Queens · Block 576 · Lot 49 · 11102

30-14 29 Street

4 floors · 20 apartments · 14,000 sq ft · built 1928 · class C1 · owner of record: 30-14 29th St

10open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
63dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 794 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Jul 27, 2011CONSTRUCTION

#0107SA
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (9) · C 2 · B 6 · A 1
IssuedClassViolationCorrect by
Jun 6, 2025BApt B3 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT B3, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJul 11, 2025
Jun 6, 2025BApt B3 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT B3, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJul 11, 2025
Jun 6, 2025CApt B3 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT B3, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJun 20, 2025
Jun 5, 2025BApt A2 · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR PROVIDE APPROVED TYPE GATE IN THE ENTIRE APARTMENT LOCATED AT APT A2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTHJul 10, 2025
Jun 5, 2025CApt A2 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AND LATCH IN THE ENTRANCE LOCATED AT APT A2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTHJun 19, 2025
Jun 5, 2025BApt A2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH ASSEMBLY ON DOOR IN THE ENTRANCE LOCATED AT APT A2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTHJul 10, 2025
Jun 5, 2025A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTEDSep 8, 2025
Jun 5, 2025B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH ASSEMBLY ON DOOR TO EAST YARD AT PUBLIC HALL, 1st STORYJul 10, 2025
Jan 28, 2025BApt B3 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET AT CEILING IN THE BATHROOM LOCATED AT APT B3, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 17303785 ISSUED 26-SEP-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-20Mar 4, 2025

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 1:40 PM ET. BBL 4005760049.

Look up another building