Queens · Block 1790 · Lot 1 · 11368

32-11 Harper Street

1 floors · 239,168 sq ft · built 1937 · class T9 · owner of record: Nys Department Of Transportation

9open violations
$6,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
191dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 239,168 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 191 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 191 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1166 days
Next cycle year 2029
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1790). Agency page

Dec 31, 2030
in 1531 days
Next due 2030

Open violations

ECB / OATH (2) · $6,250 owed
IssuedViolationHearingBalance
Oct 8, 2026Unknown CLASS - 1
BC3308.5 OBSERVED NEW 5 STORY BUILDING AT TIME OF INSPECTION NOTED NETTING THROUGHT BUILDING INADEQUATE RIPPED OR DAMAGED IN DIFERENTS LOCATIONS AND LEVELS .AS PER ACCTION OF TIME AND SEVERE WEATHER , CONTRARY
#39560375P
Dec 15, 2026
PENDING
$5,000
Sep 1, 2026Construction CLASS - 2
GC FAIL TO FILE CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39556334R ISSUED 07/08/2026.
#39558620R
Nov 10, 2026
$1,250
DOB (5)
IssuedViolationStatus
Oct 15, 2023STRUCTURALLY COMPROMISED BUILDING
FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.
#00036
DOB VIOLATION - ACTIVE
Sep 5, 2023CONSTRUCTION
PREMISES RENDERED NON COMPLIANT DUE TO FIRE. FIRE OCCURRED AT SECTION OF WAREHOUSE KNOWN AS " QUEENS TRUCK SHOP " HAVING EXTENSIVE DAMGE WIT H OPEN ROOF
#CER01DM
DOB VIOLATION - ACTIVE
Sep 5, 2023CONSTRUCTION
EMERGENCY WORK ORDER.DUE TO 5ALARM FIRE ON 9/4/23,BLDG ROOF@VEH CPR SHOP (APPRX450FT W)WAS PARTIALLY BURND/COLLAPSD@APPRX75%,W/REMAINING STEEL PURLINS BUCKLD/FIRE DMGD ROOF@RISK OF FRTHR CLLPSE.OWNR TO IMMED RTAIN A GC TO ERECT A TIGHTBRD FENCE ALONG EXP1 OF THE DMGD VEHICLE RPAIR SHOP,AS REQ'D.FILE
#FEU40701PN
DOB VIOLATION - ACTIVE
Sep 5, 2023CONSTRUCTION
EMERGENCY WORK ORDER.DUE TO 5ALARM FIRE ON9/4/23,BLDG ROOF@VEHICLE RPR SHOP(APPRX 450FTW)WAS PARTIALLY BURND/CLLPSD@APPRX 75% W/REMAINING STEEL PURLINS BUCKLED/FIRE DMGD.ROOF@RISK OF FRTHR CLLPSE.OWNER TO IMMED RTAIN A NYS PE&GC ENDORSD FOR DEMO.1.PRTLLY DEMO THE BLDG AS REQ'D DOWN TO GRADE,2.STBILI
#FEU40702PN
DOB VIOLATION - ACTIVE
Sep 5, 2023CONSTRUCTION
FAIL TO MAINTAIN-MASONRY WALL HAD AN APPRX FULL HEIGHT VERTCRACK.THRU THE FULL WALL THICKNESS ~1/2" TO 1" WIDE.WALL HAD ~1" WIDEHORIZONTAL CRACK LOCATED ~1' ABOVE 1FL SLAB.OWNR RTAIN NYSPE-EVAL ENTIRE BLDG &FILE RPR DWGS W/DOB.BLDG TO BE RPRD UNDER PRMT STRT BY 10/30/23 &SIGN OFF BY 12/15/23
#FEU40703PN
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 7)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 7)
Active
Oct 15, 2023Structurally Compromised Buildings FTF-SC-INITL
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 8, 2026ECBUnknown: BC3308.5 OBSERVED NEW 5 STORY BUILDING AT TIME OF INSPECTION NOTED NETTING THROUGHT BUILDING INADEQUATE RIPPED OR DAMAGED IN DIFERENTS LOCATIONS AND LEVELS .AS PER ACCTION OF TIME AND SEVERE WEATHER , CONTRARYOpen
Sep 1, 2026ECBConstruction: GC FAIL TO FILE CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39556334R ISSUED 07/08/2026.Closed
Jul 8, 2026ECBUnknown: RESPONDING TO INCIDENT WHERE IRONWORKER LOST FOOTING AND FELL RESULTING IN HIM TAKING HIMSELF TO URGENT CARE ON HIS OWN ACCORD. UPON REVIEW OF PRE SHIFT MEETING, CONTENT INADEQUATE TO THE SCOPE OF WORK WITH NOClosed