Queens · Block 4940 · Lot 7 · 11358

32-06 190 Street

2 floors · 3 apartments · 3,240 sq ft · built 1950 · class C0 · owner of record: Trimoglie, Mario

22open violations
$3,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2025-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 64 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 80 days
Annual
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 429 days
Next cycle year 2027

Open violations

ECB / OATH (2) · $3,750 owed
IssuedViolationHearingBalance
Sep 20, 2022Unknown CLASS - 2
RESIDENCE CONVERTED FROM 2 TO 3 FAMILY DWELLING. NOTED: AT BSMT - LEVEL SUB-DIVIDED RIGHT & LEFT: RIGHT CREATED & OCCUPIED AS A CLASS 'A' APT WITH 3 PC BTHRM; KITCHEN WITH GAS STOVE, RESIDENTIAL SINK; 1 BDRM. R
#39088050K
Jan 2, 2024
IN VIOLATION
$2,500
Sep 20, 2022Construction CLASS - 2
CONTRARY TO C-OF-O # Q103641 WHICH INDICATES BSMT AS BOILER, STORAGE, GARAGE: AT TIME OF INSPECTION - BSMT OBSERVED SUB-DIVIDED RIGHT & LEFT. LEFT CREATED & OCCUPIED AS SLEEPING QUARTERS WITH 3 PC BTHRM, BED, R
#39088051M
Jan 2, 2024
IN VIOLATION
$1,250
DOB (4)
IssuedViolationStatus
Sep 20, 2022CONSTRUCTION
W/O A PERMIT. NOTED: AT BSMT - LEVEL SUB-DIVIDED RIGHT & LEFT: LEFT OBSERVED FULL HEIGHT PARTITION WALLS ERECTED FOR A LAUNDRY, 3 PC BTHRM (TOILET, SINK, SHOWER), SLOP SINK, WASHER. ELECTRICAL WIRING INSTALLED: 220V LINE FOR DRYER; 110 V LINES FOR ADDL'T LIGHTS & OUTLETS. ASLO, GARAGE DOOR REMOVED &
#22-03671
DOB VIOLATION - ACTIVE
Sep 20, 2022CONSTRUCTION
CONTRARY TO C-OF-O # Q103641 WHICH INDICATES BSMT AS BOILER, STORAGE, GARAGE: AT TIME OF INSPECTION - BSMT OBSERVED SUB-DIVIDED RIGHT & LEFT. LEFT CREATED & OCCUPIED AS SLEEPING QUARTERS WITH 3 PC BTHRM, BED, REFRIGERATOR, WASHER & ELECTRIC DRYER.
#22-03672
DOB VIOLATION - ACTIVE
Sep 20, 2022CONSTRUCTION
W/O A PERMIT. NOTED: AT BSMT - FULL HEIGHT PARTITION WALLS ERECTED TO SUB-DIVIDE LEVEL RIGHT & LEFT. AT RIGHT: PARTITION WALLS ERECTED TO CREATE A BTHRM & BDRM. WATER & WASTE LINES INSTALLED FOR 3 PC BTHRM (TOILET, SINK, TUB); RESIDENTIAL SINK AT KITCHEN AREA. GAS LINE INSTALLED FOR STOVE. ELECTRICA
#22-03673
DOB VIOLATION - ACTIVE
Sep 20, 2022CONSTRUCTION
RESIDENCE CONVERTED FROM 2 TO 3 FAMILY DWELLING. NOTED: AT BSMT - LEVEL SUB-DIVIDED RIGHT & LEFT: RIGHT CREATED & OCCUPIED AS A CLASS 'A' APT WITH 3 PC BTHRM; KITCHEN WITH GAS STOVE, RESIDENTIAL SINK; 1 BDRM.
#22-03674
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
Active
HPD (15) · C 0 · B 7 · A 7
IssuedClassViolationCorrect by
Nov 25, 2025I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R—
Feb 21, 2023BApt 2 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORYMar 28, 2023
Feb 21, 2023BApt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORYMar 28, 2023
Feb 21, 2023BApt 2 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORYMar 28, 2023
Feb 21, 2023BApt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORYMar 28, 2023
Dec 12, 2022BApt 2 · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASH BASIN AT WASTELINE IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 16, 2023
Oct 27, 2022AApt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 30, 2023
Oct 27, 2022AApt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 30, 2023
Oct 27, 2022AApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL BUZZER FROM BUILDING ENTRANCE IN THE FOYER LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 30, 2023
Oct 17, 2022AApt 2FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 20, 2023
Oct 17, 2022AApt 2FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR NORTH AND EAST WALLS AT SKYLIGHT IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 20, 2023
Oct 17, 2022BApt 2FL · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE BUZZER IN THE ENTRANCE LOCATED AT APT 2FL , 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 21, 2022
Oct 17, 2022BApt 2FL · § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE PIPE AT SINK IN THE KITCHEN LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 21, 2022
Oct 17, 2022AApt 2FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 20, 2023
Oct 17, 2022AApt 2FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 20, 2023

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 8:24 AM ET. BBL 4049400007.

Look up another building