3 floors · 6 apartments · 4,500 sq ft · built 1931 · class C2 · owner of record: 321 Harman Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-14 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 27, 2019 | Construction CLASS - 1 I OBSERVED IN CELLAR FOR APT #1R, FUTURE GAS CONNECTIONS ON GAS LINE WHICH IS PROHIBITED AND NOT CODE COMPLIANT, REPAIR AND/REPLACE #39013586M | Mar 5, 2021 IN VIOLATION | $1,250 |
| Nov 20, 2019 | Unknown CLASS - 1 UNAPPROVED, UNSAFE,UNSUITABLE ELECTRICAL EQUIPMENT DEVICES APPARATUS APPLIANCES MATERIALS OR WIRING IN USE.EXPORTED ELECTRICAL WIRING IN 1STFLOOR HALLWAY AND DEFECTIVE ELECTRICAL WIRING OR SERVICE SWITCH.REMEDY #35359517L | Jan 4, 2021 IN VIOLATION | $1,600 |
| Nov 20, 2019 | Unknown CLASS - 2 FAILURE TO SECURE SUPPORT RACEWAYS CABLES ASSEMBLIES BOXES CABINETS FITTINGS.CIRCUT BRAKER PANEL INSTALLED IN BASEMENT NOT PROPERLY SUPPORTED. REMEDY:SECURE SUPPORT PR EC #35359521Y | Jan 4, 2021 IN VIOLATION | $400 |
| Nov 20, 2019 | Unknown CLASS - 2 FAILURE TO PROVIDE EFFECTIVE ELECTRICAL CONTINULLY FOR METAL ENCLOSURES RACEWAYS ASSEMBLIESS CABLE ARMOR. SERVICE GROUND RACEWAY NOT CONTINUIOUS.REMEDY:PROVIDE EFFECTIVE ELECTICAL CONTINUITY. #35359519P | Jan 4, 2021 IN VIOLATION | $600 |
| Nov 20, 2019 | Plumbing CLASS - 1 I OBSERVED IN THE CELLAR AREA OF THE BUILDING NEWLY INSTALLED GAS PIPING FOR A NEW HOT WATER HEATER AND NEWLY INSTALLED GAS PIPING FOR STOVE IN APT# 1L AND 2 HEATING UNITS IN APT# 1R. NO RECORDS AT DOB OF ANY T #39013248J | May 13, 2021 IN VIOLATION | $2,500 |
| Nov 20, 2019 | Construction CLASS - 1 I OBSERVED IN APARTMENT# 1R AND 3R, GAS BEING SUPPLIED TO 2 HEATING UNITS WITH FLEXIBLE CONNECTORS, WHICH IS PROHIBITED AND NOT CODE-COMPLIANT.. AND ALSO NO MANUAL SHUTOFF VALVE AT EACH HEATING UNITS, SHALL COM #39013247H | May 13, 2021 IN VIOLATION | $1,250 |
| Nov 20, 2019 | Unknown CLASS - 2 FAILURE TO PROPERLY CONNECT CONDUCTORS TO TERMINALS.ARMORED CABLES IN BASEMENT NOT TERMINATED.REMEDY:PROVIDE PROPER CONNECTIONS. #35359522X | Jan 4, 2021 IN VIOLATION | $600 |
| Nov 20, 2019 | Unknown CLASS - 2 FAILURE TO PROVIDE COVER FACE PLATE LAMPHOLDERS LUMINARIRE CANOPY FOR ELETRICAL OUTLET.SPLICE BOX COVERS MISSING IN BASEMENT.REMEDY:COMPLY WIT EC CODE. #35359523H | Jan 4, 2021 IN VIOLATION | $250 |
| Nov 20, 2019 | Unknown CLASS - 1 FAILURE TO PROTECT CONDUCTORS AGAINST OVERCURRENT PER EC. NO OVERCURRENT PROTECTION PROVIDED IN SERVICE SWITCH IN BASEMENT.REMEDY:PROVIDE PROTECTION AGAINST OVERCURRENT. #35359520M | Jan 4, 2021 IN VIOLATION | $4,800 |
| Nov 20, 2019 | Plumbing CLASS - 1 I OBSERVED IN THE CELLAR AREA OF THE BUILDING GAS BEING SUPPLIED TO A HOT WATER HEATER AND 2 HEATING UNITS IN APARTMENT# 1R & 3R. WITHOUT ANY INSPECTIONS OR CERTIFICATION BY DOB. GAS COMPANY WAS NOTIFIED., FILE #39013252M | May 13, 2021 IN VIOLATION | $5,000 |
| Nov 20, 2019 | Unknown CLASS - 2 FAILURE TO SECURE SUPPORT RACEWAYS CABLE ASSEMBLIES BOXES FITTING CABINETS.LIGHTING RACEWAY AND BOXES NOT PROPERLY SUPPORTED IN FRONT OF BUILDLING. REMEDY:SECURE SUPPORT PER EC #35359518N | Jan 4, 2021 IN VIOLATION | $400 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #11521 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #32276 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #10529 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #10580 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #12994 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #10522 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #09532 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #10477 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #11525 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #09006 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #12014 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #14035 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #17825 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #17805 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #17544 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 1, 2023 | B | Apt 3L · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 6, 2023 |
| Aug 17, 2023 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Aug 21, 2023 |
| Aug 17, 2023 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Aug 21, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 4:28 AM ET. BBL 3032790038.