3 floors · 8 apartments · 6,993 sq ft · built 1899 · class C1 · owner of record: Good Faith Partners, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 789 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 7, 2022 | Construction CLASS - 1 AT TIME OF INSPECTION AT ACTIVE ALT#1 JOBSITE I OBSERVED 2 WORKERS DOING ACTIVE CONSTRUCTION WORK UPON SEARCH IN BIS SYSTEM IT REVEALED PERMIT#220665108 HAS EXPIRED ON 5-16-22 AND HAS NOT BEEN RENEWED. STOP ALL #39507306Z | Dec 2, 2022 DEFAULT | $6,250 |
| Dec 20, 2021 | Construction CLASS - 2 BC 3314.4 SUPPORTED PIPE SCAFFOLD,MAINTAINED AS PER CODE AT TIME OF INSPECTION OF 4 STORY ALT 1,ACTIVE JOBSITE OBSERVED AT EXP#3 SUPPORTED PIPE SCAFFOLD INSTALLED NOT AS PER CODE OBSERVED SUPPORTED PIPE SCAFFOL #35636932L | Mar 18, 2022 DEFAULT | $3,125 |
| Dec 20, 2021 | Unknown CLASS - 2 WORK WITHOUT A PERMIT.AT TIME OF INSPECTION OF 4 STORY ALT 1 ACTIVE JOBSITE,OBSERVED 8FT HIGH CONSTRUCTION FENCE INSTALLED AT EXP#4 UPON REVIEW THAT DEPARTMENT RECORDS(BIS AND DOBNOW)IT WAS OBSERVED THAT NO PER #35636933N | Mar 18, 2022 DEFAULT | $3,125 |
| Dec 2, 2021 | Unknown CLASS - 2 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES AS PER CODE.AT TIME OF INSPECTION OF 4 STORY ALT 1 ACTIVE JOBSITE AND AFTER PERFORMING FULL INSPECTION,OBSERVED THAT CONSTRUCTION SUPERINTENDENT FAILTED TO E #35636935R | Jul 8, 2022 DEFAULT | $5,000 |
| Dec 2, 2021 | Unknown CLASS - 1 PERMIT HOLDER FAILED TO ENSURE WORKERS RECEIVE SITE SAFETY ORIENTATIONAT TIME OF INSPECTION OF 4 STORY ALT 1,ACTIVE JOBSITE OBSERVED 8 WORKERS PERFORMING DELIVERY FLOORING BRICK REMOVING AND OTHER WORK.UPON REQ #35636930H | Mar 18, 2022 DEFAULT | $12,500 |
| Jun 17, 2021 | Construction CLASS - 1 BC3303.7.2 INADEQUATE FIRE EXTINGUISHERS.AT THE TIME OF MY ISPECTION,IOBSERVED SEVERAL CONDITIONS W/THE PORTABLE FIRE EXTINGUISHERS ON THE BASEMENT,1ST & 2ND FLOORS:(1)UNDERSIZED;(2)PLACED ON THE FLOORS;(3)MIS #35579263P | Sep 3, 2021 IN VIOLATION | $2,500 |
| Mar 26, 2021 | Construction CLASS - 1 INADEQUATE HOUSEKEEPING AT TIME OF INSPECTION OF AN ACTIVE JOBSITE,I OBSERVED AT 3RD FLOOR LEVEL CONDITION MATERIALS AND DEBRIS SCATTERED THRIVE AT FLOOR CAUSING TRIP,FALL AND FIRE HAZARD FOR WORKERS ONSITE AND #35550777N | Jan 14, 2022 IN VIOLATION | $625 |
| Aug 27, 2013 | Construction CLASS - 1 WORK W/O A PERMIT. NOTED: AT 1ST STORY REAR,PARTITIONS ERECTED TO CREATE ONE SRO.ALSO WATER AND WASTE LINES TO INSTALL A RESIDENTIAL SINK, GAS LINE INSTALLED TO HOOK UP GAS STOVE. RMDY: OBTAIN PERMIT OR RESTOR #35029872Y | Oct 18, 2013 WRITTEN OFF | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 3, 2024 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Nov 24, 2025 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| May 13, 2024 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGNAGE MISSING AT PUBLIC HALL, 1st STORY | May 19, 2024 |
| Mar 16, 2015 | B | Apt 1 · § 9, 170, 171, 300, 301, 302 M.D.LAW-FILE PLANS AND APPLICATION AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE CONVERSION FROM A PRIVATE DWELLING TO MULTIPLE DWELLING USE IF LAWFULLY FEASIBLE OR RESTORE TO LAWFUL OCCUPANCY LOCATED AT APT 1, 1st STORY, APARTMENT AT WEST | Apr 20, 2015 |
| Mar 16, 2015 | B | Apt 1 · § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF SHEETROCK WALLS AND STUDS ERECTED AT KITCHEN CREATING AN ILLEGAL CLASS ''A'' APARTMENT LOCATED AT APT 1, 1st STORY, APARTMENT AT WEST | Apr 20, 2015 |
| Mar 16, 2015 | B | Apt 1 · § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF DISCONTINUE PLUMBING WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS AT KITCHENETTE OF ILLEGALLY CREATED ROOM (2F) AT SOUTH LOCATED AT APT 1, 1st STORY, APARTMENT AT WEST | Apr 20, 2015 |
| Sep 6, 2013 | B | Apt 1FL · § 9, 170, 171, 300, 301, 302 M.D.LAW-FILE PLANS AND APPLICATION AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE CONVERSION FROM A PRIVATE DWELLING TO MULTIPLE DWELLING USE IF LAWFULLY FEASIBLE OR RESTORE TO LAWFUL OCCUPANCY IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 1st STORY | Oct 11, 2013 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 4:09 AM ET. BBL 2023140067.