4 floors · 11 apartments · 8,438 sq ft · built 1896 · class C5 · owner of record: West 88a Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1141 days | Next cycle year 2029 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 4, 2022 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT | Oct 10, 2022 |
| Mar 14, 2018 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM IMPROPERLY FILLED OUT AT BASEMENT | Mar 22, 2018 |
| Feb 27, 2017 | B | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ,AT ENTRANCE TO BLDG. , 1st STORY | Apr 3, 2017 |
| Sep 1, 2016 | B | Apt 7 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 6, 2016 |
| Sep 1, 2016 | B | Apt 7 · SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 6, 2016 |
| Feb 25, 2013 | C | SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LATCH LOCK ASSEMBLY WIHT EYELET CAPABLE RECEIVING PADLOCK AT SCUTTLE COVER AT PUBLIC HALL, 4th STORY | Mar 3, 2013 |
| Feb 25, 2013 | B | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE MATERIAL AT ORNAMENTIAL BROWN STONE BETWEEN WINDOWS AT 2ND & 3RD STORY BUILDING FRONT EXTERIOR WALL | Apr 1, 2013 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 2:56 PM ET. BBL 1012500023.