Manhattan · Block 860 · Lot 7504 · 10016

30 East 31 Street

42 floors · 42 apartments · 62,367 sq ft · built 2017 · class RD · owner of record: 31st Street Zef Llc

9open violations
$4,725ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 62,367 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 860). Agency page

Dec 31, 2030
in 1505 days
Next due 2030
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-06 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

On fileCycle 10 filing on record: SAFE (2026-04-30)

Open violations

ECB / OATH (4) · $4,725 owed
IssuedViolationHearingBalance
Mar 21, 2023Construction CLASS - 2
NO WORK ACTIVITY. VIOLATION # 39509126K UNDER COMPLAINT # 1627077 FOR CHIMNEY EXTENSION ISSUED ON 11/15/22 NOT COMPLIANCE. NO CERTIFICATE OF CORRECTION AND NO ACCESS TO VERIFY CHIMNEY CONDITION.
#39514402Y
Jun 22, 2023
IN VIOLATION
$1,250
Dec 2, 2022Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG FACADE&APPURTENANCES.NOTE:AS PREV DOB VIO#08172022LL0505RF OBSERVED@EXP1,3,4 (E,S,W ELEVATIONS) DISLODGE PANELS@PARAPET WALL IN SEVERAL LOCATIONS&ALSO DEFECTIVE PANELS SAME PRE
#35669433H
Mar 9, 2023
IN VIOLATION
$625
Nov 21, 2022Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG WALLS&APPURTENANCES.AS NOTED:ATOI I OBSERVED ON EXP2,3,4:DEFECTIVE VENT PANELS@ROOF PARAPET,PANELS@ROOF PARAPET APPEARS DEFECTIVE,DAMAGED,OR LOOSE.ROOF:ROOF PARAPET MASONRY WAL
#35664145K
Jul 6, 2023
IN VIOLATION
$1,250
Nov 15, 2022Construction CLASS - 1
RESPONSIBILITY OF OWNER OF TALLER BUILDING: 40 STORY 459 FT NEW BUILDING ERECTED IN CLOSE PROXIMITY(WITHIN APPROXIMATELY 2 FEET) OF NEIGHBORING PROPERTY'S, 12 STORY EXISTING BUILDING'S, ACTIVE CHIMNEY AT EXPOSU
#39509126K
Feb 2, 2023
IN VIOLATION
$1,600
DOB (2)
IssuedViolationStatus
Oct 4, 2023FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00948
DOB VIOLATION - ACTIVE
Aug 17, 2022CONSTRUCTION
FTM EXTERIOR BLDG WALLS AND APPURTENANCES. ON EXP2 EAST ELEV AND EXP4 WEST ELEV-VENT PANELS AT TOP FLOORS/PARAPET APPEARS TO BE DISLODGED AND NEED TO BE SURED. REMEDY: MAINTAIN EXTERIOR BLDG WALLS AND APPURTENANCES, PROVIDE ADEQUATE SAFETY MEASURES AS PER 1RCNY 103-04
#LL0505RF
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 4, 2023AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 2:15 PM ET. BBL 1008607504.

Look up another building