Brooklyn · Block 5072 · Lot 17 · 11218

30 Westminster Road

4 floors · 45 apartments · 47,060 sq ft · built 1925 · class C1 · owner of record: 15 & 30 Westminsterroad Realty Co

39open violations
$0ECB/OATH penalties owed
10HPD class C (immediately hazardous)
69dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 69 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 85 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 47,060 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 313 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 434 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-08 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#33473
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (38) · C 10 · B 25 · A 3
IssuedClassViolationCorrect by
Jul 1, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 4TH MARBLE TREAD FROM BOTTOM UP AT PUBLIC HALL STAIRS, 1st STORYAug 5, 2026
Jul 1, 2026A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMAOct 4, 2026
Jun 29, 2026A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMAOct 2, 2026
Jun 29, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 4TH MARPLE TREND FROM BOTTOM UP AT VESTIBULE NORTH SECTION AT PUBLIC HALL STAIRSAug 3, 2026
Jan 30, 2025BApt 3J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3J, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMar 6, 2025
Jan 30, 2025BApt 3K · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTMar 6, 2025
Jan 30, 2025BApt 3I · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3I, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHMar 6, 2025
Jan 15, 2025C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Jan 19, 2025
Jan 15, 2025C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Jan 19, 2025
Oct 1, 2024BApt 1J · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE AT BATHTUB IN THE ENTIRE APARTMENT LOCATED AT APT 1J, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 5, 2024
Aug 2, 2024BApt 1J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD WALL CABINET IN THE KITCHEN LOCATED AT APT 1J, 1st STORY, 1st APARTMENT FROM NORTH AT EASTSep 6, 2024
May 19, 2023CApt 1G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1G, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''South''Jun 14, 2023
Apr 6, 2023BApt 1D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT EAST WALL IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH ORIGINAL VIOLATION 15601163 ISSUED 05-DEC-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATMay 11, 2023
Feb 28, 2023BApt 1E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTApr 4, 2023
Feb 28, 2023CApt 2J · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMar 26, 2023
Feb 28, 2023CApt 2J · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTMar 26, 2023
Feb 28, 2023BApt 1E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTApr 4, 2023
Feb 28, 2023BApt 1E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL AND CEILING APPROXIAMATELY 15 SQUARE FEET IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTApr 4, 2023
Feb 28, 2023BApt 1E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINLYL FLOOR TILES THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTApr 4, 2023
Feb 28, 2023BApt 1E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE WALL AT SOUTH IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTApr 4, 2023
Dec 19, 2022BApt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL APPROXIMATELY 8 SQ FT, EAST WALL 4 SQ FT, WEST WALL 4 SQ FT IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJan 23, 2023
Dec 2, 2022BApt 4D · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''north''Jan 6, 2023
Dec 2, 2022BApt 4D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILE FLOOR IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''north''Jan 6, 2023
Dec 2, 2022BApt 4D · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASHBASIN IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''north''Jan 6, 2023
Nov 28, 2022CApt 1J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 34 SQ.FT. CEILING IN THE BATHROOM LOCATED AT APT 1J, 1st STORY, 1st APARTMENT FROM NORTH AT EASTDec 24, 2022
Sep 30, 2022CApt 1D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHOct 26, 2022
Jul 2, 2021AApt 1H · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING ACOUSTICAL TILES IN THE FOYER LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTHOct 5, 2021
Oct 2, 2020CApt 2G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WESTOct 28, 2020
Dec 24, 2019BApt 2D · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE KEY OPERATED LOCK INSTALLED AT DOOR LEADING TO FIRE ESCAPE WINDOW LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WESTJan 28, 2020
Apr 25, 2018BApt 3B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PARQUET WOOD FLOOR AT WALKING AREA IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHMay 30, 2018
Jan 3, 2011CApt 2K · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, EAST WALL IN THE KITCHEN LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORJan 29, 2011
Aug 25, 2010B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING AT CENTER YARDSep 29, 2010
Aug 19, 2010BApt 1E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHSep 23, 2010
Oct 16, 2008BApt 4H · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR SADDLE IN THE ENTRANCE LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTHNov 20, 2008
Jun 3, 2008BApt 1E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 1 STY SOUTHWEST APT 1E CENTER ROOM. LOCATED AT APT 1EJul 8, 2008
Jun 3, 2008BD26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PLASTERBOARD CLG CELLAR THROUGHOUT NORTH & SOUTH.Jul 8, 2008
Jun 3, 2008BApt 1E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING 1 STY SOUTHWEST APT 1E KITCHEN & BATHROOM. LOCATED AT APT 1EJul 8, 2008
Aug 18, 1986CApt 4H · D26-12.01 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING SOUTHWEST ROOM 4 STY SOUTHWEST APT 4H BRADSHAW NO PHONE. , SECTION '' ''Sep 7, 1986

Issued in the last 120 days

DateSourceWhatNow
Jul 1, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 4TH MARBLE TREAD FROM BOTTOM UP AT PUBLIC HALL STAIRS, 1st STORYOpen
Jul 1, 2026HPD A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMAOpen
Jun 29, 2026HPD A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMAOpen
Jun 29, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 4TH MARPLE TREND FROM BOTTOM UP AT VESTIBULE NORTH SECTION AT PUBLIC HALL STAIRSOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 12:40 AM ET. BBL 3050720017.

Look up another building