Queens · Block 615 · Lot 7 · 11102

30-73 31 Street

1 floors · 2,000 sq ft · built 1920 · class F1 · owner of record: Lic Property Management

4open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
793dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 793 days
Next cycle year 2028

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Oct 3, 2023Plumbing CLASS - 2
IMPROPER DRAINAGE. NOTED: OBSERVED AT REAR OF RESIDENTIAL PROPERTY A LEADER AND GUTTER SYSTEM LEADS WATER DIRECTLY ONTO ADJACENT PROPERTY AT 3071 31 STREET, WHICH FURTHER DUMPS WATER ONTO LOWER ADJACENT PROPERT
#39096280X
Dec 12, 2023
ADMIT/IN-VIO
$0
Apr 16, 2021Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED REAR FACADE ROOF DOWNSPOUTS ARE INSTATE OF DISREPAIR CONDITION. ALSO OBSERVED ROOF DRAIN LEADER PIPE NOT CONNECTED TO STORM DRAIN SYSTEM AND RAIN WATER SIPPING THROUGH ADJACENT PR
#39039521R
Jun 1, 2021
ADMIT/IN-VIO
$0
DOB (1)
IssuedViolationStatus
Nov 27, 2001CONSTRUCTION

#01FS03
VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 12:25 AM ET. BBL 4006150007.

Look up another building