Bronx · Block 3349 · Lot 27 · 10467

3165 Decatur Avenue

6 floors · 61 apartments · 78,300 sq ft · built 1928 · class D1 · owner of record: 3165 Llc

73open violations
$0ECB/OATH penalties owed
37HPD class C (immediately hazardous)
58dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 58 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 58 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 74 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 78,300 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 179 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 179 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 302 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1154 days
Next cycle year 2029
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3349). Agency page

Dec 31, 2029
in 1154 days
Next due 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-09 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Mar 19, 2021ELEVATOR

#9027/697193
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
HPD (70) · C 37 · B 25 · A 8
IssuedClassViolationCorrect by
Aug 26, 2026AApt 1A · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 29, 2026
Aug 26, 2026AApt 1A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT NORTH, THE KITCHEN , THE 2nd ROOM FROM EAST AT SOUTH, THE PRIVATE HALLWAY LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 29, 2026
Aug 26, 2026CApt 1A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 1A, 2nd STORY, 3rd Oct 3, 2026
Aug 26, 2026CApt 1A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SOct 3, 2026
Aug 25, 2026AApt 1A · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE BATH TUB IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 28, 2026
Aug 25, 2026CApt 1A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTSep 20, 2026
Aug 25, 2026CApt 1A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTSep 20, 2026
Aug 25, 2026AApt 1A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 28, 2026
Aug 25, 2026AApt 1A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER SASH OF SOUTH WINDOW IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 28, 2026
Aug 25, 2026BApt 1A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW PANE AT UPPER SASH OF SOUTH WINDOW IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTSep 29, 2026
Aug 25, 2026AApt 1A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 28, 2026
Aug 25, 2026AApt 1A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINETS AT WEST WALL IN THE KITCHEN LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 28, 2026
Jul 20, 2026B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORYAug 24, 2026
Jul 20, 2026C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORYAug 3, 2026
Jul 20, 2026BApt 3D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 3D, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTAug 24, 2026
Mar 19, 2026BApt 2C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2C, 4th STORY, 1st APARTMENT FROM WEST AT NORTHApr 23, 2026
Mar 19, 2026BApt 11C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 11C, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTApr 23, 2026
Feb 18, 2026C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Feb 22, 2026
Feb 18, 2026C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Feb 22, 2026
Oct 23, 2025CApt A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT A, 1st STORY, 1st APARTMENT FROM WEST AT NORTHNov 18, 2025
Sep 23, 2025CApt 6A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 19, 2025
May 19, 2025A§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY CAPS/ COVERS FOR ELECTRICAL OUTLETS AT NORTH WALL AT PUBLIC HALL, 1st STORYAug 22, 2025
Apr 15, 2025CApt 3D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 5th STORY, 1st APARTMENT FROM NORTH AT EASTMay 11, 2025
Feb 6, 2025BApt B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT ON CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT B, 1st STORY, 1st APARTMENT FROM NORTH AT EASTMar 13, 2025
Feb 3, 2025B§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE AT BUILDING REAR YARDMar 10, 2025
Feb 3, 2025B§ 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.Mar 10, 2025
Feb 3, 2025B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS ALL WALLS AT 1st PUBLIC HALL BULKHEAD FROM NORTHMar 10, 2025
Feb 3, 2025B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTHMar 10, 2025
Dec 11, 2024CApt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE 1st PRIVATE HALLWAY FROM EAST LOCJan 18, 2025
Dec 10, 2024BApt 5D · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT WASTE LINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''CENTER''Jan 14, 2025
Dec 10, 2024CApt 3D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTHJan 5, 2025
Oct 31, 2024BApt 9E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ FEET AT CEILING IN THE BATHROOM LOCATED AT APT 9E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHDec 5, 2024
Dec 6, 2023BApt 10E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 10E, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHJan 10, 2024
Dec 6, 2023BApt C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJan 10, 2024
Dec 6, 2023BApt D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 10, 2024
Dec 6, 2023BApt 2E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2E, 6th STORY, 1st APARTMENT FROM WEST AT NORTHJan 10, 2024
Dec 6, 2023BApt 9B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 9B, 3rd STORY, 6th APARTMENT FROM NORTH AT EASTJan 10, 2024
Dec 6, 2023BApt 9C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 9C, 4th STORY, 6th APARTMENT FROM NORTH AT EASTJan 10, 2024
Dec 6, 2023BApt 3C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3C, 4th STORY, 1st APARTMENT FROM NORTH AT EASTJan 10, 2024
Dec 6, 2023BApt 11E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 11E, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTJan 10, 2024
Nov 30, 2023C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Dec 4, 2023
Nov 30, 2023C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Dec 4, 2023
Mar 3, 2023BApt 10D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 15 SQ FT SOUTH WALL AND 2 SQ FT AND WEST WALL IN THE BATHROOM LOCATED AT APT 10D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHApr 7, 2023
Jul 7, 2022BApt 7E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR FRAME TO THE APARTMENT IN THE ENTRANCE LOCATED AT APT 7E, 5th STORY, 3rd APARTMENT FROM WEST AT NORTHAug 11, 2022
Jul 7, 2022BApt 7E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 7E, 5th STORY, 3rd APARTMENT FROM WEST AT NORTHAug 11, 2022
Jul 7, 2022BApt 7E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR UNDER HEATER IN THE 4th ROOM FROM EAST LOCATED AT APT 7E, 5th STORY, 3rd APARTMENT FROM WEST AT NORTHAug 11, 2022
Feb 4, 2022BApt 5B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT FRIST WINDOW AT WEST APPROX 8 SQ FT, AT 2ND WINDOW AT WEST APPROX 12 SQ FT AT NORT WINDOW APPROX, AT NORTH WINDOW AT NORTH APPROX 8 SQ FT IN THE 5th ROOM FROM EAST LOCATED AT APT 5B, 3rd STORY, 1st APARTMENT FROMMar 11, 2022
Mar 19, 2021CApt 8D · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ..... IN THE ENTIRE APARTMENT LOCATED AT APT 8D, 5th STORY, 5th APARTMENT FROM NORTH AT EASTMar 23, 2021
Mar 19, 2021CApt 11E · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ..... IN THE ENTIRE APARTMENT LOCATED AT APT 11E, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTMar 23, 2021
Mar 10, 2021CApt 6A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 2nd STORY, 3rd APARTMENT FROM NORTH AT EASTMar 14, 2021
Mar 10, 2021CApt 10B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 10B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHMar 14, 2021
Mar 10, 2021CApt 4B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMar 14, 2021
Mar 10, 2021CApt 2B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHMar 14, 2021
Mar 10, 2021CApt 9C · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 9C, 4th STORY, 6th APARTMENT FROM NORTH AT EASTMar 14, 2021
Mar 10, 2021CApt 1C · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 4th STORY, 3rd APARTMENT FROM SOUTH AT WESTMar 14, 2021
Mar 10, 2021CApt 10D · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 10D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 14, 2021
Mar 10, 2021CApt 9D · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 9D, 5th STORY, 6th APARTMENT FROM NORTH AT EASTMar 14, 2021
Mar 10, 2021CApt 4D · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTMar 14, 2021
Mar 10, 2021CApt 2D · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 5th STORY, 1st APARTMENT FROM WEST AT NORTHMar 14, 2021
Mar 10, 2021CApt 10E · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 10E, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 14, 2021

