2.75 floors · 3 apartments · 2,376 sq ft · built 1925 · class C0 · owner of record: Shi, Gui Yun
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 25, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39182938Y AS OF 6/25/2026., FILE A CERTIFICATE #39193755P | Sep 2, 2026 DEFAULT | $6,250 |
| Jun 25, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION FOR VIO#39182940N . OBSEVVED AT EXP#4 APPROX 36" HIGH CMU RETAINING WALL AT EXP 4 IS COLLAPSING. LEANING APPROX 60". CORNER IS SEPARA #39193768Y | Sep 2, 2026 DEFAULT | $25,000 |
| Jun 25, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION FOR VIO#39182937M OBSERVED AT EXP#3 REAR DECK IN A STATE OF DISREPAIR ,MISSING RAILING ,MISSING HAND RAIL LEADING TO YARD ,MISSING AN #39193763P | Sep 2, 2026 DEFAULT | $25,000 |
| Jun 25, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39182939X AS OF 6/25/2026., FILE A CERTIFICATE #39193752J | Sep 2, 2026 DEFAULT | $6,250 |
| Jun 25, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39182948H AS OF 6/25/2026., FILE A CERTIFICATE #39193760J | Aug 5, 2027 DEFAULT | $6,250 |
| Apr 1, 2026 | Construction CLASS - 1 UPPER CMU RETAINING WALL IS MISSING THE REQUIRED #6 REBAR PER THE DWGS. ENTIRE RUN OF WALL OBSERVED ONLY 1 REBAR EXTENDED. BALANCE OF WALL CORES SHOW NO REBAR. 1 CORE HAD REBAR HALF WAY UP. DWGS CALL FOR #6 REB #39182948H | Jul 15, 2026 IN VIOLATION | $2,500 |
| Apr 1, 2026 | Construction CLASS - 1 OBSERVED AT EXP 1 FIRE ESCAPE EGRESS BLOCKED. DROP DOWN LADDER IS OBSTRUCTED BY HOUSEHOLD DEBRIS AND TRASH. CHAIRS, OLD BED FRAME, TABLE ETC., REPAIR AND/REPLACE #39182938Y | Jul 15, 2026 IN VIOLATION | $2,500 |
| Apr 1, 2026 | Construction CLASS - 1 APPROX 36" HIGH CMU RETAINING WALL AT EXP 4 IS COLLAPSING. LEANING APPROX 60". CORNER IS SEPARATED WITH LARGE GAPS APPROX 3/4". CREATING A RISK OF INJURY TO PERSONS AND PROPERTY., REPAIR AND/REPLACE #39182940N | Jul 15, 2026 IN VIOLATION | $2,500 |
| Apr 1, 2026 | Construction CLASS - 1 WRAP AROUND DECK AT EXP 3 AND 4 IN STATE OF DISREPAIR. APPROX 40' OF MISSING RAILING. (6' DROP) STAIRS TO GRADE MISSING RAILINGS. DECK BOARDS MOVING. PILE OF BRICKS ON DECK. AREAS OF MISSING DECK BOARDS. DECK P #39182937M | Jul 15, 2026 IN VIOLATION | $2,500 |
| Apr 1, 2026 | Unknown CLASS - 1 AT EXP 2 MINISPLIT AC WITH ELECTRICAL 208 VOLT 23 AMP DISCONNECT. AT EXP 3 NEW EXTERIOR OUTLET. NO ELECTRICAL PERMIT ON FILE. PBSERVED AT 3:30 PM., OBTAIN PERMIT #39182939X | Jul 15, 2026 IN VIOLATION | $1,250 |
| Mar 15, 2023 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O AND/OR DEPARTMENT OF BUILDING RECORDS. PARTITIONS ERECTED CREATING AN ILLEGAL CLASS "A" APARTMENT AT BASEMENT. UNLAWFUL GAS RANGE AND KITCHEN PRESENT. ALSO FULL BATH #35486353X | Dec 6, 2024 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 3, 2026 | CONSTRUCTION VACATE DECK AT REAR AND RIGHT SIDE OF HOUSE (EXP 3,4). DECK IS SEVERELY DETERIORATED AND UNSAFE. MISSING RAILINGS, STAIRS MISSING RAILINGS AND UNSAFE. DECK HAS PILES OF BRICKS AND DEBRIS POSSIBLE OVERLOAD OF STRUCTURE. POTENTIAL RISK OF INJURY TO PUBLIC AND PROPERTY #26-00965 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 7, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 10, 2026 |
| Jun 12, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 15, 2025 |
| Jun 18, 2024 | A | § 27-2048 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS MISSING NEAR FIRE STAIRS OR WALL , 1st STORY | Sep 21, 2024 |
| Jun 18, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT VESTIBULE , 1st STORY | Jul 2, 2024 |
| Jun 18, 2024 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS , 1st STORY | Jul 23, 2024 |
| Mar 20, 2023 | B | § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, GAS RANGE AT ILLEGAL CLASS-''A'' APARTMENT CREATED AT BASEMENT | Apr 24, 2023 |
| Mar 20, 2023 | B | § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS TO BATHTUB, AND RESIDENTIAL SINK AT ILLEGAL CLASS ''A'' APARTMENT AT BASEMENT | Apr 24, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 4:32 AM ET. BBL 5008350247.