3154 Emmons Avenue

3 floors · 32,009 sq ft · built 1980 · class H9 · owner of record: Emmons Development Llc

3open violations
$8,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
167dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 32,009 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 411 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-09 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $8,750 owed
IssuedViolationHearingBalance
Dec 10, 2025Construction CLASS - 2
OBSERVED ON THE SECOND FLOOR IN THE ELECTRIC ROOM AN ACTIVE GAS LEAK ON HOT WATER HEATER GAS LINE. FIRST FLOOR IN THE ELECTRIC ROOM THERE ARE OPEN AND BROKEN WASTE LINES AND PVC WASTE LINES. ALL THREE ELECTRICA
#39170015H
Feb 22, 2027
DEFAULT
$6,250
Nov 25, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. GAS FUMES LEAKING BACK INTO BUILDING ON 2ND FLOOR, BECAUSE OF IMPROPER EXHAUSTED VENTILATION. EXHAUSTED MUST BE 2 FEET APART. BOTH EXHAUSTED ARE FACING IN
#39168357P
May 18, 2027
PENDING
$2,500
DOB (1)
IssuedViolationStatus
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#36255
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)