5 floors · 108,500 sq ft · built 1924 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-18 (Accepted). Agency page | Dec 31, 2026 in 50 days | 3 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 108,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 781 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 553). Agency page | Dec 31, 2033 in 2607 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 11, 2026 | Construction CLASS - 2 REISSUE ECB #35691845P. FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. ILLUMINATION AT THE TIME OF INSPECTION EMERGENCY LIGHTS NOT WORKING AT: 5TH FLOOR GYM AND OUTSIDE GYM, 4TH FLOOR-STAIRS H, EXIT 2 AND 3 #35727114N | Mar 5, 2026 POP/IN-VIO | $0 |
| Feb 11, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION NOTED: SMOKE DOOR(FIRST FLOOR, STAIR D)-WARPED, SMOKE DOOR TO CAFETERIA KITCHEN NOT SELF-CLOSING. REMEDY: REPAIR AND/OR REPLACE. #35727116R | Mar 5, 2026 POP/IN-VIO | $0 |
| Feb 11, 2026 | Construction CLASS - 2 REISSUE ECB #35691842J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. AT THE TIME OF INSPECTION NOTED AT EXPOSURE #3 RAMP OUTSIDE ATEXIT 11 MISSING A CHUNK OF STONE ALONG BOTTOM RAILING POST, EXPOSING P #35727115P | Mar 5, 2026 POP/IN-VIO | $0 |
| Mar 18, 2025 | Construction CLASS - 2 35676468N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED EXP #3 RAMP OUTSIDE AT EXIT #11 IS MISSING A CHUNK OF STONE ALONG BOTTOM RAILING POST. EXPOSING PIECE OF SHARP METAL. REMEDY: REPAIR AND/O #35691842J | Apr 29, 2025 POP/IN-VIO | $0 |
| Mar 18, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED EMERGENCY LIGHTS NOT WORKING WHEN TESTED. AT 5TH FL GYM(2) LIGHTS #35691845P | Apr 29, 2025 POP/IN-VIO | $0 |
| Feb 22, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:EXP#3 RAMPOUTSIDE OF EXIT#11 MISSING BRICK AT TOP LANDING LEVEL & MISSING 1 CRACKED PIECE OF STONE AT THE BOTTOM OF THE RAMP ALONG RAILING POST.REM:RE #35676468N | Apr 22, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 14, 2011 | PLUMBING FAILURE TO MAINTAIN, NO FIRE SUPPRESSION IN CAFETERIA KITCHEN #401PO01 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 7:29 PM ET. BBL 4005530001.