Brooklyn · Block 1665 · Lot 44 · 11233

320 Stuyvesant Avenue

4 floors · 3 apartments · 5,380 sq ft · built 1889 · class S9 · owner of record: First Stuyvestant Holding Corp.

137open violations
$74,325ECB/OATH penalties owed
0HPD class C (immediately hazardous)
56dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 56 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 56 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2020-07-08 (Accepted). Agency page

Dec 31, 2026
in 56 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 72 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 300 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 787 days
Next cycle year 2028

Open violations

ECB / OATH (29) · $74,325 owed
IssuedViolationHearingBalance
Jun 7, 2026Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP# 1. MISSING PARAPET PANEL. OBSERVED PARAPET PANEL LAY ON THE SIDEWALK WITH PROTRUDING NAILS. DETERIORATED MUDSILL ALSO FIRE ESCAPE LADDER OBSTRUCTED
#39555121Z
Nov 19, 2026
PENDING
$2,400
Jul 1, 2025Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED INSTALLED AT EXPO# 1 MISSING PROJECT INFORMATION PANEL CONTRARY TO BC 3301.9.2. CREATING AN UNSAFE CONDITION FOR PUBLIC AND OCCUPIED ADJOINING PROPERTIES, SAFETY MO
#39541852P
Sep 10, 2025
IN VIOLATION
$1,250
Jun 17, 2025Unknown CLASS - 2
AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED IN PLACE EXPO# 1 WITH PERMIT# B00518250-I1-SH UPON REVIEW DEPARTMENT RECORD IT APPEAR SIDEWALK SHED HAVE EXPIRED ON 05/14/2022, CREATING AN UNSAFE CONDITION FOR PUB
#39541496H
Aug 27, 2025
IN VIOLATION
$625
Mar 16, 2025Construction CLASS - 2
AT THE TIME OF INSPECTION, I OBSERVED SIDEWALK SHED INSTALLED AT EXPOSURE 1 NOT MAINTAINED IN A SAFE CONDITION, SHED PANEL BULGING, DETERIORATING INCLUDING VERTICAL MEMBER NO PLUMB CONTRARY TO BC 3307.6.5.1 - S
#39538033Y
Dec 11, 2025
IN VIOLATION
$2,400
Mar 16, 2025Construction CLASS - 2
AT THE TIME OF INSPECTION, I OBSERVED SIDEWALK SHED INSTALLED AT EXPOSURE 1 WITH NO INFORMATION PANEL POSTED ON THE PARAPET OF THE SHED AS PER BC 3301.9.2.2 SIDEWALK SHED PARAPET INFORMATION PANELS SHALL BE POS
#39538028J
Dec 11, 2025
IN VIOLATION
$1,250
Mar 16, 2025Unknown CLASS - 2
AT THE TIME OF INSPECTION, I OBSERVED SIDEWALK SHED INSTALLED AT EXPOSURE 1, UPON REVIEW OF DOB RECORDS SHED PERMIT EXPIRED 05/14/2022
#39538029L
Dec 11, 2025
IN VIOLATION
$1,250
Dec 3, 2024Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED THE EXTERIOR OF THE BUILDING IN STATE OF DISREPAIR. NOTED THE MASONRY BRICK SEPARATION OF THE JOINT BETWEEN THE REAR AND
#39131778Y
Dec 15, 2025
IN VIOLATION
$1,250
Oct 8, 2024Unknown CLASS - 2
AT THE TIME OF MY INSPECTION OF A SIDE WALK SHED PROVIDED TO PROTECT PEDESTRIANS , I OBSERVED THE PERMIT ISSUED ON 05-14-2021 WAS EXPIRED ON 05-14-2022. UPON REVIEW OF DOB RECORDS NO OTHER PERMIT WAS OBTAINED.
#39533200J
Dec 18, 2024
DEFAULT
$6,250
Sep 23, 2024Construction CLASS - 2
AT THE TIME OF INSPECTION NO CONSTRUCTION ACTIVITIES, I OBSERVED CONSTRUCTION PROJECT INFORMATION SIGN NOT PROVIDED ON THE SIDEWALK SHED UPPER PARAPET PANEL AT EXPOSURE #1 AS REQUIRED CODEPROVIDE CONSTRUCTION P
#39532641K
Nov 27, 2024
DEFAULT
$6,250
Sep 23, 2024Unknown CLASS - 2
AT THE TIME OF INSPECTION I OBSERVED, SIDEWALK SHED FOR PEDESTRIAN PROTECTION PERMIT HAVE EXPIRED ON 05/14/2022 WITH NO RENEWAL UPON REVIEWING THE DEPARTMENT RECORDS RENEW PERMIT AS REQUIRED
#39532640Z
Nov 27, 2024
DEFAULT
$6,250
Jun 13, 2024Unknown CLASS - 1
AT THE TIME OF INSPECTION NO CONSTRUCTION ACTIVITIES, I OBSERVED LIGHTS INSTALLED UNDER SIDEWALK SHED AT 558 HALSEY STREET WITHOUT ANY ELECTRICAL PERMIT UPON REVIEWING THE DEPARTMENT SYSTEM.OBTAIN ELECTRICAL PE
#39529605X
Oct 2, 2024
IN VIOLATION
$1,600
Jun 13, 2024Construction CLASS - 2
AT THE TIME OF INSPECTION NO CONSTRUCTION ACTIVITIES, I OBSERVE OCCUPIED BUILDING WITH SIDEWALK SHED INSTALLED AT EXPOSURE#1 AT ADDRESS 558 HALSEY STREET MISSING PROJECT INFORMATION ON THE UPPER PARAPET PANEL
