Bronx · Block 3333 · Lot 57 · 10467

3055 Hull Avenue

3 floors · 7 apartments · 6,030 sq ft · built 1927 · class C1 · owner of record: Bronks Llc

69open violations
$0ECB/OATH penalties owed
6HPD class C (immediately hazardous)
65dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 309 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1161 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-13 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (10)
IssuedViolationStatus
May 15, 2014LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
#08725
DOB VIOLATION - ACTIVE
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#06487
DOB VIOLATION - ACTIVE
Feb 27, 2001LOCAL LAW 62/91 - BOILERS

#10874
DOB VIOLATION - ACTIVE
Feb 7, 2000LOCAL LAW 62/91 - BOILERS

#11409
DOB VIOLATION - ACTIVE
Mar 16, 1999LOCAL LAW 62/91 - BOILERS

#11185
DOB VIOLATION - ACTIVE
May 4, 1998LOCAL LAW 62/91 - BOILERS

#11790
DOB VIOLATION - ACTIVE
Sep 16, 1997LOCAL LAW 62/91 - BOILERS

#205285
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#14563
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#16317
DOB VIOLATION - ACTIVE
May 17, 1993LOCAL LAW 62/91 - BOILERS

#05315
DOB VIOLATION - ACTIVE
DOB NOW Safety (11)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 7)
Active
May 15, 2014Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Feb 27, 2001Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Mar 16, 1999Boiler LL6291
Active
May 4, 1998Boiler LL6291
Active
Sep 16, 1997Boiler LL6291
Active
Feb 10, 1997Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
May 17, 1993Boiler LL6291
Active
HPD (48) · C 6 · B 18 · A 24
IssuedClassViolationCorrect by
Jul 7, 2025BApt 2NS · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 2NS, 1st STORY, 1st APARTMENT FROM WEST AT NORTHAug 11, 2025
Jul 7, 2025BApt 2NS · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 2NS, 1st STORY, 1st APARTMENT FROM WEST AT NORTHAug 11, 2025
Apr 28, 2025CApt 4S · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4S, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHMay 24, 2025
Jun 5, 2024AApt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHSep 8, 2024
Jun 5, 2024AApt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHSep 8, 2024
Jun 5, 2024AApt 4N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHSep 8, 2024
Jun 5, 2024AApt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHSep 8, 2024
Jun 5, 2024AApt 4N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHSep 8, 2024
Jun 5, 2024AApt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHSep 8, 2024
Jun 5, 2024AApt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHSep 8, 2024
Jun 5, 2024AApt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHSep 8, 2024
Jun 5, 2024AApt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHSep 8, 2024
Jun 5, 2024AApt 4N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHSep 8, 2024
Apr 22, 2024CApt 4N · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 22, 2024
Mar 26, 2024CApt 4N · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTMar 26, 2024
Mar 26, 2024BApt 4N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 30, 2024
Mar 26, 2024BApt 4N · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER AND LOWER WINDOW SASH SPRING BALANCES AT 1ST WINDOW FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 30, 2024
Dec 18, 2023BApt 4N · § 27-2005 HMC: REFIT UPPER WINDOW SASHES AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTJan 22, 2024
Dec 18, 2023BApt 4N · § 27-2005 HMC: REFIT UPPER WINDOW SASHES AT SOUTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTJan 22, 2024
Dec 18, 2023BApt 4N · § 27-2005 HMC: REFIT UPPER WINDOW SASHES AT EAST 1 AND EAST 2 WINDOWS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTJan 22, 2024
Dec 18, 2023BApt 4N · § 27-2005 HMC: REFIT UPPER WINDOW SASHES AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4N, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTJan 22, 2024
Mar 4, 2022CApt 2NS · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RADIATOR FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2NS, 1stMar 28, 2022
Jul 23, 2018AApt 1N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH AND WEST WALL IN THE BATHROOM LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTHOct 26, 2018
Jul 23, 2018BApt 1N · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APPROX 4 SQUARE FEET AT NORTH AND WEST WALL IN THE BATHROOM LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTHAug 27, 2018
Jul 23, 2018AApt 1N · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HEATING ELEMENT COVER AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTHOct 26, 2018
Jul 23, 2018AApt 1N · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HEATING ELEMENT COVER AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTHOct 26, 2018
Jul 23, 2018BApt 1N · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTHAug 27, 2018
Jul 23, 2018BApt 1N · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE FOYER LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTHAug 27, 2018
Nov 20, 2017CApt 3S · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 3S, 2nd STORY, 1st Jan 1, 2018
Nov 20, 2017AApt 3S · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 3S, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 23, 2018
Jun 24, 2016BApt 3N · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHJul 29, 2016
May 27, 2015AApt 3F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHAug 30, 2015
May 27, 2015AApt 3F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHAug 30, 2015
Apr 27, 2015BApt 3F · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJun 1, 2015
Apr 27, 2015AApt 3F · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CEILING LIGHT FIXTURE COVER IN THE BATHROOM LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJul 31, 2015
Apr 27, 2015BApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASH COUNTER BALANCES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJun 1, 2015
Apr 27, 2015BApt 3F · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJun 1, 2015
Aug 22, 2014BApt 3S · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3S, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 26, 2014
Mar 5, 2013AApt 3N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE FOYER LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJun 8, 2013
Mar 5, 2013AApt 3N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJun 8, 2013
Mar 5, 2013AApt 3N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJun 8, 2013
Mar 5, 2013AApt 3N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJun 8, 2013
Oct 25, 2012BApt 1N · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM WEST AT NORTHNov 29, 2012
Feb 2, 2012BApt 1N · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT 1N, 1st BSMT-APT FROM SOUTH AT WESTMar 8, 2012
Jan 26, 2012AApt 1S · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST AT SOUTH, THE KITCHEN , THE BATHROOM , THE FOYER LOCATED AT APT 1S, 1st APARTMENT FROM NORTH AT EASTApr 30, 2012
May 5, 2011CApt 1S · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTMay 31, 2011
Feb 23, 2009AApt 3S · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. CEILING IN THE BATHROOM LOCATED AT APT 3S, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTMay 29, 2009
Nov 19, 2008AApt 1S · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT BSMT-APT 1S, 1st BSMT-APT FROM NORTH AT EASTFeb 22, 2009

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 9:52 AM ET. BBL 2033330057.

Look up another building