Bronx · Block 5701 · Lot 105 · 10463

3030 Godwin Terrace

3 floors · 40,400 sq ft · built 1925 · class W1 · owner of record: St Johns Rc Church

12open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
67dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 67 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 40,400 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 188 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 188 days
Annual filing
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-23 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (8)
IssuedViolationHearingBalance
Mar 24, 2026Construction CLASS - 2
REISSUE ON ECB #35717156M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED CLASSROOM AND SMOKE DOORS NOT SELF-CLOSING DUE TO BINGING MISSING OR FAULTY HARDWARE ON CLASSROOMS, 311, 310,
#35727272Z
Apr 10, 2026
POP/IN-VIO
$0
Mar 24, 2026Construction CLASS - 2
28-301.1. REISSUE ON ECB #35717154Z. UNLAWFUL PLACEMENT OF FURNISHINGS, DECORATIONS OR OTHER OBJECTS AT EXITS THAT OBSTRUCT ACCESS TO EGRESSFROM OR VISIBILITY THERE OF PER FDNY 2008 CODE; FC 1027.4. NOTED: THER
#35727273K
Apr 10, 2026
POP/IN-VIO
$0
Mar 24, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: FIRE STOPPING MISSING IN SEVERAL LOCATIONS THROUGHOUT ELECTRIC, SWITCH GEAR ROOM, BOILER ROOM, GAS METER ROOM
#35727274M
Apr 10, 2026
POP/IN-VIO
$0
Mar 24, 2026Construction CLASS - 2
EXIT DOOR NOT SELF-CLOSING. NOTED: EMERGENCY EXTERIOR EXIT DOOR NOT SELF-CLOSING DUE TO BINDING, HARDWARE OR FAULTY HARDWARE ON EXTERIOR HARDWARE ON EXTERIOR DOOR 1ST FLOOR 3C AND EXTERIOR K/D 1ST FLOOR STAIR B
#35727275Y
Apr 10, 2026
POP/IN-VIO
$0
Apr 8, 2025Construction CLASS - 2
REISSUE#35678775M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED FIREPROOF SELF CLOSING DOORS AT 3 FL,310,309,307,300,200,206,110,105B,103 NOT CLOSING PROPERLY.REM:COMPLY WITH CODE.
#35717156M
Aug 15, 2025
POP/IN-VIO
$0
Apr 8, 2025Construction CLASS - 2
28-301.1 REISSUE#35678974P UNLAWFUL PLACEMENT OF FURNISHINGS,DECORATIONS OR OTHER OBJECTS AT EXITS THAT OBSTRUCT ACCESS TO EGRESS FROM OR VISIBILITY.THERE IS FURNITURE ON 2 FLOORS AT THE END OF THE HALLWAYS.BOO
#35717154Z
Aug 15, 2025
POP/IN-VIO
$0
Apr 9, 2024Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVEDINTERIOR FIRE-PROOF SELF CLOSING DOORS LOCATED AT 3 FLR.-310, 309, 307, 300. AT 2 FLR.-200, 206. AT 1 FLR.-110, 105B, 103 ARE NOT CLOSING PR
#35678775M
May 17, 2024
POP/IN-VIO
$0
Apr 9, 2024Construction CLASS - 2
28-301.1. UNLAWFUL PLACEMENT OF FURNISHINGS, DECORATIONS OR OTHER OBJECTS AT EXITS THAT OBSTRUCT ACCESS TO EGRESS FROM OR VISIBILITY THEREOFPER FDNY 2008 CODE; FC 1027.4. NOTED: OBSERVED THROUGHOUT THE OCCUPIED
#35678974P
May 17, 2024
POP/IN-VIO
$0
DOB (2)
IssuedViolationStatus
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#17487
DOB VIOLATION - ACTIVE
Jun 9, 1994LOCAL LAW 62/91 - BOILERS

#02822
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Aug 29, 1995Boiler LL6291
Active
Jun 9, 1994Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 2:38 PM ET. BBL 2057010105.

Look up another building