9 floors · 34,827 sq ft · built 2014 · class W8 · owner of record: 297 North 7 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 34,827 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 789 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $65,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 841 days | Filing window not open yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 21, 2025 | Construction CLASS - 2 OBSERVED 1ST FL. LOBBY/MECH ROOMS/AREA INSTALLED ERECTED FULL PARTITIONS/SUBDIVISION CREATING ADDITIONAL ROOMS/AREA AND INSTALLED WATER/WASTE LINES FOR 2 BATHROOMS W/TOILETS SINKS, OBTAIN ALL PERMITS; OBTAIN PE #39151612M | Mar 16, 2027 PENDING | $1,250 |
| Jun 21, 2025 | Construction CLASS - 2 OCCUPANCY CONTRARY OF C OF O#320513244F NOTED: NOW 1ST FL. LOBBY/MECH RMS. AREA ILLEGALLY CONVERTED/USED AS A GYMNASIUM WITH WEIGHTS, DUMBBELLS ETC.., DISCONTINUE ILLEGAL OCCUPANCY OR AMEND C OF O; DISCONTINUE #39151613Y | Mar 16, 2027 PENDING | $1,250 |
| Dec 29, 2024 | Construction CLASS - 1 SUMMONS ISSUED FOR FAILURE TO MAINTAIN DUE TO DEFECTIVE/BROKEN GLASS WINDOW PANEL AT THE 5TH FLOOR LEVEL AT EXPOSURE #4 OF BUILDING, REPAIR AND/REPLACE #39133929L | Dec 22, 2026 | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Feb 19, 2020 | ELEVATOR #9027/668320 | DOB VIOLATION - ACTIVE |
| Feb 19, 2020 | ELEVATOR #9027/668321 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 11:49 AM ET. BBL 3023230045.