Manhattan · Block 1892 · Lot 5 · 10025

319 West 106 Street

5 floors · 10 apartments · 6,570 sq ft · built 1899 · class C5 · owner of record: 319 West 106th Street, Llc

9open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
44dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-31 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (9) · C 1 · B 3 · A 5
IssuedClassViolationCorrect by
Jun 17, 2021C§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS PANE AT UPPER SASH WINDOW AT VESTIBULE, AT PUBLIC HALL, 1st STORYJun 23, 2021
Mar 11, 2021BApt 1A · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EASTApr 15, 2021
Mar 11, 2021BApt 1A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR - THE WEST WALL IN THE FOYER LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EASTApr 15, 2021
Dec 4, 2019AApt 1B · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RISER IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 8, 2020
Dec 4, 2019AApt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EASTMar 8, 2020
Dec 4, 2019AApt 1B · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RISER IN THE BATHROOM LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 8, 2020
Dec 4, 2019B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT STEPS 2ND AND 3RD UP FROM BOTTOM FROM STREET ENTRANCE TO BUILDINGJan 8, 2020
Dec 4, 2019A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORYMar 8, 2020
Dec 4, 2019AApt 1B · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RISER IN THE 1st ROOM FROM NORTH LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 8, 2020

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 11:36 PM ET. BBL 1018920005.

Look up another building