6 floors · 189,091 sq ft · built 2018 · class J6 · owner of record: 300 North Henry Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 189,091 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2607). Agency page | Dec 31, 2027 in 415 days | Next due 2027 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 781 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 9, 2026 | Unknown CLASS - 2 DURING MY INSPECTION AND UPON REVIEWING DOB NOW AND BIS SYSTEMS REVEALS SSM / SSC ON MULTIPLE PERMITS AND NB NOT IN COMPLIANCE TO CODE BC 3310.5.4 NO WORK ALLOWED UNDER APPLICATION 321194113-01-NB EXCEPT TO UP #39552826P | Jul 20, 2026 DEFAULT | $5,000 |
| Feb 1, 2026 | Unknown CLASS - 1 3307.6.5.1 CLOSED PROPOSED 6STORY MB. SWS @EXPO1&2 NOT CODE COMPLIANT: UNMAINTAINED & MISSING MUDSILLS. @EXPO1 SWS POST IS SEEN FLOATING, ANOTHER POST IS DISLODGED FROM MUDSILL. WEIGHT OF SNOW ATOP SWS CREATES #39549771J | Feb 22, 2027 | $5,000 |
| Issued | Violation | Status |
|---|---|---|
| Jun 24, 2020 | CONSTRUCTION FTM-COMCR BLD@NW CRNR LOT ADDNG 4FLS W/O PERMT.TIME INSPET CMU INSTL @ VERT ADDITION,NOT CODE COMPLT,CNY WALL TIES NO MOVT IN BOTH DIRECT STRCTRL STEEL W/O PRMT NOT CODE COMPL.BEAMS IMPROP CONNECT'D TO CONC STRUCT.NYSPE IMMED EVALU ENTIRE BLDG.PROV.REPAIRS CODE COMPLIANCE UNDR PRMT PER EVAL COMPLT R #FEU30101BS | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #08802 | DOB VIOLATION - ACTIVE |
| Jul 23, 2019 | CONSTRUCTION INSP *2018- FTM-6 STRY NEW BLDG CONSTRUCTED W/OUT PRMT ON E.S. CORNER LOT BTWN BLDG "SOUND STAGE 28" & 29".LARGE OPENGS IN PIPE IN DECK NOT FRAMED.CMU WALL TIES DO NOT PREVENT MOVT IN BOTH DIRECTIONS.NO CONNECT LATERL SYSTM.PE IMMED EVALU ENTRE BLDG.PROVIDE REPRS UNDER PRMT PER PE EVALU TO ACHIEVE C #*FEU30102BS | DOB VIOLATION - ACTIVE |
| Jul 23, 2019 | CONSTRUCTION INSP *2018 -FTM-1 STRY NEW BLDG@THE S.E. CORNER LOT,CONSTRUCTED W/OUT PRMT&OCCUP AS SOUND STAGE 29.CMU WALL TIES DO NOT PREVENT MOVEMENT IN BOTH DIRECTIONS.STEEL FRAMED LATERAL SYSTEM NOT STIFF.FIREPROOF MISSNG AT ROOF FRAMING.PE IMMED EVALU ENTIRE BLDG.PROVIDE REPRS UNDER PRMT TO ACHIEVE CODE COMPL #*FEU30103BS | DOB VIOLATION - ACTIVE |
| Jul 23, 2019 | CONSTRUCTION INSP *2018 -FTM- 6 STRY NEW BLDG CONSTRUCTED W/OUT PERMIT ON EAST SIDE CRNR LOT.STEEL FRAM'G INSTALLED W/OUT PERMIT.ALL SLAB CANTILEVER BEAMS MISSING MOMENT CONNECTIONS.COLUMNS NOT BEAR@ALL SPLICES.NUTS NOT FULLY ENGAGED.PE IMMED EVALU ENTIRE BLDG.PROV REPRS UNDR PERMIT PER PE EVALU TO ACHIEVE CODE #*FEU30101BS | DOB VIOLATION - ACTIVE |
| Jul 13, 2019 | CONSTRUCTION INSP *2018 -FTM-NEW BLDG @ N.E. CRNR OF LOT CONSTRUCTED W/OUT PRMT AND OCCUPIED AS "SOUND STAGE 27".CMU WALL TIES DO NOT PREVENT MOVEMENT IN BOTH DIRECTIONS.STEEL FRAME LATERL SYSTM NOT STIFF.FIREPROOF MISS'G AT STEEL ROOF FRAMING.NYSPE IMMD EVAL ENTIRE BLDG.PROV REPRS ACHIEVE CODE COMPLINCE UNDR PR #*FEU30103BS | DOB VIOLATION - ACTIVE |
| Jul 13, 2019 | CONSTRUCTION INSP *2018 -FTM-COMCRCL BLDG@NW CORNER LOT ADDING 4FLS W/OUT PRMT.CMU INSTL @ VERT ADDITON NOT CODE COMPL.CMU WALL TIES NO MOVEMENT IN BOTH DIRECTIONS.STRCTL STEEL W/OUT PRMT NOT CODE COMPL.BEAMS IMPROP CONNECT TO CONCR STRUCT.NYSPE IMMD EVALU ENTRE BLDG.PROV REPRS CODE COMPLIANCE UNDER PERMIT PER E #*FEU30101BS | DOB VIOLATION - ACTIVE |
| Jul 13, 2019 | CONSTRUCTION INSP *2018 -FTM-NEW BLDG AT N.E.CORNER OF LOT CONSTRUCTD W/OUT PERMIT AND OCCUP AS"SOUND STAGE 26".CMU WALL TIES DO NOT PREVENT MOVEMENTT IN BOTH DIRECTIONS.STEEL FRAME LATERL SYSTM NOT STIFF.LARGE CRACKS IN CMU @N.W. CRNR.NYSPE IMMD EVAL ENTRE BLDG.PROV REPRS ACHIEVE CODE COMPLIAN UNDER PERMIT PER #*FEU30102BS | DOB VIOLATION - ACTIVE |
| Jul 13, 2019 | CONSTRUCTION INSP *2018 -FTM-NEW BLDG ON E.S. OF CORNER LOT,PART CONSTRUCTED W/OUT PERMIT TO BE "SOUND STAGE 28".WALL TIES DO NOT PREVENT MOVEMENT OF CMU IN BOTH DIRCTIONS.PORTNS OF FRNT&REAR CMU WALLS DMG BY PART ROOF FRAMG COLLAP.PE IMMED EVAL ENTRE BLDG.PROV REPRS UNDR PERMIT TO ACHIEVE CODE COMPLIANCE&REPR D #*FEU30104BS | DOB VIOLATION - ACTIVE |
| Jan 25, 2019 | CONSTRUCTION #E30101MM | DOB VIOLATION - ACTIVE |
| Jun 19, 2018 | CONSTRUCTION #ID0101RV | DOB VIOLATION - ACTIVE |
| Dec 1, 2016 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST #03551 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Dec 1, 2016 | Elevators EVCAT1 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 7:36 AM ET. BBL 3026070006.