16 floors · 610 apartments · 527,043 sq ft · built 1954 · class D6 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 256). Agency page | Dec 31, 2026 in 69 days | Due this year |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 527,043 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-16 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | On file | Cycle 10 filing on record: UNSAFE (2025-10-06) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 28, 2026 | Construction CLASS - 2 28-305.1. OWNERS RESPONSIBILITIES-FAILURE TO MAINTAIN RETAINING WALL-AS NOTED-AT THE TIME OF INSPECTION, OBSERVED A RETAINING WALL(RW) ALONGEXPOSURE #3 OF THE SUBJECT ADDRESS. THE RW WAS OBSERVED TO BY ALONG A #35726914R | May 7, 2026 POP/IN-VIO | $0 |
| May 16, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED NETTING ETC. WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04. NOTE: AT TIME OF INSPECTION ON A DOCUMENTED #35693864J | Jun 10, 2025 POP/IN-VIO | $0 |
| May 16, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED NETTING ETC. WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04. NOTE: AT TIME OF INSPECTION ON A DOCUMENTED #35693863H | Jun 10, 2025 POP/IN-VIO | $0 |
| Sep 29, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR OR BUILDING FACADE AND APPURTENANCES.NOTEOBSERVED AT ROOF LEVEL,LOOSE BRICKS,VERTRICAL CRACKED BRICKWORK AND DAMAGED MORTAR JOINTS AT THE CHIMNEY.REMEDY:TAKE SAFETY MEASURES AND REP #35669127J | Jan 5, 2023 POP/IN-VIO | $0 |
| Mar 18, 2010 | Construction CLASS - 1 SEC 3319.5(2) 21865 EXPIRED CERTIFICATE OF OPERATION PER MASTCLIMBER. CD3778 EXPIRED 2/21/10. CN 812-09 SERIAL # T-53-07. REMEDY: RENEW CD/ COMPLY WITH CODE #34803302X | Sep 16, 2010 WRITTEN OFF | $0 |
| Mar 18, 2010 | Construction CLASS - 1 SEC 3319.5(2) 21864. EXPIRED CERTIFICATE OF OPERATION FOR MASTCLIMBER.CD 3783 EXPIRED 2/23/10. CN 813-09 SERIAL NO T-52-07. REMEDY: RENEW CD/COMPLY WITH CODE #34803303H | Sep 16, 2010 WRITTEN OFF | $0 |
| Mar 3, 2010 | Construction CLASS - 1 (MISC)BC3319.5(2)EXPIRED CERTIFICATE OF OPERATION FOR MAST CLIMBER CD 3780 EXPIRED 2/22/10 CN 608/09.REM:RENEW CD #34803183M | May 27, 2010 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 1, 2024 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00007 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00042 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00043 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00041 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00040 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| May 1, 2024 | Retaining Walls FTF-RW-INITL | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 1, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 5, 2024 |
| Mar 15, 2023 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jun 18, 2023 |
| Feb 15, 2022 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | May 21, 2022 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)