1 floors · 12,577 sq ft · built 1930 · class G1 · owner of record: T.K. Management, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR OF BUILDING. AT ALL EXPOSURES OF THE BUILDING, VERTICAL AND HORIZONTAL CRACKS EXTEND THROUGHOUT THE FACADE. ADDITIONALLY, FABRICATED STEEL SUPPORTS HAVE BEEN INSTALLED AT EXPOSURES #39205081N | Dec 4, 2026 PENDING | $2,500 |
| Sep 22, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. OBSERVED AT EXPOSURE 3, MECHANICAL AND INDUSTRIAL EQUIPMENT, TIRES, CABINETS, AND OTHER MISCELLANEOUS ITEMS IMPROPERLY STORED AND ACCUMULATED ON THE PREMISES, CREATING #39205080L | Dec 4, 2026 PENDING | $1,250 |
| Mar 22, 2007 | Construction Non-Hazardous WORK W/O A PERMIT-BASEMENT BUSINESS OFFICE & AUTO REPAIR PARTITIONS THRU OUT BUSINESS OFFICE.REMEDY:OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITION. #34568162X | Sep 21, 2007 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 22, 2026 | CONSTRUCTION REQUESTING A STRUCTURAL STABILITY REPORT DUE TO VERTICAL AND HORIZONTAL CRACKS THAT EXTEND THROUGHOUT THE FA ADE AT ALL EXPOSURES. ADDITIONALLY, FABRICATED STEEL SUPPORTS HAVE BEEN INSTALLED AT EXPOSURES 2 AND 3 TO SECURE SECTIONS OF THE FA ADE. #26-02265 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 22, 2026 | DOB | CONSTRUCTION: REQUESTING A STRUCTURAL STABILITY REPORT DUE TO VERTICAL AND HORIZONTAL CRACKS THAT EXTEND THROUGHOUT THE FA ADE AT ALL EXPOSURES. ADDITIONALLY, FABRICATED STEEL SUPPORTS HAVE BEEN INSTALLED AT EXPOSURES 2 AND 3 TO SECURE SECTIONS OF THE FA ADE. | Open |
| Sep 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN EXTERIOR OF BUILDING. AT ALL EXPOSURES OF THE BUILDING, VERTICAL AND HORIZONTAL CRACKS EXTEND THROUGHOUT THE FACADE. ADDITIONALLY, FABRICATED STEEL SUPPORTS HAVE BEEN INSTALLED AT EXPOSURES | Open |
| Sep 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. OBSERVED AT EXPOSURE 3, MECHANICAL AND INDUSTRIAL EQUIPMENT, TIRES, CABINETS, AND OTHER MISCELLANEOUS ITEMS IMPROPERLY STORED AND ACCUMULATED ON THE PREMISES, CREATING | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 10:53 PM ET. BBL 2057120070.