1 floors · 239,168 sq ft · built 1937 · class T9 · owner of record: Nys Department Of Transportation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 239,168 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1790). Agency page | Dec 31, 2030 in 1531 days | Next due 2030 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 8, 2026 | Unknown CLASS - 1 BC3308.5 OBSERVED NEW 5 STORY BUILDING AT TIME OF INSPECTION NOTED NETTING THROUGHT BUILDING INADEQUATE RIPPED OR DAMAGED IN DIFERENTS LOCATIONS AND LEVELS .AS PER ACCTION OF TIME AND SEVERE WEATHER , CONTRARY #39560375P | Dec 15, 2026 PENDING | $5,000 |
| Sep 1, 2026 | Construction CLASS - 2 GC FAIL TO FILE CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39556334R ISSUED 07/08/2026. #39558620R | Nov 10, 2026 | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Oct 15, 2023 | STRUCTURALLY COMPROMISED BUILDING FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. #00036 | DOB VIOLATION - ACTIVE |
| Sep 5, 2023 | CONSTRUCTION PREMISES RENDERED NON COMPLIANT DUE TO FIRE. FIRE OCCURRED AT SECTION OF WAREHOUSE KNOWN AS " QUEENS TRUCK SHOP " HAVING EXTENSIVE DAMGE WIT H OPEN ROOF #CER01DM | DOB VIOLATION - ACTIVE |
| Sep 5, 2023 | CONSTRUCTION EMERGENCY WORK ORDER.DUE TO 5ALARM FIRE ON 9/4/23,BLDG ROOF@VEH CPR SHOP (APPRX450FT W)WAS PARTIALLY BURND/COLLAPSD@APPRX75%,W/REMAINING STEEL PURLINS BUCKLD/FIRE DMGD ROOF@RISK OF FRTHR CLLPSE.OWNR TO IMMED RTAIN A GC TO ERECT A TIGHTBRD FENCE ALONG EXP1 OF THE DMGD VEHICLE RPAIR SHOP,AS REQ'D.FILE #FEU40701PN | DOB VIOLATION - ACTIVE |
| Sep 5, 2023 | CONSTRUCTION EMERGENCY WORK ORDER.DUE TO 5ALARM FIRE ON9/4/23,BLDG ROOF@VEHICLE RPR SHOP(APPRX 450FTW)WAS PARTIALLY BURND/CLLPSD@APPRX 75% W/REMAINING STEEL PURLINS BUCKLED/FIRE DMGD.ROOF@RISK OF FRTHR CLLPSE.OWNER TO IMMED RTAIN A NYS PE&GC ENDORSD FOR DEMO.1.PRTLLY DEMO THE BLDG AS REQ'D DOWN TO GRADE,2.STBILI #FEU40702PN | DOB VIOLATION - ACTIVE |
| Sep 5, 2023 | CONSTRUCTION FAIL TO MAINTAIN-MASONRY WALL HAD AN APPRX FULL HEIGHT VERTCRACK.THRU THE FULL WALL THICKNESS ~1/2" TO 1" WIDE.WALL HAD ~1" WIDEHORIZONTAL CRACK LOCATED ~1' ABOVE 1FL SLAB.OWNR RTAIN NYSPE-EVAL ENTIRE BLDG &FILE RPR DWGS W/DOB.BLDG TO BE RPRD UNDER PRMT STRT BY 10/30/23 &SIGN OFF BY 12/15/23 #FEU40703PN | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Oct 15, 2023 | Structurally Compromised Buildings FTF-SC-INITL | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | ECB | Unknown: BC3308.5 OBSERVED NEW 5 STORY BUILDING AT TIME OF INSPECTION NOTED NETTING THROUGHT BUILDING INADEQUATE RIPPED OR DAMAGED IN DIFERENTS LOCATIONS AND LEVELS .AS PER ACCTION OF TIME AND SEVERE WEATHER , CONTRARY | Open |
| Sep 1, 2026 | ECB | Construction: GC FAIL TO FILE CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39556334R ISSUED 07/08/2026. | Closed |
| Jul 8, 2026 | ECB | Unknown: RESPONDING TO INCIDENT WHERE IRONWORKER LOST FOOTING AND FELL RESULTING IN HIM TAKING HIMSELF TO URGENT CARE ON HIS OWN ACCORD. UPON REVIEW OF PRE SHIFT MEETING, CONTENT INADEQUATE TO THE SCOPE OF WORK WITH NO | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 12:31 AM ET. BBL 4017900001.