6 floors · 50 apartments · 44,735 sq ft · built 1920 · class D1 · owner of record: Diego Beekman Mutual Housing Assoc Housi Ng Development Fund Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 59 days | Annual |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-20 (Accepted). Agency page | Dec 31, 2026 in 59 days | 1 of 3 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 75 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 44,735 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 180 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 180 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 303 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 790 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 16, 2024 | Boilers CLASS - 2 FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 20000071222Y0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FO #37032109K | Mar 21, 2025 IN VIOLATION | $0 |
| Mar 4, 2020 | Construction CLASS - 1 BC3314.4.3.1 INSPECTION PRIOR TO THE INSTALLATION OF A SUSPENDED SCAFFOLD AT TIME OF INSPECTION ACTIVE JOBSITE I OBSERVED AT ROOF LEVELA SUSPENDED ROPE SCAFFOLD.UPON REQUEST TO SEE INSPECTION REPORT MORE WAS PR #35471993M | Jan 22, 2021 IN VIOLATION | $0 |
| Mar 4, 2020 | Construction CLASS - 1 BC3314.4.1.5 NOTIFICATION OF ADJUSTABLE SUSPENDED SCAFFOLD INSTALLATION & REMOVAL.AT TIME OF INSPECTION ACTIVE JOBSITE I OBSERVED SUSPENDED ROPE SCAFFOLD AT ROOF LEVEL AT EXPO#1.UPON REVIEW IN BIS,DEPT WAS NOT #35471992K | Jan 22, 2021 IN VIOLATION | $0 |
| May 17, 2013 | Construction CLASS - 2 ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C/O AS PER 28-118.3.1-28-118.3.2. 1ST FLR DAYCARE CENTER OCCUPIED W/EXPIRED TC #201005937, EXPIRED9.24.06. ENTIRE BLDG OCCUPIED W/O A VALID C/O. REMEDY:OBTAIN VALID C/O #35014973L | Sep 13, 2013 IN VIOLATION | $0 |
| Jun 11, 2009 | Construction CLASS - 2 ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERT OF OCCUPANCY PER 28-118.3.1-28-118.3.2 NOTED BLDG OCCUPIED BUT TEMPORARY CERT OF OCCUPANCY #201005937T001 EXP ON 09/24/06 REM: OBTAIN VALID CERT OF OCCUPAN #34791577J | Nov 10, 2009 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05834 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #05585 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #41425 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #20889 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #42247 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08522 | DOB VIOLATION - ACTIVE |
| Sep 2, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #02063 | DOB VIOLATION - ACTIVE |
| Sep 2, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #02062 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #04491 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #05942 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #05362 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #05361 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #04416 | DOB VIOLATION - ACTIVE |
| Aug 30, 2006 | ELEVATOR #1719/209938 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Sep 2, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 2, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 15, 2025 | B | Apt 2B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION '' | Aug 19, 2025 |
| Jul 15, 2025 | B | Apt 2BB · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2BB, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ' | Aug 19, 2025 |
| Jul 15, 2025 | B | Apt 6A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION '' | Aug 19, 2025 |
| Jul 15, 2025 | B | Apt 5CC · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5CC, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ' | Aug 19, 2025 |
| Jul 15, 2025 | B | Apt 6AA · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6AA, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ' | Aug 19, 2025 |
| Jul 10, 2025 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jul 14, 2025 |
| Jul 10, 2025 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jul 14, 2025 |
| Mar 11, 2024 | B | Apt 5A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MOLD AT WEST WALL APPROXIMALY 15 SQFT IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 15, 2024 |
| Mar 11, 2024 | C | Apt 5A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK WATER PENETRATION AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 17, 2024 |
| Oct 2, 2023 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Nov 6, 2023 |
| Oct 2, 2023 | B | Apt 2A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL APPROX 10 SQ FT AT WEST WALL APPROX 8 SQ FT AT NORTH WALL APPROX 8 SQ FT IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Nov 6, 2023 |
| Oct 2, 2023 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Nov 6, 2023 |
| Oct 2, 2023 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, WEST, NORTH WALL IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Jan 5, 2024 |
| Mar 31, 2022 | A | Apt 5B · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MARBLE SADDLE IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 4, 2022 |
| Mar 31, 2022 | B | Apt 5B · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE BASE CABINET AT WASH BASIN IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | May 5, 2022 |
| Mar 31, 2022 | B | Apt 5B · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT WATER CLOSET IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | May 5, 2022 |
| Mar 28, 2022 | B | Apt 5B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | May 2, 2022 |
| Mar 28, 2022 | A | Apt 3E · § 27-2005 ADM CODE REFIT THE ENTRANCE DOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jul 1, 2022 |
| Mar 28, 2022 | B | Apt 3E · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | May 2, 2022 |
| Mar 28, 2022 | A | Apt 3E · § 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jul 1, 2022 |
| Mar 28, 2022 | A | Apt 3E · § 27-2005 ADM CODE REFIT THE ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jul 1, 2022 |
| Mar 28, 2022 | B | Apt 5B · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | May 2, 2022 |
| Mar 28, 2022 | B | Apt 4A · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | May 2, 2022 |
| Mar 28, 2022 | B | Apt 4A · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | May 2, 2022 |
| Mar 28, 2022 | B | Apt 5B · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTE LINE UNDER WASH BASIN IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | May 2, 2022 |
| Mar 28, 2022 | C | Apt 4A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 23, 2022 |
| Mar 8, 2022 | B | Apt 1CC · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL/ BUZZER INTERCOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TO THE APARTMENT WALL PANEL LOCATED AT APT 1CC, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 12, 2022 |
| Jan 5, 2022 | B | Apt 2E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING AND SPLINTERING WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Feb 9, 2022 |
| Jan 5, 2022 | B | Apt 2E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING AND SPLINTERING WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Feb 9, 2022 |
| Jan 5, 2022 | B | Apt 2E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING AND SPLINTERING WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Feb 9, 2022 |
| Dec 9, 2021 | B | Apt 2E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING AND SAGGING PARQUET WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Jan 13, 2022 |
| Dec 9, 2021 | B | Apt 2E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING AND SAGGING PARQUET WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Jan 13, 2022 |
| Dec 9, 2021 | B | Apt 2E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING AND SAGGING PARQUET WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Jan 13, 2022 |
| Dec 9, 2021 | A | Apt 2E · § 27-2005 ADM CODE REFIT UPPER AND LOWER SASHES WINDOWS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Mar 14, 2022 |
| Feb 20, 2019 | B | Apt 5AA · § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS , IN THE ENTRANCE LOCATED AT APT 5AA, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 27, 2019 |
| Feb 13, 2019 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BOILER ROOM | May 19, 2019 |
| Jun 20, 2016 | C | Apt 2C · § 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER | Jul 18, 2016 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 9:43 PM ET. BBL 2025680045.