5 floors · 130,960 sq ft · built 1923 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 696). Agency page | Dec 31, 2026 in 62 days | Due this year |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page | Dec 31, 2026 in 62 days | 4 of 4 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 130,960 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 6, 2026 | Construction CLASS - 2 REISSUE #35693190M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION NOTED SEVERAL EMERGENCY L #35727110X | Mar 4, 2026 POP/IN-VIO | $0 |
| Feb 6, 2026 | Construction CLASS - 2 REISSUE #35693192X. AT THE TIME OF INSPECTION NOTED: SMOKE DOORS NOT SELF-CLOSING. STAIRWAY Y-4TH FLOOR, STAIRWAY D-2ND FLOOR, AUDITORIUM-2 ENTRY LOCATIONS, FIRST FLOOR BY ELEVATOR, FIRST FLOOR BY EXIT 3 AND 12 #35727109Z | Mar 4, 2026 POP/IN-VIO | $0 |
| Feb 6, 2026 | Construction CLASS - 2 REISSUE ECB #35693194J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. AT THE TIME OF INSPECTION I OBSERVED CEILINGS AND WALLS SPALLING AND CRACKING AT BULKHEADS A, B, D, E AND F. REMEDY: REPAIR AND/OR R #35727111H | Mar 4, 2026 POP/IN-VIO | $0 |
| Mar 18, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT BULKHEADS A,B,D,E & F CEILING & WALLS SPALLING AND CRACKS.REM:REPAIR AND/OR REPLACE. #35693194J | Jul 8, 2025 POP/IN-VIO | $0 |
| Mar 18, 2025 | Construction CLASS - 2 REISSUE#35676473H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 2 FLOOR BOX#2B,2L,1 FL AND 3 LIGHTS,CAFT. 2 LIGH #35693190M | Jul 8, 2025 POP/IN-VIO | $0 |
| Mar 18, 2025 | Construction CLASS - 2 REISSUE#35676420M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED ROOF LEVEL FROM ROOM OLD SIDE RUNNING & STEP CRACK THROUGHOUT WALLS.REM:REPAIR AND/OR REPLACE. #35693193H | Jul 8, 2025 POP/IN-VIO | $0 |
| Mar 18, 2025 | Construction CLASS - 2 REISSUE#35676471Y FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT CORRIDOR BY ELEVATOR,SMOKE BY 505,510,4 FL.CORRIDOR BY 412(5)BY STAIR F,CORRIDOR BY 409.CORRIDOR 402,3FL.CORRIDOR BY 308,313,2FL #35693192X | Jul 8, 2025 POP/IN-VIO | $0 |
| Feb 27, 2024 | Construction CLASS - 2 REISSUE#35671977Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED INTERIOR FIREPROOF SELF CLOSING DOORS NOT CLOSING OR OPENING PROPERLY AT SEVERAL LOCATIONS:5TH FL SMOKE DOORS BY ROOM 505 & OLD/NEW #35676471Y | Apr 22, 2024 POP/IN-VIO | $0 |
| Feb 27, 2024 | Construction CLASS - 2 REISSUE#35671978K FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT ROOF LEVEL FAN ROOM VERTICAL CRACK IN WALL THAT RUNS ALONG THE CHIMNEY ADDITIONALLY OUTSIDE THE FAN ROOM CHIMNEY HAS MISSING MORT #35676470M | Apr 22, 2024 POP/IN-VIO | $0 |
| Feb 27, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED EXISTING EMERGENCY LIGHTS HOT OPERATIVE IN AUDITORIUM(2 LIGHTS) IN NOR #35676473H | Apr 22, 2024 POP/IN-VIO | $0 |
| Feb 14, 2023 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING SMOKE DOOR ON 3RD FLOOR NEXT STWY D NOT CLOSING PROPERLY ALSO 2 FL NEXT STWY D,2FL STWY A & SOUTH PLAY/LUNCH ROOMDOOR.REM:REPAIR/REPLACE DOOR. #35671977Z | May 30, 2023 POP/IN-VIO | $0 |
| Feb 14, 2023 | Construction CLASS - 2 REISSUED#3564437P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT ROOF LEVEL IN THE FAR ROOM ON THE OLD BUILDING SOLD HAS A RUNNINGCRACK AND SPALLING AND MISSING MASONRY IN VARIOUS AREA.REM:REPAIR AND #35671978K | May 30, 2023 POP/IN-VIO | $0 |
| Mar 11, 2022 | Construction CLASS - 2 REISSUE#35548357Y.NOTED AT ROOF LEVEL,THE FAN ROOM HAS RUNNING CRACKS AND SPALLING AND MISSING MASONRY IN VARIOUS AREAS THROUGHOUT.REMEDY:REPAIR AND/OR REPLACE. #35644379P | Jun 28, 2022 POP/IN-VIO | $0 |
| Mar 17, 2021 | Construction CLASS - 2 REISSUE35486654J NOTED:@ROOF LEVEL FANRM;HAS MISSING MASONRY@CEILING&RUNNING STEP CRACKS ON WALLS.REPAIR &/OR REPLACE. #35548357Y | Jul 6, 2021 POP/IN-VIO | $0 |
| Feb 18, 2020 | Construction CLASS - 2 REISSUE#35401637M DATE OF ISSUE 2-20-19 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER AT ROOF LEVEL FAN ROOM(EAST SIDE)VERTICAL CRACKS ON WALL & AT CEILING BREAKING CONCRETE,OXIDIZING STEEL ROOM. #35486654J | Jun 2, 2020 POP/IN-VIO | $0 |
| Feb 20, 2019 | Construction CLASS - 2 REISSUE #35291029Y DATE OF ISSUE 01.25.2018 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER AT ROOF LEVEL FAN ROOM (EAST SIDE) VERTICAL CRACKS ON WALLS AND AT CEILING BRAKING CONCRETE, OXIDIZING STEEL. RM #35401633P | May 14, 2019 POP/IN-VIO | $0 |
| Jan 25, 2018 | Construction CLASS - 2 REISSUE VIOLATION #34901876F FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE:AT ROOF LEVEL FAN ROOM(EAST SIDE)VERTICAL CRACKS ON WALLS AND AT CEILING BRAKING CONCRETE,OXIDIZING STEEL.REM:REPAIR OR RE #35291029Y | Apr 17, 2018 POP/IN-VIO | $0 |
| Mar 6, 2017 | Construction CLASS - 2 REISSUE#34901876Y FAILURE TO MAINTAIN BLDG IN CODE COMPLAINT MANNER. NOTED: AT ROOF LEVEL,FAN ROOM(EAST SIDE),VERTICAL CRACKS IN VARIOUS PLACES. REMEDY: COMPLY W/CODE/REPAIR VERTICAL CRACKS. #35234844J | Apr 25, 2017 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #30745 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #30746 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08455 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08456 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #19736 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #19737 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 9:29 PM ET. BBL 4006960014.