2 floors · 2,750 sq ft · built 1910 · class O7 · owner of record: 3009 Mmlt, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 18, 2025 | Cranes and Derricks CLASS - 1 WHILE OPERATING THE ARTICULATING BOOM CRANE THE OPERATOR WHILE LIFTINGA PALLET OF ROOFING PAPER 18 ROLLS 1800LBS ROTATE THE CRANE WITHOUT EXTENDING THE STABILIZERS WHICH CAUSED THE CRANE TO FLIP OVER AND THE BO #39138765R | Mar 1, 2027 DEFAULT | $25,000 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 1:24 PM ET. BBL 3050050007.