Bronx · Block 2556 · Lot 53 · 10454

309 Crimmins Avenue

1 floors · 1,386 sq ft · built 1931 · class K1 · owner of record: Crm 309 Llc

3open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
787dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 56 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 787 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Jun 26, 2025CONSTRUCTION
FTC W/COMMISSIONER'S ORDER 041725PI20101SB CONTROL#342020 DATED 4/17/2025 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT.AS OF TODAY'S DATE 06/26/25 THERE ARE NO JOBS FILED IN BIS OR DOBNOW TO REPAIR BLDG. IMMED COMPLY W/COMMISSIONER'S ORDER 041725PI20101SB CONTROL#342020 TO REPAIR BLDG UNDER PE
#PI20101ZT
DOB VIOLATION - ACTIVE
Apr 17, 2025CONSTRUCTION
FTM BLDG IN A CODE COMPLIANT MANNER. OBSV AT EXP4 MASONRY CRACKS AT MULT LOCATIONS. REMEDY: OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG. DETERMINE THE STRUC STAB AND PREPARE/FILE REPAIR DWGS. BLDG T/BE REPAIRED UNDER PERMIT STARTING MAY 17 2025 AND COMPLETED/SIGNED OFF BY JUNE 16 2025
#PI20101SB
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 5, 2026, 9:30 PM ET. BBL 2025560053.

Look up another building