#39529604Y
Aug 21, 2024
DEFAULT
$6,250
Jun 4, 2024Unknown CLASS - 2
AT TIME OF INSPECTION 4-STORY MIXED RESIDENTIAL & COMMERCIAL OCCUPIED BUILDING, OBSERVED SIDEWALK SHED AT EXPOSURE #4 WITH PERMIT B00518250-I1-SH EXPIRED 05/14/2022. IT CREATES MAJOR HAZARD FOR PUBLIC AND PROPE
#39529249Z
Mar 10, 2025
IN VIOLATION
$1,250
Aug 5, 2023Construction CLASS - 2
OBSERVED SIDEWALK SHED AT EXP#1. UPON REVIEW OF DEPARTMENT RECORDS, IT WAS OBSERVED THAT SIDEWALK SHED PERMIT #B00518250-I1 HAS EXPIRED ON 05/14/2022 AND HAS NOT BEEN RENEWED. SIDEWALK SHED PERMIT.
#39520216L
Oct 11, 2023
DEFAULT
$6,250
May 22, 2023Construction CLASS - 2
TIME OF INSPECTION OBSERVED AN ERECTED SIDEWALK SHED AT THE BUILDINGS EXPOSURE 1, NO VALID PERMIT. SIDEWALK SHED IN GOOD CONDITION. HORIZONTAL CROSS MEMBERS NOT AT PROPER HEIGHT 8 FEET AS PER CODE 3307.6.4.7. P
#39516906R
Oct 2, 2023
IN VIOLATION
$2,400
May 1, 2023Construction CLASS - 2
AT THE TIME OF INSPECTION OBSERVED SIDEWALK SHED IN PLACE FOR PEDESTRIAN PROTECTION, PERMIT HAS EXPIRED ON 5/14/22 UPON REVIEW OF THE DEPARTMENT RECORDS.RENEW PERMIT AS REQUIRED.
#39515977J
Oct 2, 2023
IN VIOLATION
$1,250
Nov 15, 2021Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES.AT TIME OF INSPECTION AND OBSERVED AT HALSEY ST SIDE AT 4TH FLOOR FACADE NEXT TO WINDOWS BRICK WORK IS BULGING(EXP#1)AT EXP #2 STUCCO MISSING OR SPALLING EXPO
#35635895R
Aug 3, 2022
IN VIOLATION
$1,250
Oct 7, 2021Construction CLASS - 2
EXPIRED PERMIT SIDEWALK SHED. NOTE: AT THE TIME OF MY INSPECTION OF A 4 STY BLDG,I OBSERVED SIDEWALK SHED IN PLACE. DID A SEARCH IN BIS WHICH ALERTED ME THAT SIDEWALK SHED PERMIT HAS BEING EXP FROM 9-9-2021.
#35506463M
Aug 1, 2022
IN VIOLATION
$1,250
Oct 7, 2021Construction CLASS - 2
SIDEWALK SHED DOES NOT MEET CODE SPECIFICATION. NOTE: AT THE TIME OF MY INSPECTION OF A 4 STY BLDG. I OBSERVED SIDEWALK SHED IN PLACE W/THE FOLLOWING OBJECTION INOPERABLE LIGHT BULBS THIS CREATES A HAZARDOUS
#35506462K
Aug 1, 2022
IN VIOLATION
$2,400
Sep 23, 2021Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES AT THE TIME OF INSPECTION AND OBSERVED AT EXP#1 ON RIGHT SIDE NEXT TO 4TH FLOORS WINDOWBRICKWORK IS BULGING AND AT EXP 4 STUCCO IS MISSING EXPOSUED BRICKS,PA
#35631726H
Aug 8, 2022
IN VIOLATION
$6,250
Aug 13, 2021Construction CLASS - 1
FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: OBSERVED AT EXP#1,4TH FL RIGHT SIDE OF WINDOW OVER THE FRONT ENTRY DOOR,BRICKWALL BULGING OUTSIDE. AT EXP#1&2. PAINT SPALLING,BRICKS DEFACED,DETERIORATED
#35582283J
May 6, 2022
IN VIOLATION
$6,250
Jun 18, 2021Construction CLASS - 1
FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. AT THE TIME OF INSPECTION & OBSERVED AT EXP#1,4TH FL LEVEL EXTERIOR BRICK WORK IS BULGING OUTWARD,AT EXP#2 MISSING STUCCO SURFACE EXPOSURE BRICKS/MISSING MASONRY
#35577494N
Dec 21, 2021
IN VIOLATION
$6,250
Mar 10, 2021Construction CLASS - 1
FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES.NOTE:@TIME OF INSP,OBSERVED@EXP1&4@THIS LOCATION,FRONT WALL IN COMPLETE DISREPAIR&BULGING OUT@4FL LEVEL.MAINTAIN EXTERIOR BLDG WALL/MAKE WALL SAFE IMMEDIATELY.
#35554656P
Dec 21, 2021
IN VIOLATION
$2,500
May 16, 2017Construction CLASS - 1
WEIL MCLAIN BOILER REMOVED AND CROWN BOILER 37,000 BTU'S INSTALLED W/O BOILER PERMIT.
#32088600L
Feb 12, 2018
WRITTEN OFF
$0
May 16, 2017Boilers CLASS - 1
B154,50A,50B,51. FULTON V.T. BOILER; 10HP,NB43028. HP STEAM; 50A-SEVERE THERMAL WEAR CORROSION AND PARTIAL COLLAPSE OF FLUE RUN TO THE CHIMNEY BASE. REPLACE ENTIRE FLUE PIPE ASSEMBLY AND REMOVE DRAFT INDUCER.
#32088120M
Jul 3, 2017
IN VIOLATION
$0
May 16, 2017Boilers CLASS - 1
4A,5A,24B,50,51,19B,36,50A. 50-STORAGE AND DEBRIS IN BOILER ROOM; 50A-FLUE NOT INCREASED FOR BOILER AND TWO HWHS. CROWN BOILER 37,000 BTUS
#32088602P
Feb 12, 2018
WRITTEN OFF
$0
May 16, 2017Boilers CLASS - 1
4A,5A,15,19B,24B,34B,36,38,50,51. 50-CHIMNEY BASE CLEANOUT DOOR BRICKED UP. CROWN 37,000 BTUS.
