OFF AT ROOF ACTIVE JOBSITE. I OBSERVED LARGE AMOUNT OF CONSTRUCTION DEBRIS & MATERIAL CLULTERED THRU-OUT ALL FLOO #35440112L | Dec 21, 2020 IN VIOLATION | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 18, 2026 | B | Apt 4R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST AND NORTH WALL IN THE KITCHEN LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 23, 2026 |
| Apr 8, 2025 | B | § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF FLOOR PIERCED SPIRAL STAIRS INSTALLED FROM 1ST STORY APARTMENT 1R LEADING TO CELLAR | May 13, 2025 |
| Apr 8, 2025 | B | § 27-2087 ADM CODE - DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS AT WATER CLOSET/ WASH BASIN AT CELLAR | May 13, 2025 |
| Apr 8, 2025 | B | § 9, 170, 171, 300, 301, 302 M.D.LAW-FILE PLANS AND APPLICATION AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE CONVERSION FROM A PRIVATE DWELLING TO MULTIPLE DWELLING USE IF LAWFULLY FEASIBLE OR RESTORE TO LAWFUL OCCUPANCY | May 13, 2025 |
| Mar 24, 2025 | B | Apt 1R · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 28, 2025 |
| Mar 24, 2025 | B | Apt 1R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 28, 2025 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 10:29 AM ET. BBL 3049320033.