4 floors · 10,018 sq ft · built 1892 · class M9 · owner of record: Futa Islamic Center Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-08-12 (Accepted). Agency page | Dec 31, 2026 in 47 days | 2 of 2 without an accepted 2026 report yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 29, 2026 | Unknown CLASS - 2 OBSERVED 2 NEW EXTERIOR LIGHTS AND WIRING INSTALLED ABOVE MAIN ENTRANCE DOOR AT EXPOSURE 1 WITHOUT ELECTRICAL PERMITS., OBTAIN PERMIT #39210010M | Jan 7, 2027 PENDING | $1,250 |
| Jul 28, 2018 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO# 35323009K ISSUED ON 6/12/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REM: COMPLY W/ COMMISSIONER'S ORDER &/OR FILE A C OF C #35340353Y | Sep 13, 2018 DEFAULT | $3,125 |
| Jun 12, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. ON THE FACADE @ EXP#1 THERE ARE MULTIPLE VERTICAL CRACKS, THERE IS ALSO A LARGE PIECE OF THE WALL BREAKING @ THE BASE OF THE FRONT ENTRANCE. REM: REPAIR &/OR R #35323009K | Nov 15, 2018 IN VIOLATION | $0 |
| Apr 18, 2005 | Construction Hazardous SIDEWALK SHED DOES NOT MEET BUILDING CODE SPECIFICATIONS. AREA OVER ENTRANCE DOOR TO CHURCH NOT SOLIDLY PLANKED TIGHT TO BUILDING AND NO WATER PROOFING AT ENTRANCE LIGHTING UNDER SHED NOT ADEQUATELY MAINTAIN #34452071X | Feb 16, 2006 WRITTEN OFF | $0 |
| Dec 19, 2003 | Construction Hazardous FAILURE TO MAINTAIN BLDG DEFECTS NOTED EAST AND WEST SIDE ROOF CHIMNEYS ARE CRACKED MISSING MORTAR AND LEANING REMEDY MAINTAIN BLDG MAKE ALL NECESSARY REPAIRS TO CHIMNEYS IMMEDIATELY #34408072J | Feb 23, 2006 WRITTEN OFF | $0 |
| Jun 7, 2003 | Construction Non-Hazardous FAILURE TO MAINTAIN BLDG (EXTERIOR) NOTD:PREMISES D.B.A "GREATER BETHEL AME CHURCH HAS 2 CHIMMIES WITH MISSING MORTOR BULDGING BRICK ADN IS LEANING.THE DEFECTIVE CHIMMIES ARE LOCATED AT WEST AND EAST LOCATIONS #34381991N | Jul 24, 2003 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 10, 2026 | LANDMARK #27-0107 | DOB VIOLATION - ACTIVE |
| Sep 10, 2026 | LANDMARK #27-0106 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #03814 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #03769 | DOB VIOLATION - ACTIVE |
| Sep 5, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00104 | DOB VIOLATION - ACTIVE |
| Jul 22, 2003 | IMMEDIATE EMERGENCY #137/03 | DOB VIOLATION - ACTIVE |
| Jul 22, 2003 | IMMEDIATE EMERGENCY #137/03 | DOB VIOLATION - ACTIVE |
| Jul 22, 2003 | IMMEDIATE EMERGENCY #137/03 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 5, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 17, 2025 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Apr 29, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 2, 2026 |
| Apr 5, 2024 | C | Apt 4A · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APAR | May 1, 2024 |
| Sep 28, 2021 | B | Apt 4B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN WINDOW FRAME AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 2, 2021 |
| Sep 28, 2021 | B | Apt 4B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN WINDOW FRAME AT EAST WALL IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 2, 2021 |
| Sep 28, 2021 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND STUCCO, ALL WALLS OF FACADE, CLOSED COURT AT WEST SIDE OF BUILDING , 4th STORY | Nov 2, 2021 |
| Sep 28, 2021 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF OVERGROWN AND EXCESSIVE AMOUNT OF WEEDS/ SHRUBS GROWING ALONG FACADE AT SOUTH WALL OF BUILDING , 4th STORY | Nov 2, 2021 |
| Oct 22, 2020 | B | Apt 4B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE DETERIORATED WOOD SILL AT 2 WINDOWS, NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 26, 2020 |
| Oct 22, 2020 | B | Apt 4B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TRIM, AT THE EXTERIOR OF 2ND WINDOW FROM WEST ...NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 26, 2020 |