#32088601N
Feb 12, 2018
WRITTEN OFF
$0
May 16, 2017Boilers CLASS - 1
4A,5A,19B,24B,50,50A,50B,51,36. 50-BOILER ROOM LIGHTS DEFECTIVE; 50A-HWH SAFETY DISCHARGE PIPE MISSING; 50B-FLUE NOT INCREASED FOR BOILER AND HWH.
#32088603R
Feb 12, 2018
WRITTEN OFF
$0
Jan 22, 2010Boilers CLASS - 2
18B.32A.38.48.
#32067744H
Mar 15, 2010
IN VIOLATION
$0
DOB (54)
IssuedViolationStatus
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
#00342
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
#01155
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#09931
DOB VIOLATION - ACTIVE
Mar 5, 2025FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00163
DOB VIOLATION - ACTIVE
Dec 3, 2024CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED THE EXTERIOR OF THE BUILDING IN STATE OF DISREPAIR. NOTED THE MASONRY BRICK SEPARATION OF THE JOINT BETWEEN THE REAR AND SIDE WALL, STUCCO CRACKED/DETERIORATING NEAR FIRE ESCAPE/ROOF LANDING. CREATING UNSAFE HAZ
#24-03117
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
#01231
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#08873
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
#00359
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
#02692
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#29428
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#09173
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
#03825
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
#02237
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#07837
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#29981
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
#02753
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
#01732
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#15227
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#15226
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#15225
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
#00588
DOB VIOLATION - ACTIVE
Dec 22, 2021FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00502
DOB VIOLATION - ACTIVE
Nov 10, 2021FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00322
DOB VIOLATION - ACTIVE
Sep 15, 2021FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00277
DOB VIOLATION - ACTIVE
Jun 9, 2021FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00308
DOB VIOLATION - ACTIVE
Mar 16, 2020HIGH PRESSURE BOILER
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
#00676
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#09696
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#12030
DOB VIOLATION - ACTIVE
Aug 9, 2017FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00333
DOB VIOLATION - ACTIVE
Aug 9, 2017FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00334
DOB VIOLATION - ACTIVE
Aug 9, 2017FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00331
DOB VIOLATION - ACTIVE
Aug 9, 2017FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00335
DOB VIOLATION - ACTIVE
Aug 9, 2017FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00332
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#09689
DOB VIOLATION - ACTIVE
Oct 1, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
#08653
DOB VIOLATION - ACTIVE
Mar 3, 2015HIGH PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
#00629
DOB VIOLATION - ACTIVE
Mar 3, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
#13227
DOB VIOLATION - ACTIVE
May 15, 2014LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
#11518
DOB VIOLATION - ACTIVE
Mar 1, 2013LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
#07480
DOB VIOLATION - ACTIVE
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#10088
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#11969
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#16511
DOB VIOLATION - ACTIVE
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#16584
DOB VIOLATION - ACTIVE
Jan 19, 2007LOCAL LAW 62/91 - BOILERS

