3 floors · 100,126 sq ft · built 1937 · class K3 · owner of record: Ca 2952 Holdings Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 100,126 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2362). Agency page | Dec 31, 2032 in 2258 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 21, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. SUBJECT IS A SEMI-ATTACHED 5-STORY STORE BLDG W/COMMERCIAL USE ON AN INTERIOR THROUGH BLOCK LOT. EXP 1 IS ON BERGEN AVENUE SIDE AND EXP 3 IS ON THIRD AVE #35733244M | Dec 4, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Sep 21, 2026 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITIONS W/EXTERIOR WALL AT EXP1/2 CORNER-LARGE VERT CRACKS TO MASONRY CMU WALL & ADDT'L CRACKS ALONG THE PARAPET WALL @ EXP2. OWNER TO IMMED RETAIN REG DISING PROF IN GOOD STANDING WITH DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 10/05 #PI20101AG | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01914 | DOB VIOLATION - ACTIVE |
| Sep 2, 1994 | CONSTRUCTION #013H | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 21, 2026 | DOB | CONSTRUCTION: CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITIONS W/EXTERIOR WALL AT EXP1/2 CORNER-LARGE VERT CRACKS TO MASONRY CMU WALL & ADDT'L CRACKS ALONG THE PARAPET WALL @ EXP2. OWNER TO IMMED RETAIN REG DISING PROF IN GOOD STANDING WITH DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 10/05 | Open |
| Sep 21, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. SUBJECT IS A SEMI-ATTACHED 5-STORY STORE BLDG W/COMMERCIAL USE ON AN INTERIOR THROUGH BLOCK LOT. EXP 1 IS ON BERGEN AVENUE SIDE AND EXP 3 IS ON THIRD AVE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 2:52 AM ET. BBL 2023620044.