4 floors · 3 apartments · 5,380 sq ft · built 1889 · class S9 · owner of record: First Stuyvestant Holding Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 56 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2020-07-08 (Accepted). Agency page | Dec 31, 2026 in 56 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 72 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 300 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 787 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 7, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP# 1. MISSING PARAPET PANEL. OBSERVED PARAPET PANEL LAY ON THE SIDEWALK WITH PROTRUDING NAILS. DETERIORATED MUDSILL ALSO FIRE ESCAPE LADDER OBSTRUCTED #39555121Z | Nov 19, 2026 PENDING | $2,400 |
| Jul 1, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED INSTALLED AT EXPO# 1 MISSING PROJECT INFORMATION PANEL CONTRARY TO BC 3301.9.2. CREATING AN UNSAFE CONDITION FOR PUBLIC AND OCCUPIED ADJOINING PROPERTIES, SAFETY MO #39541852P | Sep 10, 2025 IN VIOLATION | $1,250 |
| Jun 17, 2025 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED IN PLACE EXPO# 1 WITH PERMIT# B00518250-I1-SH UPON REVIEW DEPARTMENT RECORD IT APPEAR SIDEWALK SHED HAVE EXPIRED ON 05/14/2022, CREATING AN UNSAFE CONDITION FOR PUB #39541496H | Aug 27, 2025 IN VIOLATION | $625 |
| Mar 16, 2025 | Construction CLASS - 2 AT THE TIME OF INSPECTION, I OBSERVED SIDEWALK SHED INSTALLED AT EXPOSURE 1 NOT MAINTAINED IN A SAFE CONDITION, SHED PANEL BULGING, DETERIORATING INCLUDING VERTICAL MEMBER NO PLUMB CONTRARY TO BC 3307.6.5.1 - S #39538033Y | Dec 11, 2025 IN VIOLATION | $2,400 |
| Mar 16, 2025 | Construction CLASS - 2 AT THE TIME OF INSPECTION, I OBSERVED SIDEWALK SHED INSTALLED AT EXPOSURE 1 WITH NO INFORMATION PANEL POSTED ON THE PARAPET OF THE SHED AS PER BC 3301.9.2.2 SIDEWALK SHED PARAPET INFORMATION PANELS SHALL BE POS #39538028J | Dec 11, 2025 IN VIOLATION | $1,250 |
| Mar 16, 2025 | Unknown CLASS - 2 AT THE TIME OF INSPECTION, I OBSERVED SIDEWALK SHED INSTALLED AT EXPOSURE 1, UPON REVIEW OF DOB RECORDS SHED PERMIT EXPIRED 05/14/2022 #39538029L | Dec 11, 2025 IN VIOLATION | $1,250 |
| Dec 3, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED THE EXTERIOR OF THE BUILDING IN STATE OF DISREPAIR. NOTED THE MASONRY BRICK SEPARATION OF THE JOINT BETWEEN THE REAR AND #39131778Y | Dec 15, 2025 IN VIOLATION | $1,250 |
| Oct 8, 2024 | Unknown CLASS - 2 AT THE TIME OF MY INSPECTION OF A SIDE WALK SHED PROVIDED TO PROTECT PEDESTRIANS , I OBSERVED THE PERMIT ISSUED ON 05-14-2021 WAS EXPIRED ON 05-14-2022. UPON REVIEW OF DOB RECORDS NO OTHER PERMIT WAS OBTAINED. #39533200J | Dec 18, 2024 DEFAULT | $6,250 |
| Sep 23, 2024 | Construction CLASS - 2 AT THE TIME OF INSPECTION NO CONSTRUCTION ACTIVITIES, I OBSERVED CONSTRUCTION PROJECT INFORMATION SIGN NOT PROVIDED ON THE SIDEWALK SHED UPPER PARAPET PANEL AT EXPOSURE #1 AS REQUIRED CODEPROVIDE CONSTRUCTION P #39532641K | Nov 27, 2024 DEFAULT | $6,250 |
| Sep 23, 2024 | Unknown CLASS - 2 AT THE TIME OF INSPECTION I OBSERVED, SIDEWALK SHED FOR PEDESTRIAN PROTECTION PERMIT HAVE EXPIRED ON 05/14/2022 WITH NO RENEWAL UPON REVIEWING THE DEPARTMENT RECORDS RENEW PERMIT AS REQUIRED #39532640Z | Nov 27, 2024 DEFAULT | $6,250 |
| Jun 13, 2024 | Unknown CLASS - 1 AT THE TIME OF INSPECTION NO CONSTRUCTION ACTIVITIES, I OBSERVED LIGHTS INSTALLED UNDER SIDEWALK SHED AT 558 HALSEY STREET WITHOUT ANY ELECTRICAL PERMIT UPON REVIEWING THE DEPARTMENT SYSTEM.OBTAIN ELECTRICAL PE #39529605X | Oct 2, 2024 IN VIOLATION | $1,600 |
| Jun 13, 2024 | Construction CLASS - 2 AT THE TIME OF INSPECTION NO CONSTRUCTION ACTIVITIES, I OBSERVE OCCUPIED BUILDING WITH SIDEWALK SHED INSTALLED AT EXPOSURE#1 AT ADDRESS 558 HALSEY STREET MISSING PROJECT INFORMATION ON THE UPPER PARAPET PANEL #39529604Y | Aug 21, 2024 DEFAULT | $6,250 |
| Jun 4, 2024 | Unknown CLASS - 2 AT TIME OF INSPECTION 4-STORY MIXED RESIDENTIAL & COMMERCIAL OCCUPIED BUILDING, OBSERVED SIDEWALK SHED AT EXPOSURE #4 WITH PERMIT B00518250-I1-SH EXPIRED 05/14/2022. IT CREATES MAJOR HAZARD FOR PUBLIC AND PROPE #39529249Z | Mar 10, 2025 IN VIOLATION | $1,250 |