#16854
DOB VIOLATION - ACTIVE
Jan 6, 2006LOCAL LAW 62/91 - BOILERS

#16420
DOB VIOLATION - ACTIVE
Jan 31, 2005LOCAL LAW 62/91 - BOILERS

#17607
DOB VIOLATION - ACTIVE
Feb 13, 2004LOCAL LAW 62/91 - BOILERS

#18834
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#15958
DOB VIOLATION - ACTIVE
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#17192
DOB VIOLATION - ACTIVE
Feb 7, 2000LOCAL LAW 62/91 - BOILERS

#16700
DOB VIOLATION - ACTIVE
Sep 16, 1997LOCAL LAW 62/91 - BOILERS

#221893
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#21242
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#33136
DOB VIOLATION - ACTIVE
Jul 25, 1994LOCAL LAW 62/91 - BOILERS

#04137
DOB VIOLATION - ACTIVE
DOB NOW Safety (54)
IssuedViolationStatus
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Active
Mar 5, 2025AEUHAZ FTC-AEU-HAZ
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Dec 22, 2021AEUHAZ FTC-AEU-HAZ
Active
Nov 10, 2021AEUHAZ FTC-AEU-HAZ
Active
Sep 15, 2021AEUHAZ FTC-AEU-HAZ
Active
Jun 9, 2021AEUHAZ FTC-AEU-HAZ
Active
Mar 16, 2020Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Aug 9, 2017AEUHAZ FTC-AEU-HAZ
Active
Aug 9, 2017AEUHAZ FTC-AEU-HAZ
Active
Aug 9, 2017AEUHAZ FTC-AEU-HAZ
Active
Aug 9, 2017AEUHAZ FTC-AEU-HAZ
Active
Aug 9, 2017AEUHAZ FTC-AEU-HAZ
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Oct 1, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Active
Mar 3, 2015Boiler HBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
Active
Mar 3, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Active
May 15, 2014Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Active
Mar 1, 2013Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Dec 31, 2009Boiler LBLVIO
Active
Jan 1, 2009Boiler LL6291
Active
Jan 3, 2008Boiler LL6291
Active
Jan 19, 2007Boiler LL6291
Active
Jan 6, 2006Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
Feb 13, 2004Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Sep 16, 1997Boiler LL6291
Active
Feb 10, 1997Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
Jul 25, 1994Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 5, 2026, 10:37 PM ET. BBL 3016650044.

Look up another building