12 floors · 47 apartments · 31,512 sq ft · built 1987 · class D1 · owner of record: Mmp 309 Owner Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 51 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 51 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 67 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $24,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 103 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 31,512 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 172 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 172 days | Annual filing |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-30 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 26, 2025 | Construction CLASS - 2 FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 35679348M ISSUED ON 06/26/2024 FOR MISCELLANEOUS VIOLATIONS( PERMIT EXPIRE ), FILE A CERTIFICATE OF CORRECTION #39168495N | Feb 26, 2026 IN VIOLATION | $0 |
| Aug 19, 2024 | Construction CLASS - 1 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER.NOTED:AT THE TIME OF INSPECTION A WRITTEN POSTED VACATE ORDER HAS BEEN REMOVED FROM THE FRONT ENTRY GATE(FENCE),VACATE ORDER#M102/24 WAS ISSUED ON 06/26/2024 IT #35681175X | Dec 9, 2025 IN VIOLATION | $0 |
| Jun 26, 2024 | Construction CLASS - 1 28-116.4 FAILURE TO OBTAIN LETTER OF COMPLETION.NOTED:BASED ON BUILDING RECORDS PERMIT #123005185 PERMITTED ON 01/30/2017 BUT EXPIRED 07/28/2017 & NEVER SIGN-OFF:"OWNER SHALL TAKE ALL NECCESSARY STEPS FOR ISSUA #35679348M | Dec 4, 2025 IN VIOLATION | $0 |
| Apr 26, 2024 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPT OF BUILDINGS RECORDS.ILLEGAL OCCUPANCY NOTED:ROOF LEVEL HAS BEEN CONVERTED/OCCUPIED AS BEDROOM IN CONJUNCTION WITH APT PH B AT 11TH FLOOR CREATING A DUPLEX APARTME #35676964M | Dec 5, 2024 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 13, 2026 | C | Apt 9C · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM WEST AT NORTH | Oct 11, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 13, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 9C, 9th STORY, 3rd APARTMENT FROM WEST AT NORTH | Open |
| Oct 13, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 9D, 9th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 1:41 PM ET. BBL 1007540031.