5 floors · 38 apartments · 31,660 sq ft · built 2019 · class D1 · owner of record: Tlc3137 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 31,660 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 792 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 1, 2024 | Construction CLASS - 1 FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMENTING THE CONDITIONS OF PSID#Q0003050 BY THE AUGUST 1,2024 DEADLINE.TO DATE,THE DEPARTMENT HAS #37030694L | Aug 5, 2025 IN VIOLATION | $2,500 |
| Oct 18, 2019 | Construction CLASS - 1 HOUSEKEEPING. AT TIME OF INSPECTION OF A NEW 5 STY BLDG A ACTIVE SITE OBSERVED NUMEROUS AREAS W/DEBRIS PILES OF SHEETROCK,WOOD,GARBAGE THROUGHOUT BLDG ALSO LOSE MATERIAL LEFT FROM PREVIOUS DAY ON ROOF(OCTOBER #35455793H | Dec 31, 2019 IN VIOLATION | $2,500 |
| Apr 15, 2019 | Construction CLASS - 1 WORK W/O A PERMIT. AT TIME OF INSPECTION ON AN ALT-2 PROPOSED 5-STORY BUILDING AT SOE/FOUNDATION PHASE OBSERVED CONCRETE PLACEMENT,FORMWORK AND STEEL REINFORCEMENT WORK DONE. UPON REVIEW OF PERMIT#440534753 FOR #35421259M | Jun 25, 2019 IN VIOLATION | $625 |
| Apr 15, 2019 | Construction CLASS - 1 28-116.1 INADEQUATE TR1 PROGRAM-MISSING SIGNATURE.AT TIME OF INSPECTION ON AN ALT-2 PROPOSED 5-STORY BLD.AT SUE/FOUNDATION PHASE OBSERVED EXCAVATION,SHERING,BRACING,CONCRETE WORK,FOOTINGS DONE & STEEL REINFORCE #35421260J | Jun 25, 2019 IN VIOLATION | $625 |
| Apr 6, 2019 | Construction CLASS - 1 FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. UPON INSPECTION I OBSERVED A CONSTRUCTION SITE IN THE EXCAVATION/FOUNDATION PHASE W/THE GATE UNLOCKED WHILE THE JOB SITE WAS UNAT #35363971N | Jun 11, 2019 IN VIOLATION | $2,400 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 29, 2026 | C | Apt 2A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Jan 29, 2026 |
| Jan 20, 2026 | C | Apt 2A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 17, 2026 |
| Sep 23, 2020 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Dec 27, 2020 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 27, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed |
| Jul 27, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT CELLAR AT BOILER ROOM | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 3:03 PM ET. BBL 4006570032.