16 floors · 273 apartments · 235,408 sq ft · built 1968 · class D1 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 235,408 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 7047). Agency page | Dec 31, 2027 in 415 days | Next due 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $810,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 467 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1146 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT CRITICAL OF EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL ABD APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #910210. REMEDY: SUBMIT ACCEPTABLE REQU #37027329X | May 6, 2024 POP/IN-VIO | $0 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT CRITICAL OF EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL ABD APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #910212. REMEDY: SUBMIT ACCEPTABLE REQU #37027328Y | May 6, 2024 POP/IN-VIO | $0 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT CRITICAL OF EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL ABD APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #910211. REMEDY: SUBMIT ACCEPTABLE REQU #37027330N | May 6, 2024 POP/IN-VIO | $0 |
| Nov 9, 2022 | Construction CLASS - 1 FIRE EXTINGUISHERS - OBSERVED, FIRE EXTINGUISHERS MISSING INSPECTION TAGS, MONTHLY INSPECTION NOT CONDUCTED AS PER 906.2.1.1 (LAST INSPECTION WAS CONDUCTED 09.01.22), PRESSURE GAUGE IS NOT IN OPERABLE POSITION, #39508921P | Mar 15, 2023 DEFAULT | $0 |
| Nov 9, 2022 | Construction CLASS - 1 DROPPING OR THROWING PROHIBITED - OBSERVED,WORKER DROPPING/ THROWING MATERIAL/ DEBRIS FROM ELEVATED 2ND FLOOR TO DUMPSTER WHICH WAS PLACED AT GROUND LEVEL (20 FEET DISTANCE), ABOVE THE DESIGNATED EGRESS/ BUILDI #39508926Y | Mar 15, 2023 DEFAULT | $0 |
| Nov 9, 2022 | Construction CLASS - 1 FAILURE TO COMPLY WITH NYC FIRE CODE - OBSERVED,WELDING OPERATIONS AT 2ND FL. HOT WORK PERMIT WAS NOT AVAILABLE OR PROVIDED UPON REQUEST. ALSO, NO FDNY PERMIT PROVIDED FOR TOWABLE DIESEL GENERATOR IN OPERATION #39508917M | Mar 15, 2023 DEFAULT | $0 |
| Dec 22, 2021 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO GUARD RAILS. AT TIME OF INSPECTION OBSERVED OPEN EXCAVATION AREA WITH AN APPROXIMATE 8' DROP NO FALL PROTECTION/GUARD RAILS I #39053278R | Nov 7, 2022 DEFAULT | $0 |
| Dec 17, 2021 | Construction CLASS - 2 JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION.AT THE TIME OF INSPECTION AT A 3 STORY NEW BUILDING AT FOUNDATION STAGE ACTIVE JOBSITE,OBSERVED CONSTRUCTION FENCE#B00397208-I1-FN NOT MAINTAIN #35632622H | Sep 14, 2022 DEFAULT | $0 |
| Jul 12, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN ONSITE/DISPLAY ONSITE DOC REQUIRED BY BCCH33 (NO DOT PERMIT) NOTE:ATOI I OBSERVED PROPOSED 2STYNB W/NO WORK ACTIVITY PRESENT.IT WAS ALSO OBSERVED CONTRACTOR FAILED TO POST DOT PERMITS FOR DO #35580092H | Jul 27, 2022 DEFAULT | $0 |
| Jul 12, 2021 | Construction CLASS - 2 PROJECT INFO PANEL/CONST SIGN NOT PROVIDED OR NOT IN COMPLIANCE W/SEC NOTED:ATOI I OBSERVED PROPOSED 7STYNB W/NO WORK PRESENT.IT WAS ALSO OBSERVED CONTRACTOR FAILED TO POST/DISPLAY PROJECT INFO PANEL OF CONST F #35580090Y | May 11, 2022 DEFAULT | $0 |
| Jul 12, 2021 | Construction CLASS - 2 FAILURE TO POST OR PROPERLY POST PERMIT FOR WORK@PREMISES.NOTE:ATOI I OBSERVED PROPOSED 2STYNB CURRENTLY@GRADE LEVEL W/NO WORK ACTIVITY PRESENT.IT WAS ALSO OBSERVED CONTRACTOR FAILED TO POST ANY PERMITS DEFAILI #35580091X | Nov 24, 2021 DEFAULT | $0 |
| Sep 2, 2012 | Construction CLASS - 2 SIDEWALK SHED DOES NOT CONFORM TO CODE SPECIFICATION: APPROX 16 ( )FT OF SHED IN STATE OF DISREPAIR KNOCKED OFF WOOD SUPPORTS & LEANING. REMEDY: CONFORM TO CODE SPECIFICATIONS. #34985369K | Oct 22, 2012 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #00237 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #00240 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #00239 | DOB VIOLATION - ACTIVE |
| Oct 16, 1989 | ELEVATOR #1277D\01 | DOB VIOLATION - ACTIVE |
| Oct 16, 1989 | ELEVATOR #1277D\02 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 28, 2016 | B | Apt 12C · SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE BATHROOM LOCATED AT APT 12C, 12th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 2, 2017 |
| Nov 28, 2016 | B | Apt 12C · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 12C, 12th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 2, 2017 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)