| Aug 5, 2023 | Construction CLASS - 2 OBSERVED SIDEWALK SHED AT EXP#1. UPON REVIEW OF DEPARTMENT RECORDS, IT WAS OBSERVED THAT SIDEWALK SHED PERMIT #B00518250-I1 HAS EXPIRED ON 05/14/2022 AND HAS NOT BEEN RENEWED. SIDEWALK SHED PERMIT. #39520216L | Oct 11, 2023 DEFAULT | $6,250 |
| May 22, 2023 | Construction CLASS - 2 TIME OF INSPECTION OBSERVED AN ERECTED SIDEWALK SHED AT THE BUILDINGS EXPOSURE 1, NO VALID PERMIT. SIDEWALK SHED IN GOOD CONDITION. HORIZONTAL CROSS MEMBERS NOT AT PROPER HEIGHT 8 FEET AS PER CODE 3307.6.4.7. P #39516906R | Oct 2, 2023 IN VIOLATION | $2,400 |
| May 1, 2023 | Construction CLASS - 2 AT THE TIME OF INSPECTION OBSERVED SIDEWALK SHED IN PLACE FOR PEDESTRIAN PROTECTION, PERMIT HAS EXPIRED ON 5/14/22 UPON REVIEW OF THE DEPARTMENT RECORDS.RENEW PERMIT AS REQUIRED. #39515977J | Oct 2, 2023 IN VIOLATION | $1,250 |
| Nov 15, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES.AT TIME OF INSPECTION AND OBSERVED AT HALSEY ST SIDE AT 4TH FLOOR FACADE NEXT TO WINDOWS BRICK WORK IS BULGING(EXP#1)AT EXP #2 STUCCO MISSING OR SPALLING EXPO #35635895R | Aug 3, 2022 IN VIOLATION | $1,250 |
| Oct 7, 2021 | Construction CLASS - 2 EXPIRED PERMIT SIDEWALK SHED. NOTE: AT THE TIME OF MY INSPECTION OF A 4 STY BLDG,I OBSERVED SIDEWALK SHED IN PLACE. DID A SEARCH IN BIS WHICH ALERTED ME THAT SIDEWALK SHED PERMIT HAS BEING EXP FROM 9-9-2021. #35506463M | Aug 1, 2022 IN VIOLATION | $1,250 |
| Oct 7, 2021 | Construction CLASS - 2 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATION. NOTE: AT THE TIME OF MY INSPECTION OF A 4 STY BLDG. I OBSERVED SIDEWALK SHED IN PLACE W/THE FOLLOWING OBJECTION INOPERABLE LIGHT BULBS THIS CREATES A HAZARDOUS #35506462K | Aug 1, 2022 IN VIOLATION | $2,400 |
| Sep 23, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES AT THE TIME OF INSPECTION AND OBSERVED AT EXP#1 ON RIGHT SIDE NEXT TO 4TH FLOORS WINDOWBRICKWORK IS BULGING AND AT EXP 4 STUCCO IS MISSING EXPOSUED BRICKS,PA #35631726H | Aug 8, 2022 IN VIOLATION | $6,250 |
| Aug 13, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: OBSERVED AT EXP#1,4TH FL RIGHT SIDE OF WINDOW OVER THE FRONT ENTRY DOOR,BRICKWALL BULGING OUTSIDE. AT EXP#1&2. PAINT SPALLING,BRICKS DEFACED,DETERIORATED #35582283J | May 6, 2022 IN VIOLATION | $6,250 |
| Jun 18, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. AT THE TIME OF INSPECTION & OBSERVED AT EXP#1,4TH FL LEVEL EXTERIOR BRICK WORK IS BULGING OUTWARD,AT EXP#2 MISSING STUCCO SURFACE EXPOSURE BRICKS/MISSING MASONRY #35577494N | Dec 21, 2021 IN VIOLATION | $6,250 |
| Mar 10, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES.NOTE:@TIME OF INSP,OBSERVED@EXP1&4@THIS LOCATION,FRONT WALL IN COMPLETE DISREPAIR&BULGING OUT@4FL LEVEL.MAINTAIN EXTERIOR BLDG WALL/MAKE WALL SAFE IMMEDIATELY. #35554656P | Dec 21, 2021 IN VIOLATION | $2,500 |
| May 16, 2017 | Construction CLASS - 1 WEIL MCLAIN BOILER REMOVED AND CROWN BOILER 37,000 BTU'S INSTALLED W/O BOILER PERMIT. #32088600L | Feb 12, 2018 WRITTEN OFF | $0 |
| May 16, 2017 | Boilers CLASS - 1 B154,50A,50B,51. FULTON V.T. BOILER; 10HP,NB43028. HP STEAM; 50A-SEVERE THERMAL WEAR CORROSION AND PARTIAL COLLAPSE OF FLUE RUN TO THE CHIMNEY BASE. REPLACE ENTIRE FLUE PIPE ASSEMBLY AND REMOVE DRAFT INDUCER. #32088120M | Jul 3, 2017 IN VIOLATION | $0 |
| May 16, 2017 | Boilers CLASS - 1 4A,5A,24B,50,51,19B,36,50A. 50-STORAGE AND DEBRIS IN BOILER ROOM; 50A-FLUE NOT INCREASED FOR BOILER AND TWO HWHS. CROWN BOILER 37,000 BTUS #32088602P | Feb 12, 2018 WRITTEN OFF | $0 |
| May 16, 2017 | Boilers CLASS - 1 4A,5A,15,19B,24B,34B,36,38,50,51. 50-CHIMNEY BASE CLEANOUT DOOR BRICKED UP. CROWN 37,000 BTUS. #32088601N | Feb 12, 2018 WRITTEN OFF | $0 |
| May 16, 2017 | Boilers CLASS - 1 4A,5A,19B,24B,50,50A,50B,51,36. 50-BOILER ROOM LIGHTS DEFECTIVE; 50A-HWH SAFETY DISCHARGE PIPE MISSING; 50B-FLUE NOT INCREASED FOR BOILER AND HWH. #32088603R | Feb 12, 2018 WRITTEN OFF | $0 |
| Jan 22, 2010 | Boilers CLASS - 2 18B.32A.38.48. #32067744H | Mar 15, 2010 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00342 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01155 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #09931 | DOB VIOLATION - ACTIVE |
| Mar 5, 2025 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00163 | DOB VIOLATION - ACTIVE |
