5 floors · 5,260 sq ft · built 1900 · class H8 · owner of record: Unisys Chelsea Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-23 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 10, 2026 | Quality of Life CLASS - 1 PERMANENT DWELLING USED/CONVERTED FOR OTHER THAN PERMANENT RESIDENTIALPURPOSES. DEPARTMENT OF BUILDINGS RECORDS INDICATES PREMISES TO BE LEGALLY APPROVED AS A CLASS 'A' MULTIPLE DWELLING. NOW ROOMS 2B, 2D, 2E, #35725904Z | Jan 11, 2027 PENDING | $50,000 |
| Mar 10, 2026 | Public Assembly CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1(2014 CODE); 27-542; BC 1008.2(2022 CODE) CREATING A HAZARDOUS CO #35725906M | Jan 11, 2027 PENDING | $2,500 |
| Mar 10, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR AS PER BC 1018.1(2008 CODE); 27-366; BC 1021.1(2014 CODE); BC 1006.3(2022 CODE). FOR TRANSIENT #35725905K | Jan 11, 2027 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Dec 7, 2021 | CONSTRUCTION OBSERVED APPROX. 3'-0" X 5'-0" SECTION OF BRICK VENEER INCLUDING STONE LINTEL MISSING OVER THE 4TH FLOOR WINDOW AT EXPO # 01. ALSO OBSERVED STONE LINTELS ARE DETERIORATED, CRACKS, SPALLING 2ND TO 4TH FLOOR LEVEL. STEP CRACKS UNDERNEATH FIRE ESCAPE BALCONY AT 3RD FLOOR AT EXPO # 01. #21-01698 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #00630 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 10:32 AM ET. BBL 1007530033.