3 floors · 7 apartments · 6,030 sq ft · built 1927 · class C1 · owner of record: Bronks Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 309 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-13 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #08725 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #06487 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #10874 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #11409 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #11185 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #11790 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #205285 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #14563 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #16317 | DOB VIOLATION - ACTIVE |
| May 17, 1993 | LOCAL LAW 62/91 - BOILERS #05315 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| May 17, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 7, 2025 | B | Apt 2NS · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 2NS, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 11, 2025 |
| Jul 7, 2025 | B | Apt 2NS · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 2NS, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 11, 2025 |
| Apr 28, 2025 | C | Apt 4S · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4S, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 24, 2025 |
| Jun 5, 2024 | A | Apt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 8, 2024 |
| Jun 5, 2024 | A | Apt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 8, 2024 |
| Jun 5, 2024 | A | Apt 4N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 8, 2024 |
| Jun 5, 2024 | A | Apt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 8, 2024 |
| Jun 5, 2024 | A | Apt 4N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 8, 2024 |
| Jun 5, 2024 | A | Apt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 8, 2024 |
| Jun 5, 2024 | A | Apt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 8, 2024 |
| Jun 5, 2024 | A | Apt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 8, 2024 |
| Jun 5, 2024 | A | Apt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 8, 2024 |
| Jun 5, 2024 | A | Apt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 8, 2024 |
| Apr 22, 2024 | C | Apt 4N · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 22, 2024 |
| Mar 26, 2024 | C | Apt 4N · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 26, 2024 |
| Mar 26, 2024 | B | Apt 4N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 30, 2024 |
| Mar 26, 2024 | B | Apt 4N · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER AND LOWER WINDOW SASH SPRING BALANCES AT 1ST WINDOW FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 30, 2024 |
| Dec 18, 2023 | B | Apt 4N · § 27-2005 HMC: REFIT UPPER WINDOW SASHES AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt 4N · § 27-2005 HMC: REFIT UPPER WINDOW SASHES AT SOUTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt 4N · § 27-2005 HMC: REFIT UPPER WINDOW SASHES AT EAST 1 AND EAST 2 WINDOWS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt 4N · § 27-2005 HMC: REFIT UPPER WINDOW SASHES AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 22, 2024 |
| Mar 4, 2022 | C | Apt 2NS · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RADIATOR FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2NS, 1st | Mar 28, 2022 |
| Jul 23, 2018 | A | Apt 1N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH AND WEST WALL IN THE BATHROOM LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTH | Oct 26, 2018 |
| Jul 23, 2018 | B | Apt 1N · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APPROX 4 SQUARE FEET AT NORTH AND WEST WALL IN THE BATHROOM LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTH | Aug 27, 2018 |
| Jul 23, 2018 | A | Apt 1N · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HEATING ELEMENT COVER AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTH | Oct 26, 2018 |
| Jul 23, 2018 | A | Apt 1N · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HEATING ELEMENT COVER AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTH | Oct 26, 2018 |
| Jul 23, 2018 | B | Apt 1N · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTH | Aug 27, 2018 |
| Jul 23, 2018 | B | Apt 1N · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE FOYER LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTH | Aug 27, 2018 |
| Nov 20, 2017 | C | Apt 3S · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 3S, 2nd STORY, 1st | Jan 1, 2018 |
| Nov 20, 2017 | A | Apt 3S · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 3S, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 23, 2018 |
| Jun 24, 2016 | B | Apt 3N · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2016 |
| May 27, 2015 | A | Apt 3F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 30, 2015 |
| May 27, 2015 | A | Apt 3F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 30, 2015 |
| Apr 27, 2015 | B | Apt 3F · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 1, 2015 |
| Apr 27, 2015 | A | Apt 3F · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CEILING LIGHT FIXTURE COVER IN THE BATHROOM LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 31, 2015 |
| Apr 27, 2015 | B | Apt 3F · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASH COUNTER BALANCES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 1, 2015 |
| Apr 27, 2015 | B | Apt 3F · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 1, 2015 |
| Aug 22, 2014 | B | Apt 3S · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3S, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 26, 2014 |
| Mar 5, 2013 | A | Apt 3N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE FOYER LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 8, 2013 |
| Mar 5, 2013 | A | Apt 3N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 8, 2013 |
| Mar 5, 2013 | A | Apt 3N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 8, 2013 |
| Mar 5, 2013 | A | Apt 3N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 8, 2013 |
| Oct 25, 2012 | B | Apt 1N · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTH | Nov 29, 2012 |
| Feb 2, 2012 | B | Apt 1N · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM SOUTH AT WEST | Mar 8, 2012 |
| Jan 26, 2012 | A | Apt 1S · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST AT SOUTH, THE KITCHEN , THE BATHROOM , THE FOYER LOCATED AT APT 1S, 1st APARTMENT FROM NORTH AT EAST | Apr 30, 2012 |
| May 5, 2011 | C | Apt 1S · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORT | May 31, 2011 |
| Feb 23, 2009 | A | Apt 3S · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. CEILING IN THE BATHROOM LOCATED AT APT 3S, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 29, 2009 |
| Nov 19, 2008 | A | Apt 1S · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT BSMT-APT 1S, 1st BSMT-APT FROM NORTH AT EAST | Feb 22, 2009 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 9:52 AM ET. BBL 2033330057.