| Apr 26, 2019 | B | Apt 4A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH AND WEST WALL INSIDE THE CLOSET IN THE 1st ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | May 31, 2019 |
| Apr 26, 2019 | B | Apt 4A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH AND WEST WALL INSIDE THE CLOSET APPROX.10.SQ.FT. IN THE 1st ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | May 31, 2019 |
| Mar 11, 2019 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL BALCONIES, ALL PARTS AND ALL COMPONENTS OF FIRE ESCAPE AT FRONT OF THE BUILDING | Jun 14, 2019 |
| Nov 21, 2018 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM AT CELLAR | Nov 29, 2018 |
| Nov 21, 2018 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM .. AT PUBLIC HALL, 1st STORY | Nov 29, 2018 |
| Oct 29, 2018 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT BASEMENT | Nov 6, 2018 |
| Oct 29, 2018 | C | Apt 4A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 25, 2018 |
| Oct 25, 2018 | C | Apt 4A · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 25, 2018 |
| Aug 22, 2018 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING. AT PUBLIC HALL, 4th STORY | Sep 26, 2018 |
| Aug 22, 2018 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Nov 25, 2018 |
| Aug 22, 2018 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING. AT PUBLIC HALL, 4th STORY | Sep 26, 2018 |
| Aug 22, 2018 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSE HIOLD ITEMS. AT PUBLIC HALL, 4th STORY | Sep 26, 2018 |
| Jun 18, 2018 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL PARTS AND ALL STACKS AT BUILDING FRONT AT FIRE ESCAPE | Sep 21, 2018 |
| Jan 23, 2018 | B | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN ... AT BASEMENT | Feb 27, 2018 |
| Jan 23, 2018 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SEWAGE ACCUMULATION AT BASEMENT | Jan 31, 2018 |
| Jan 23, 2018 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE ... AT BASEMENT | Feb 27, 2018 |
| Oct 4, 2017 | C | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BUILDING ENTRANCE DOOR LOCK AT FRONT AREAWAY, 1st STORY | Oct 12, 2017 |
| May 25, 2017 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AND VINYL COMPOSITE TILES AT PUBLIC HALL, 4th STORY | Jun 29, 2017 |
| May 25, 2017 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SELF LATCHING LOCK INSTALLED ON ROOF DOOR AT PUBLIC HALL | Jun 2, 2017 |
| May 25, 2017 | B | § 27-2005 ADM CODE PROVIDE METAL SCREEN ABOVE AND BELOW SKYLIGHT AT ROOF BULKHEAD AT PUBLIC HALL | Jun 29, 2017 |
| May 25, 2017 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MORTAR JOINTS AT EAST AND WEST AIR SHAFTS | Jun 29, 2017 |
| May 18, 2017 | A | Apt 2B · § 27-2005 ADM CODE REFIT ENTRANCE DOOR TO APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 21, 2017 |
| Apr 10, 2017 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE FLOOR AT BASEMENT FRONT OF BUILDING AT BASEMENT | May 15, 2017 |
| Apr 7, 2017 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WIRE MESH BELOW SKYLIGHT ROOF AT BULKHEAD | May 12, 2017 |
| Apr 5, 2017 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT PUBLIC HALL, 4th STORY | May 10, 2017 |
| Feb 6, 2017 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORYS ALL STACKS AT THE FRONT FIRE ESCAPE | May 12, 2017 |
| Jan 19, 2017 | B | Apt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 23, 2017 |
| Dec 24, 2001 | B | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING WEST AND SOUTH WALL, IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 2, 2002 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | ECB | Unknown: OBSERVED 2 NEW EXTERIOR LIGHTS AND WIRING INSTALLED ABOVE MAIN ENTRANCE DOOR AT EXPOSURE 1 WITHOUT ELECTRICAL PERMITS., OBTAIN PERMIT | Open |
| Sep 10, 2026 | DOB | LANDMARK: | Open |
| Sep 10, 2026 | DOB | LANDMARK: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 3:17 PM ET. BBL 1017210132.