Showing 60 of 70. Full list on the agency site.

Issued in the last 120 days

DateSourceWhatNow
Aug 26, 2026HPD A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTOpen
Aug 26, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT NORTH, THE KITCHEN , THE 2nd ROOM FROM EAST AT SOUTH, THE PRIVATE HALLWAY LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTOpen
Aug 26, 2026HPD C§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 1A, 2nd STORY, 3rd Open
Aug 26, 2026HPD C§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SOpen
Aug 25, 2026HPD A§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE BATH TUB IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTOpen
Aug 25, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTOpen
Aug 25, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTOpen
Aug 25, 2026HPD A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTOpen
Aug 25, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER SASH OF SOUTH WINDOW IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTOpen
Aug 25, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW PANE AT UPPER SASH OF SOUTH WINDOW IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTOpen
Aug 25, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTOpen
Aug 25, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINETS AT WEST WALL IN THE KITCHEN LOCATED AT APT 1A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTOpen
Jul 20, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORYOpen
Jul 20, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 3D, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTClosed
Jul 20, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTClosed
Jul 20, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTClosed
Jul 20, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORYOpen
Jul 20, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 3D, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Jul 20, 2026HPD B§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT SINK IN THE KITCHEN LOCATED AT APT 3D, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTClosed
Jul 20, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 5th STORY, 1st APARTMENT FROM SOUTH AT WESTClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 3, 2026, 5:42 AM ET. BBL 2033490027.

Look up another building