Bronx · Block 3350 · Lot 3 · 10467

3190 Hull Avenue

5 floors · 27 apartments · 21,250 sq ft · built 1918 · class C1 · owner of record: 335 E 205 Llc

37open violations
$0ECB/OATH penalties owed
7HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1161 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-06 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (4)
IssuedViolationStatus
Mar 3, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
#05382
DOB VIOLATION - ACTIVE
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#06784
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#19911
DOB VIOLATION - ACTIVE
May 17, 1993LOCAL LAW 62/91 - BOILERS

#05320
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Mar 3, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Active
Jan 3, 2008Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
May 17, 1993Boiler LL6291
Active
HPD (29) · C 7 · B 10 · A 12
IssuedClassViolationCorrect by
Aug 18, 2026BApt 23 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 23, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHSep 22, 2026
Jul 28, 2026C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Aug 1, 2026
Jul 28, 2026C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Aug 1, 2026
Nov 13, 2024BApt 52 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 52, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTDec 18, 2024
Nov 13, 2024BApt 53 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 53, 5th STORY, 1st APARTMENT FROM WEST AT NORTHDec 18, 2024
Nov 13, 2024BApt 4 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4, 1st STORY, 1st APARTMENT FROM NORTH AT EASTDec 18, 2024
Nov 13, 2024BApt 5 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTDec 18, 2024
Nov 13, 2024BApt 21 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 21, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 18, 2024
Nov 1, 2024C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Nov 5, 2024
Nov 1, 2024C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Nov 5, 2024
Jul 31, 2023CApt 43 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 43, 4th STORYAug 26, 2023
Jun 20, 2023B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... BULKHEAD NORTH AND WEST WALLS, 20 SQ.FT AT PUBLIC HALL, 5th STORY ORIGINAL VIOLATION 15729570 ISSUED 15-FEB-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).Jul 25, 2023
Feb 17, 2023C§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT THE BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORYFeb 23, 2023
Nov 2, 2022AApt 32 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 32, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTFeb 5, 2023
Nov 2, 2022AApt 54 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 5, 2023
Nov 2, 2022AApt 54 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 5, 2023
Nov 2, 2022AApt 54 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 5, 2023
Nov 2, 2022AApt 54 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 5, 2023
Nov 2, 2022AApt 54 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st DOOR FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 5, 2023
Nov 2, 2022AApt 54 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 5, 2023
Nov 2, 2022AApt 43 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 5, 2023
Nov 2, 2022AApt 43 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM , THE FOYER LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 5, 2023
Nov 2, 2022A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME READILY ACCESSIBLE FOR SIGNATURE, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT TOO HIGH AT PUBLIC HALL, 1st STORYFeb 5, 2023
Nov 2, 2022BApt 43 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BASIN IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM NORTH AT EASTDec 7, 2022
Nov 2, 2022AApt 43 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 5, 2023
Nov 2, 2022AApt 43 · § 27-2005 ADM CODE REFIT LOWER SASH AT EAST IN THE KITCHEN LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 5, 2023
Oct 20, 2014CApt 43 · § 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNERNov 17, 2014
Sep 22, 2006BApt 43 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT THE SOUTH WALL, EAST WALL, CEILING IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM NORTH AT EASTNov 1, 2006
Sep 22, 2006BApt 43 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT THE NORTH AND EAST WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM NORTH AT EASTNov 1, 2006

Issued in the last 120 days

DateSourceWhatNow
Aug 18, 2026HPD B§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 23, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Jul 28, 2026HPD C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Open
Jul 28, 2026HPD C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 12:55 PM ET. BBL 2033500003.

Look up another building