Manhattan · Block 1975 · Lot 1 · 10027

3040 Broadway

9 floors · 476,512 sq ft · built 1910 · class W6 · owner of record: Teachers College Columbia Univerity

129open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
70dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 70 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 476,512 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 191 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 191 days
Annual filing
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1975). Agency page

Dec 31, 2035
in 3357 days
Next due 2035
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-22 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $2,142,450 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SAFE (2026-09-01)

Open violations

ECB / OATH (8) · $1,250 owed
IssuedViolationHearingBalance
Feb 4, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING FACADE WALL"S" AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION I OBSERVED AT EX #1, NORTH ELEVATION, SPALLING STONE BETWEEN 5TH AND 7TH FLOOR. AT EX #3, SOUTH ELEVATION, UNSECURE
#35726632Z
May 21, 2026
IN VIOLATION
$1,250
Oct 2, 2024Construction CLASS - 2
OBSERVED IN THE BASEMENT. SPRINKLER HEADS FOR EVERETT LOUNGE AND MILBANK CHAPEL TIED INTO DOMESTIC WATER LINE AND NOT THE DEDICATED FIRE LINE IN THE BUILDING. ALSO NO BACK FLOW PREVENTER ON SPRINKLER SYSTEM. RE
#39126303Y
Mar 21, 2025
IN VIOLATION
$0
Apr 1, 2021Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITON OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#806793.AGG1:PRIOR NOV 37010535X UNDER 28
#37021222Z
Oct 7, 2021
IN VIOLATION
$0
Dec 5, 2019Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING TOWER-COLUMNS SPALLING BRICK CO-VING. BOILER CHIMNEY BRICK NORTHSIDE MISSING GROUT. SOUTH ROOF MISSING TILES. COOLING TOWER INSULATION MISSING. DEFECTIVE, DUNNAGE RUSTING.
#35365825Y
Feb 13, 2020
IN VIOLATION
$0
May 18, 2018Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#806793. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT
#37010535X
Sep 27, 2018
IN VIOLATION
$0
Jun 20, 2017Unknown CLASS - 2
FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000000393 HASBEEN INSPECTED,TESTED,AND DISINFECTED,AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED,BY NOVEMBER 1,2016.REM:FILE ANNUAL CERT
#37003460P
May 24, 2018
ADMIT/IN-VIO
$0
May 31, 2017Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDIGN FACDE AND APPURTENANCES.NOTE:SOUTH ELEVATIN EXPOSURE #1 LOOSE AND DETERIORATING MOTAR JOINTS AT TWO LOCATIONS ABOVE 5TH FLOOR.SPALLED EYEBROW AT 2ND FLOOR.SPALLING BRICK AL
#35253941P
Oct 5, 2017
IN VIOLATION
$0
Dec 18, 2007Elevators Non-Hazardous
39Z10.39-REPAIR ROOM OVERHEAD CEILING.
#38179256N
Feb 14, 2008
STIPULATION/IN-VIO
$0
DOB (48)
IssuedViolationStatus
Oct 21, 2024CONSTRUCTION
EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE. IMMINENT CONDITIONS SUCH AS BULGING/DISPLACED AND SPALLING MASONRY OBSERVED.NO SAFETY MEASURES IN PLACE @ EXP1-S,EXP4-E & EXP3-N. REMEDY:IMMEDIATELY TAKE/PROVIDE SAFETY TO PROTECT PUBLIC. IMMEDIATELY REMOVE LOOSE MATERIAL AND MAKE REPAIRS UNDER SUPERVISI
#LL10901RM
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#42174
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#42173
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#42172
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#21351
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#21350
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#21349
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#23192
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#23194
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#23193
DOB VIOLATION - ACTIVE
Mar 11, 2022HAZARDOUS CONDITION (FACADE)
CYCLE 9A UNSAFE REPORT FILED
#910131
DOB VIOLATION - ACTIVE
Mar 11, 2022FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
#00443
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00666
DOB VIOLATION - ACTIVE
Nov 14, 2019ELEVATOR

#9028/666498
DOB VIOLATION - ACTIVE
Nov 12, 2019ELEVATOR

#9028/666478
DOB VIOLATION - ACTIVE
Nov 12, 2019ELEVATOR

#9028/666482
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#00051
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#00053
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#00052
DOB VIOLATION - ACTIVE
Apr 5, 2019ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
#05521
DOB VIOLATION - ACTIVE
Apr 5, 2019ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
#05522
DOB VIOLATION - ACTIVE
Apr 5, 2019ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
#05523
DOB VIOLATION - ACTIVE
May 31, 2018NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
#00270
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#00080
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#00078
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#00079
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#00089
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#00091
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#00090
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#12852
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#12851
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#12850
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#12849
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#04124
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#04122
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#04123
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#12854
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#12853
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#13971
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#13973
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#13972
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#04728
DOB VIOLATION - ACTIVE
Aug 15, 2012ELEVATOR

#ACC100970
DOB VIOLATION - ACTIVE
Dec 13, 2011ELEVATOR

#EVCAT104750
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#09752
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#09751
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01663
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01664
DOB VIOLATION - ACTIVE
DOB NOW Safety (74)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Mar 11, 2022Facades FISPFCS
CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
Active
Mar 11, 2022Facades FISPHAZ
CYCLE 9A UNSAFE REPORT FILED
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 5, 2019Elevators EVCAT1
Active
Apr 5, 2019Elevators EVCAT1
Active
Apr 5, 2019Elevators EVCAT1
Active
May 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active

Showing 60 of 74. Full list on the agency site.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 12:18 PM ET. BBL 1019750001.

Look up another building