2 floors · 4,860 sq ft · built 1900 · class M1 · owner of record: One Accord Of God In Christ Jesus
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 791 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 29, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS # 39073310X., FILE A CERTIFICATE OF CORRECTION #39175371R | Nov 23, 2026 PENDING | $1,250 |
| Jan 29, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO OBTAIN PERMITS FOR SUMMONS # 39067401K., COMPLY WITH COMMISSIONER'S ORDER #39175370P | Nov 23, 2026 PENDING | $2,500 |
| Sep 6, 2023 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR ECB # 39074064Y ISSUED 11/17/2022, FILE A CERTIFICATE OF CORRECTION; FILE A CERTIFICATE OF #39094203N | Dec 15, 2023 IN VIOLATION | $0 |
| Nov 17, 2022 | Construction CLASS - 2 OBSERVED AT EXP2 EXTERIOR REMOVED EXISTING STAIRCASE AND INSTALLED NEW FIRE ESCAPE, ALSO NOTED AT 2ND FL. RENOVATED/INSTALLED NEW ELECTRICAL WORK/WIRING WITH/FOR LIGHTS, OUTLETS, SWITCHES ETC. PLUMBING WATER/WA #39074064Y | Aug 28, 2023 IN VIOLATION | $0 |
| Nov 3, 2022 | Construction CLASS - 1 NOTED: OBSERVED AT FRONT ENTRY/VESTIBULE EXTERIOR FACADE WITH BULGING BRICKS, MISSING MORTAR AND STEP CRACKS THROUGHOUT IN VARIOUS LOCATIONS, REPAIR AND/REPLACE; MAINTAIN BUILDING #39073310X | Aug 28, 2023 IN VIOLATION | $0 |
| Aug 4, 2022 | Construction CLASS - 1 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED 3RD LEVEL APARTMENT IN STATE OF ALTERATION. NEW WOOD AND METAL STUD FRAMING IN PLACE. ELECTRICAL WORK ALTERED INCLUDES NEW PANEL, RECESSED LIGHTING AND ROME #39067401K | Aug 28, 2023 IN VIOLATION | $0 |
| Oct 12, 2006 | Construction Non-Hazardous FAILURE TO MAINTAIN BLDG. DEFECTS NOTED:ACCESSORY STAIR ON WEST REAR SIDE OF PROPERTY IS DILAPIDATED WITH RUSTED & CORRDED RAILINGS & STAIRS& SEVERAL MISSING THREADS. ALSO, OUTSIDE STAIR IS CLAD WITH CORRUGATED #34542805P | Feb 12, 2007 IN VIOLATION | $0 |
| Aug 23, 2004 | Construction Non-Hazardous FAILURE TO MAINTAIN EXTERIOR BLDG WALL.DEFECT IS:BRICK FACADE AT FRONT OF BLDG HAS CRACKS IN SEVERAL LOCATIONS AND IS PULLING AWAY FROM BLDG BRICKS HAVE PULLED AWAY FROM BLDG APPROX 3" AT 2-3RD FLOOR LEVEL #34432222X | Feb 28, 2005 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 1, 2004 | EMERGENCY #132/04A | DOB VIOLATION - ACTIVE |
| Aug 27, 2004 | EMERGENCY #132/04 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 5:58 AM ET. BBL 3015910057.