Bronx · Block 2419 · Lot 1 · 10451

3134 Park Avenue

2 floors · 8,250 sq ft · built 1900 · class Y1 · owner of record: Fire Department Of New York

7open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
64dto Annual boiler inspection (2 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-10-15 (Accepted). Agency page

Dec 31, 2026
in 64 days
2 of 2 without an accepted 2026 report yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 795 days
Next cycle year 2028

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Jul 18, 2025Boilers CLASS - 1
CEAE USE BURNHAM GAS FIRED BOILER MODEL #5012N, DUE TO POSSIBLE COLLAPSED CHIMNEY, CHIMNEY BASE CLOGGED WITH DEBRIS (BRICKS, ROCK,& SOOT) DO NOT OPERATE BOILER UNTIL ALL HAZARDOUS CONDITIONS ARE IMMEDIATELY COR
#39154125Z
Aug 29, 2025
POP/IN-VIO
$0
Jun 1, 2018Boilers CLASS - 2
B254.50A.50B.50C.50D.50E.50F.50G.50H.50A:ADEQUATE FRESH AIR NOT SUPPLIED TO BOILER ROOM.50B:SECOND SPILL SWITCH NOT INSTALLED.50F:HOLES IN BOILER ROOM WALLL.50C:CHECK VALVE ON FEEDWATER PIPING NOT INSTALLED.50G
#32097034K
Aug 3, 2018
POP/IN-VIO
$0
DOB (2)
IssuedViolationStatus
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#29907
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#08058
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 4:35 PM ET. BBL 2024190001.

Look up another building