Brooklyn · Block 179 · Lot 7503 · 11217

30 3 Avenue

14 floors · 148,500 sq ft · built 1927 · class RB · owner of record: Owner Name Unavailable

24open violations
$0ECB/OATH penalties owed
9HPD class C (immediately hazardous)
68dto Annual boiler inspection (3 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-11 (Accepted). Agency page

Dec 31, 2026
in 68 days
1 of 3 without an accepted 2026 report yet
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $190,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 120 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 148,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1164 days
Next cycle year 2029
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 179). Agency page

Dec 31, 2029
in 1164 days
Next due 2029

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Mar 25, 2025Construction CLASS - 1
UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT. UNSAFE COMBUSTIBLE STORAGE IN MECHANICAL ROOM. GAS POWER PRESSURE WASHER, LOCATED IN BASEMENT. POTENTIAL FIRE HAZARD., MAINTAIN STORAGE IN COMPLIANCE WITH F
#39142732M
Jul 9, 2025
IN VIOLATION
$0
DOB (4)
IssuedViolationStatus
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#07298
DOB VIOLATION - ACTIVE
May 2, 2019FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01772
DOB VIOLATION - ACTIVE
Dec 6, 2016FACADE SAFETY PROGRAM

#HAZ86339
DOB VIOLATION - ACTIVE
Jul 30, 2013LL11/98-LOCAL LAW 11/98 - FACADE

#HAZ74265
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
May 2, 2019Benchmarking - LL84 FTF-EN-BENCH
Active
Dec 6, 2016Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
Jul 30, 2013Facades LL11/98
CYCLE 7A UNSAFE REPORT FILED
Active
HPD (13) · C 9 · B 1 · A 3
IssuedClassViolationCorrect by
May 26, 2026CApt 824 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 824, 8th STORY, 4th APARTMENT FROM EAST AT SOUTHJun 21, 2026
Mar 24, 2026AApt 852 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 852, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''Jun 27, 2026
Jan 26, 2026AApt 739 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT B-ROOM 739, 7th STORY, 1st B-ROOM FROM WEST AT NORTH , SECTION AT NORTHMay 1, 2026
Dec 22, 2025CApt 3D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 8th APARTMENT FROM NORTH AT EASTJan 17, 2026
Feb 24, 2025AApt 739 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 739, 7th STORY, 1st APARTMENT FROM WEST AT NORTHMay 30, 2025
Oct 18, 2024CApt 824 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 824, 8th STORY, 4th APARTMENT FROM EAST AT SOUTHNov 13, 2024
Oct 15, 2024CApt 824 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 824, 8th STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTHNov 10, 2024
Oct 7, 2024CApt 824 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ROOM LOCATED AT B-ROOM 824, 8th STORY, 4th B-ROOM FROM EAST AT SOUTHNov 2, 2024
Sep 3, 2024CApt 927 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE 1st ROOM FROM NORTH LOCATED AT B-ROOM 927, 9th STORY, 3rd B-ROOM FROM WEST AT NORTH , SECTION ''center''Sep 29, 2024
Jul 5, 2024CApt 1153 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE 1st ROOM FROM NORTH LOCATED AT B-ROOM 1153, 11th STORY, 3rd B-ROOM FROM WEST AT NORTH , SECTION ''north''Jul 31, 2024
Nov 28, 2023BApt 1008 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1SQUARE FOOT ON THE CAULKING AT WEST WALL AROUND WASHBASIN, IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT B-ROOM 1008, 10th STORY, 8th B-ROOM FROM EAST AT SOUTH , SECTION ''SOUTH'' ORIGINAL VIOLATION 1Jan 2, 2024
Mar 21, 2022CApt 3W · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3W, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHApr 16, 2022
Jul 26, 2021CApt 3W · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3W, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHAug 21, 2021

Issued in the last 120 days

DateSourceWhatNow
Jul 22, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES LOCATED AT B-ROOM 720, 7th STORY, 1st B-ROOM FROM NORTH AT EASTClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 11:32 PM ET. BBL 3001797503.

Look up another building