10 floors · 127 apartments · 165,390 sq ft · built 1950 · class RM · owner of record: Name Not On File
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-10-08 (Accepted). Agency page | Dec 31, 2026 in 66 days | 3 of 3 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 165,390 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $536,900 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 483 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 898). Agency page | Dec 31, 2028 in 797 days | Next due 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 23, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, NO CERTIFICATE OF CORRECTION ON FILE, NO CLASS ONE CONDITIONS OBSERVE #39164541R | Oct 1, 2026 DEFAULT | $1,280 |
| Oct 23, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION NO CLASS ONE CONDITION OBSERVED, NO CERTIFICATE OF CORRECTION ON FILE. #39164542Z | Oct 1, 2026 DEFAULT | $1,280 |
| May 21, 2024 | Construction CLASS - 1 UNLAWFUL ACTS: FAILURE TO COMPLY WITH COMMISSIONER"S ORDER AND FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01, REGARDING UNSAFE, UNSUITABLE WIRING., COMPLY WITH COMMISSIONER'S ORDER; FIL #39114896K | Jul 25, 2024 DEFAULT | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00808 | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00807 | DOB VIOLATION - ACTIVE |
| Nov 22, 2022 | CONSTRUCTION FTM BLDG IN CODE COMPLIANT MANNER. OBSERVED CRACK IN MORTAR JOINT ON PARAPET CORNICE ON EXP1 NORTH EAST END EAST ELEVATION. REMEDY: REPAIR DAMAGED CORNICE ON PARAPET #LL0602RF | DOB VIOLATION - ACTIVE |
| Jun 28, 2022 | CONSTRUCTION FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES CRACKS WERE OBSERVED ON PARAPET/CORNICE ON EXP 1 EAST ELEVATION REMEDY: MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES. PROVIDE ADEQUATE SAFETY MEASURES, REPAIR DAMAGED FACADE AS PER 1RCNY 103-04 #LL0601RF | DOB VIOLATION - ACTIVE |
| Mar 10, 2021 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #909283 | DOB VIOLATION - ACTIVE |
| Aug 10, 2018 | FACADE SAFETY PROGRAM #HAZ87556 | DOB VIOLATION - ACTIVE |
| Oct 11, 2017 | CONSTRUCTION BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION # 140552426. STOP ALL WORK IMMEDIATELY, MAKE SITE SAFE #0605RS | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 10, 2021 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Apr 5, 2019 | Elevators EVCAT1 | Active |
| Apr 5, 2019 | Elevators EVCAT1 | Active |
| Apr 5, 2019 | Elevators EVCAT1 | Active |
| Aug 10, 2018 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 8:50 PM ET. BBL 1008987501.