2 floors · 2 apartments · 2,600 sq ft · built 1931 · class B2 · owner of record: Chigbu, Lois E
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2019-03-08 (Accepted). Agency page | Dec 31, 2026 in 62 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 28, 2023 | Construction CLASS - 1 OCCUPANCY IN CONTRARY TO THAT ALLOWED BY C/O AND/OR DEPARTMENT ILLEGALLY CELLAR APARTMENT RENTED OUT AS 3 SROS EAST 2 ROOM#1 AND EAST 4 ROOM#3 WERE VACANT EAST 3 ROOM#2 WAS OCCUPIED.NO 2ND MEANS OF EGRESS PRESE #35486414K | Oct 31, 2025 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #09001 | DOB VIOLATION - ACTIVE |
| Mar 1, 1990 | CONSTRUCTION #102V | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 11, 2026 | A | Apt 2 · § 27-2005 ADMIN. CODE: REFIT DOORS AT SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 14, 2026 |
| Jun 11, 2026 | A | Apt 2 · § 27-2026 ADMIN. CODE: RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .... IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 14, 2026 |
| Jun 11, 2026 | A | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 14, 2026 |
| Jun 11, 2026 | B | § 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AND FURNITURE AT PUBLIC HALL, 2nd STORY | Jul 16, 2026 |
| Jun 11, 2026 | A | Apt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 14, 2026 |
| Apr 27, 2026 | C | Apt 2 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | May 21, 2026 |
| Apr 24, 2026 | A | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 28, 2026 |
| Apr 24, 2026 | A | Apt 2 · § 27-2026 ADMIN. CODE: RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL : IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 28, 2026 |
| Apr 24, 2026 | A | Apt 2 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HANDLE AT SHUT-OFF VALVE AT RADIATOR IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 28, 2026 |
| Apr 24, 2026 | A | Apt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 28, 2026 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 6:19 PM ET. BBL 2045510017.