Bronx · Block 3285 · Lot 41 · 10458

2975 Decatur Avenue

6 floors · 37 apartments · 38,819 sq ft · built 1942 · class D1 · owner of record: Bekimi Associates

30open violations
$0ECB/OATH penalties owed
18HPD class C (immediately hazardous)
56dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 56 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 56 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 72 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 38,819 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 177 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 177 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 300 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1152 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-01 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
May 18, 2018Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#808148. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT
#37010593Y
Sep 21, 2018
ADMIT/IN-VIO
$0
DOB (6)
IssuedViolationStatus
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00904
DOB VIOLATION - ACTIVE
Feb 14, 2020ELEVATOR

#9027/628234
DOB VIOLATION - ACTIVE
May 31, 2018NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
#00478
DOB VIOLATION - ACTIVE
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#06743
DOB VIOLATION - ACTIVE
Jan 31, 2005LOCAL LAW 62/91 - BOILERS

#07453
DOB VIOLATION - ACTIVE
May 17, 1993LOCAL LAW 62/91 - BOILERS

#01768
DOB VIOLATION - ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
May 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Active
Jan 3, 2008Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
May 17, 1993Boiler LL6291
Active
HPD (18) · C 18 · B 0 · A 0
IssuedClassViolationCorrect by
Jan 29, 2021CApt A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT A, 1st BSMT-APT FROM NORTH AT EASTFeb 2, 2021
Jan 22, 2021CApt 5F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTHJan 26, 2021
Jan 22, 2021CApt 2C · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTJan 26, 2021
Jan 22, 2021CApt 2F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJan 26, 2021
Jan 22, 2021CApt 4A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 26, 2021
Jan 22, 2021CApt 4B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHJan 26, 2021
Jan 22, 2021CApt 4D · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EASTJan 26, 2021
Jan 22, 2021CApt 5A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 26, 2021
Jan 22, 2021CApt 6F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM WEST AT NORTHJan 26, 2021
Jan 22, 2021CApt 2A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 26, 2021
Jan 22, 2021CApt 2B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJan 26, 2021
Jun 24, 2020CApt 1E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 1E, 1Jul 18, 2020
Mar 10, 2020CApt 1E · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORYMar 16, 2020
Mar 10, 2020CApt 1B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORYMar 16, 2020
Mar 10, 2020CApt 4E · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORYMar 16, 2020
Mar 10, 2020CApt 6E · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORYMar 16, 2020
Mar 10, 2020C§ 27-2056.4 ADM CODE- Correct failure to notify occupants and/or to investigate lead-based paint hazards.Mar 16, 2020
Feb 26, 2020CApt 1C · § 27-2056.7 ADM CODE: Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to Local Law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.Mar 3, 2020

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 5, 2026, 7:49 PM ET. BBL 2032850041.

Look up another building