Manhattan · Block 827 · Lot 64 · 10010

30 West 26 Street

12 floors · 88,000 sq ft · built 1909 · class O6 · owner of record: 30w26 Land, L.P.

6open violations
$3,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
165dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 88,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 827). Agency page

Dec 31, 2027
in 409 days
Next due 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $75,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 461 days
No Cycle 10 report on record yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-11 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $3,750 owed
IssuedViolationHearingBalance
Aug 27, 2026Construction CLASS - 2
ATOI OBSERVED IN BASEMENT PVC PIPE USED ON HOT WATER HEATER VENTING. PER PC 701.9 PLASTIC PIPE. PLASTIC PIPING AND FITTINGS SHALL NOT BE USED., REPAIR AND/OR REPLACE
#39202147N
Nov 5, 2026
PENDING
$1,250
Aug 27, 2026Unknown CLASS - 1
B1C8 - CLASS 1 - ELECTRICAL WORK DOES NOT CONFORM TO APPROVED SUBMITTAL DOCUMENTS/AMENDMENTS. ATOI OBSERVED ELECTRICAL WORK AT 1ST FLR COMMERCIAL SPACE DOES NOT CONFORM TO PERMITTED SCOPE OF WORK. JOB# M0145194
#39202135X
Nov 5, 2026
PENDING
$2,500
DOB (3)
IssuedViolationStatus
Dec 26, 2010ELEVATOR

#9027/366386
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Dec 6, 2010ELEVATOR

#9027/366386
DOB VIOLATION - ACTIVE
Aug 8, 2002LOCAL LAW 11/98 - FACADE

#NRF50652
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 14, 2026AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 14, 2026DOB SafetyAEUHAZ: Open
Aug 27, 2026ECBConstruction: ATOI OBSERVED IN BASEMENT PVC PIPE USED ON HOT WATER HEATER VENTING. PER PC 701.9 PLASTIC PIPE. PLASTIC PIPING AND FITTINGS SHALL NOT BE USED., REPAIR AND/OR REPLACEOpen
Aug 27, 2026ECBUnknown: B1C8 - CLASS 1 - ELECTRICAL WORK DOES NOT CONFORM TO APPROVED SUBMITTAL DOCUMENTS/AMENDMENTS. ATOI OBSERVED ELECTRICAL WORK AT 1ST FLR COMMERCIAL SPACE DOES NOT CONFORM TO PERMITTED SCOPE OF WORK. JOB# M0145194Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 3:19 AM ET. BBL 1008270064.

Look up another building