5 floors · 2 apartments · 3,225 sq ft · built 1930 · class O8 · owner of record: Amazis Solomon Living Trust
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 50 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-07-18 (Accepted). Agency page | Dec 31, 2026 in 50 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 31, 2026 | Unknown CLASS - 2 AT THE TIME OF INSPECTION, I OBSERVED AN INADEQUATE STORAGE ZONE ADJACENT TO AN EXISTING SIDEWALK SHED CONTAINING A DEBRIS CONTAINER AND PORT-O-SAN. THE STORAGE ZONE WAS NOT ENCLOSED WITH REQUIRED 4-FOOT-HIGH B #39557349Y | May 10, 2027 PENDING | $2,500 |
| Jul 31, 2026 | Construction CLASS - 2 GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039554995P. COMPLY WITH CODE FILE CERTIFICATE OF CORRECTION... #39557348M | May 10, 2027 PENDING | $1,250 |
| Jul 31, 2026 | Construction CLASS - 2 GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039554994N. COMPLY WITH CODE FILE A CERTIFICATE OF CORRECTION... #39557346Z | May 10, 2027 PENDING | $1,250 |
| Jul 31, 2026 | Construction CLASS - 2 GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039554993L. COMPLY WITH CODE FILE CERTIFICATE OF CORRECTION... #39557345R | May 10, 2027 PENDING | $1,250 |
| Jul 31, 2026 | Construction CLASS - 2 GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039554967H. COMPLY WITH CODE FILE A CERTIFICATE OF CORRECTION... #39557344P | May 10, 2027 PENDING | $1,250 |
| Jun 3, 2026 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION SITE INSTALLED COLD FORM STEEL WAS MISSING BLOCKING AND STRAP BRIDGING ON FLOORS 1-4. SITE INSTALLATION OF COLD FORM STEEL IS CONTRARY TO APPROVE DRAWINGS SEE S-502.00. 28-105.12.2 #39554994N | Aug 13, 2026 IN VIOLATION | $625 |
| Jun 3, 2026 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OBSERVED MEDIUM DUTY SUPPORTED SCAFFOLD @ EXP. 1 & 4 INSTALLED CONTRARY TO PLANS EQ. 102.00 28-105.12.2 SITE SUPPORTED SCAFFOLD WITH MULTIPLE LEVELS PLANKED . THE PLANS CALLS FOR ON #39554995P | Aug 13, 2026 IN VIOLATION | $625 |
| Jun 3, 2026 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION WORK DOES NOT CONFORM TO APPROVE STRUCTURAL DRAWINGS: S-101.00, HSS 3 1/2 X 3 1/2 X 3/8 COLUMNS NOT INSTALL ON FLOORS 1,2,3,4 & FO-301.00 MISSING TEMPORARY HSS POST & STEEL BEAM C9 #39554993L | Aug 13, 2026 IN VIOLATION | $625 |
| Jun 2, 2026 | Construction CLASS - 1 AT THE TIME INSPECTION OBSERVED FLOORS 1-5 WITHOUT INGRESS/EGRESS ACCESS TO EXISTING STRUCTURE. THE SITE FAILED TO MEET/MAINTAIN ALL ELEMENTS SAFEGUARD WORKERS, PROVIDE EGRESS/INGRESS ACCESS, PROVIDING SEQUENCE #39554967H | Mar 11, 2027 PENDING | $2,500 |
| Feb 5, 2026 | Construction CLASS - 1 NOTE: AT TIME OF INSPECTION OF AN ACTIVE SITE, I OBSERVED ONGOING ALTERATION WORK, UPON REVIEWING THE DEPARTMENT RECORDS IT WAS FOUND THAT NO ALTERATION GENERAL CONSTRUCTION PERMIT WERE ISSUED FOR THE ALTERATIO #39549968N | Feb 25, 2027 DEFAULT | $2,530 |
| Jul 24, 2025 | Construction CLASS - 1 RESPONDENT FAILED TO COMPLY WITH AN ORDER OF THE COMMISSIONER AND TO OBTAIN A REQUIRED PERMIT PROMPTLY. SUBSECTION 28-201.1 UNLAWFUL ACTS. REF 39540768H ISSUED ON 05/29/2025, NO PERMIT, OBTAINED AS PER THE DATE #39542768R | Apr 20, 2027 DEFAULT | $6,250 |
| May 28, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED EXCAVATION WORK DONE ON PREMISES. APPROX. 5 FT. DEEP AND 2 FT. WIDE, UNDERPINNING WORK EXPOSED. AS PER DOB RECORDS NO EARTHWORK, UNDERPINNING WORK PERMIT HAS BEING ISSUED. ADJ. PR #39540768H | Oct 23, 2025 DEFAULT | $6,250 |
| Oct 29, 2018 | Construction CLASS - 2 ALTERED/CHANGED BUILDING OCCUPIED W/O A VALID C OF O. NOTED:BUILDING WAS ALTERED PER JOB#102332138, HOWEVER OBSERVED THE ENTIRE BUILDING WASOCCUPIED W/O C OF O. (C OF O#73831 INDICATES PRIVATE CLUB) REMEDY:OBTA #35250466L | Dec 20, 2018 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #02956 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #04839 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #01962 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #02922 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #03066 | DOB VIOLATION - ACTIVE |
| Aug 19, 1999 | IMMEDIATE EMERGENCY #289/99 | DOB VIOLATION - ACTIVE |
| Aug 19, 1999 | CONSTRUCTION #MTF01FE | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #04249 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 8, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 31, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION, I OBSERVED AN INADEQUATE STORAGE ZONE ADJACENT TO AN EXISTING SIDEWALK SHED CONTAINING A DEBRIS CONTAINER AND PORT-O-SAN. THE STORAGE ZONE WAS NOT ENCLOSED WITH REQUIRED 4-FOOT-HIGH B | Open |
| Jul 31, 2026 | ECB | Construction: GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039554995P. COMPLY WITH CODE FILE CERTIFICATE OF CORRECTION... | Open |
| Jul 31, 2026 | ECB | Construction: GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039554994N. COMPLY WITH CODE FILE A CERTIFICATE OF CORRECTION... | Open |
| Jul 31, 2026 | ECB | Construction: GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039554993L. COMPLY WITH CODE FILE CERTIFICATE OF CORRECTION... | Open |
| Jul 31, 2026 | ECB | Construction: GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039554967H. COMPLY WITH CODE FILE A CERTIFICATE OF CORRECTION... | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |