Bronx · Block 4543 · Lot 29 · 10467

3069 Barker Avenue

2 floors · 5 apartments · 3,128 sq ft · built 1931 · class C2 · owner of record: 3069 Barker Llc

4open violations
$7,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 430 days
Next cycle year 2027

Open violations

ECB / OATH (3) · $7,500 owed
IssuedViolationHearingBalance
Sep 25, 2026Site Safety CLASS - 1
AT THE TIME OF INSPECTION OF ON-GOING CONSTRUCTION OF 13 STORY BUILDING IN FOUNDATION PHASE REBAR INSTALLATION, OBSERVED EXCAVATION PARTIALLY COMPLETE AND SUPPORT OF EXCAVATION (SOE) STEEL CASING PILE INSTALLED
#39559677M
Dec 4, 2026
PENDING
$2,500
Sep 25, 2026Construction CLASS - 1
AT THE TIME OF INSPECTION OF ON-GOING CONSTRUCTION OF 13 STORY BUILDING ON FOUNDATION PHASE INSTALLATION OF REBAR ON PROGRESS, OBSERVED INCOMPLETE EXCAVATION AND SOE AT EXP#1 NO SLOPE OF 1:1 AND SUPPORT OF EXCA
#39559676K
Dec 4, 2026
PENDING
$2,500
Sep 25, 2026Construction CLASS - 1
DURING THE INSPECTION OF THE CONSTRUCTION OF 13-STORY NB OBSERVED EXCAVATION/ EARTHWORK FOR BUILDING FOUNDATION UPON CHECKING ON DOB INSPECTION, NO EARTHWORK NOTIFICATION WAS RECEIVED. CONTRARY TO CODE BC 3304.
#39559678Y
Dec 4, 2026
PENDING
$2,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (1) · C 0 · B 1 · A 0
IssuedClassViolationCorrect by
Mar 11, 2020BApt BASEME · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ... REGLAZE PORCELAIN BATHTUB IN THE BATHROOM LOCATED AT APT BASEME, 1st APARTMENT FROM SOUTH AT WESTApr 15, 2020

Issued in the last 120 days

DateSourceWhatNow
Sep 25, 2026ECBSite Safety: AT THE TIME OF INSPECTION OF ON-GOING CONSTRUCTION OF 13 STORY BUILDING IN FOUNDATION PHASE REBAR INSTALLATION, OBSERVED EXCAVATION PARTIALLY COMPLETE AND SUPPORT OF EXCAVATION (SOE) STEEL CASING PILE INSTALLEDOpen
Sep 25, 2026ECBConstruction: AT THE TIME OF INSPECTION OF ON-GOING CONSTRUCTION OF 13 STORY BUILDING ON FOUNDATION PHASE INSTALLATION OF REBAR ON PROGRESS, OBSERVED INCOMPLETE EXCAVATION AND SOE AT EXP#1 NO SLOPE OF 1:1 AND SUPPORT OF EXCAOpen
Sep 25, 2026ECBConstruction: DURING THE INSPECTION OF THE CONSTRUCTION OF 13-STORY NB OBSERVED EXCAVATION/ EARTHWORK FOR BUILDING FOUNDATION UPON CHECKING ON DOB INSPECTION, NO EARTHWORK NOTIFICATION WAS RECEIVED. CONTRARY TO CODE BC 3304.Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 3:08 PM ET. BBL 2045430029.