| Dec 3, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED THE EXTERIOR OF THE BUILDING IN STATE OF DISREPAIR. NOTED THE MASONRY BRICK SEPARATION OF THE JOINT BETWEEN THE REAR AND SIDE WALL, STUCCO CRACKED/DETERIORATING NEAR FIRE ESCAPE/ROOF LANDING. CREATING UNSAFE HAZ #24-03117 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION #01231 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #08873 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION #00359 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION #02692 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #29428 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #09173 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #03825 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #02237 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #07837 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #29981 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #02753 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION #01732 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #15227 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #15226 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #15225 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00588 | DOB VIOLATION - ACTIVE |
| Dec 22, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00502 | DOB VIOLATION - ACTIVE |
| Nov 10, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00322 | DOB VIOLATION - ACTIVE |
| Sep 15, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00277 | DOB VIOLATION - ACTIVE |
| Jun 9, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00308 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION #00676 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #09696 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #12030 | DOB VIOLATION - ACTIVE |
| Aug 9, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00333 | DOB VIOLATION - ACTIVE |
| Aug 9, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00334 | DOB VIOLATION - ACTIVE |
| Aug 9, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00331 | DOB VIOLATION - ACTIVE |
| Aug 9, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00335 | DOB VIOLATION - ACTIVE |
| Aug 9, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00332 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #09689 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #08653 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION #00629 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #13227 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #11518 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #07480 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #10088 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #11969 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #16511 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #16584 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #16854 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #16420 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #17607 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #18834 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #15958 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #17192 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #16700 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #221893 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #21242 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #33136 | DOB VIOLATION - ACTIVE |
| Jul 25, 1994 | LOCAL LAW 62/91 - BOILERS #04137 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Mar 5, 2025 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Dec 22, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 10, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 15, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 9, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Aug 9, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 9, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 9, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 9, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 9, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jul 25, 1994 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 10:37 PM ET. BBL 3016650044.