1 floors · 9,287 sq ft · built 1935 · class K1 · owner of record: Woodside Mehra Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 57 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 788 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 17, 2026 | Construction CLASS - 2 FAILURE TO CERTIFY CORRECTIONS FOR VIOLATION NUMBER 39148384M, FILE A CERTIFICATE OF CORRECTION #39196551R | Nov 17, 2026 PENDING | $1,250 |
| Jul 17, 2026 | Construction CLASS - 1 FAILURE TO CERTIFY CORRECTIONS FOR VIOLATION NUMBER 39148385Y, COMPLY WITH COMMISSIONER'S ORDER #39196550P | Nov 17, 2026 PENDING | $2,500 |
| Jul 17, 2026 | Construction CLASS - 2 FAILURE TO CERTIFY CORRECTIONS FOR VIOLATION NUMBER 39148386X, FILE A CERTIFICATE OF CORRECTION #39196552Z | Nov 17, 2026 PENDING | $1,250 |
| Jun 17, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NOTED : VIOLATION #39145801K ISSUED ON 04/18/2025 WWP FOR (30-96 51 STREET) AT TIME OF INSPE #39192931K | Dec 1, 2026 PENDING | $1,250 |
| Jun 12, 2026 | Construction CLASS - 2 WORK WITHOUT A PERMIT. I OBSERVED IN THE BASEMENT OF THE PROPERTY NEWLY INSTALLED GAS LINES COMING FROM THE METER LABELED 30-96 AND LEADING TO A HOT WATER TANK. I ALSO OBSERVED IN THE BASEMENT RECENTLY INSTALLE #39192421K | Nov 17, 2026 PENDING | $1,250 |
| Jun 12, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN. I OBSERVED IN THE BASEMENT OF THE PROPERTY A FUTURE CONNECTION ON A GAS LINE TO A HOT WATER TANK. AS PER FGC 404.15 FUTURE CONNECTIONS ARE PROHIBITED. I ALSO OBSERVED IN THE BASEMENT PVC WA #39192420Z | Nov 17, 2026 PENDING | $1,250 |
| May 19, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OF A 1 STORY COMMERCIAL SPACE SECOND MEANS OF EGRESS NOT MAINTAINED. OBSERVED WALLS ERECTED AT REAR OF COMMERCIAL SPACE COMPROMISING #39148384M | Apr 13, 2027 PENDING | $2,500 |
| May 19, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION AT 1 STORY COMMERCIAL SPACE OBSERVED WALLS ERECTED AT REAR. UPON REVIEW DEPARTMENT OF RECORDS, NO PERMITS WERE FOUND FOR INTERIOR WORK AT LOCATION TO SUB DIVIDE SPAC #39148385Y | Apr 13, 2027 PENDING | $2,500 |
| May 19, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OF A 1 STORY COMMERCIAL SPACE AT CELLAR LEVEL OBSERVED SECOND MEANS OF EGRESS OBSTRUCTED BY COMBUSTIBLE MERCHANDISE ITEMS. CREATING H #39148386X | Apr 13, 2027 PENDING | $2,500 |
| May 2, 2025 | Unknown CLASS - 2 I OBSERVED THROUGHOUT THE THE CLEANERS STORE OPEN BOXES, EXPOSED HANGING UNPROTECTED WIRES, UNGROUNDED BX CABLES, EXPOSED OUTLETS WITH MISSING COVERS., COMPLY WITH EC #39146959P | Jan 27, 2026 IN VIOLATION | $0 |
| May 2, 2025 | Unknown CLASS - 2 I OBSERVED NEW ELECTRICAL INSTALLATION 100 PERCENT COMPLETED THROUGHOUT THE BARBER SHOP, NEW HVAC UNIT, OUTLETS, SWITCHES, LIGHT FIXTURES,PANEL BOX WITH BREAKERS AND BRANCH WIRING. IN THE BIKE SHOP I OBSERVED O #39146961Y | Jan 27, 2026 IN VIOLATION | $0 |
| Apr 18, 2025 | Construction CLASS - 2 WORK WITHOUT A PERMIT. NOTE: OBSERVED CONSTRUCTION WORK HAS BEEN DONE TO ERECT FULL HEIGHT PARTITION TO CREATE TWO ROOMS AND BATHROOM AT MEDICAL OFFICE (30-96 51 ST) AT THIS LOCATION WITHOUT A PERMIT., OBTAIN A #39145801K | Jan 20, 2026 IN VIOLATION | $0 |
| Apr 18, 2025 | Construction CLASS - 2 WORK WITHOUT A PERMIT. NOTE: OBSERVED PLUMBING WORK HAS BEEN DONE TO INSTALL WASTE AND WATER LINES TO CREATE NEW BATHROOM AT MEDICAL OFFICE (30-96 51 ST) AT THIS LOCATION WITHOUT A PERMIT., OBTAIN ALL PERMITS #39145800Z | Jan 20, 2026 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 19, 2025 | CONSTRUCTION ENGINEER'S REPORT REQUESTED FOR 2ND MEANS OF EGRESS THROUGHOUT THE ENTIRE BLOCK & LOT OF SAID PROPERTY - ALL STOREFRONTS #25-00866 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 17, 2026 | ECB | Construction: FAILURE TO CERTIFY CORRECTIONS FOR VIOLATION NUMBER 39148384M, FILE A CERTIFICATE OF CORRECTION | Open |
| Jul 17, 2026 | ECB | Construction: FAILURE TO CERTIFY CORRECTIONS FOR VIOLATION NUMBER 39148385Y, COMPLY WITH COMMISSIONER'S ORDER | Open |
| Jul 17, 2026 | ECB | Construction: FAILURE TO CERTIFY CORRECTIONS FOR VIOLATION NUMBER 39148386X, FILE A CERTIFICATE OF CORRECTION | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 4, 2026, 5:12 PM ET. BBL 4007530001.